ML20065J860: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[L-90-378, Forwards Rev 8 to Guard Training & Qualification Plan]]
| number = ML20065J860
| issue date = 11/05/1990
| title = Forwards Rev 8 to Guard Training & Qualification Plan
| author name = Plunkett T
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000250, 05000251
| license number =
| contact person =
| document report number = L-90-378, NUDOCS 9011140249
| package number = ML20065J867
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 10
}}
 
=Text=
{{#Wiki_filter:m                                    _.
      .          0 4
P.O. Ben eastee, Miami, n, mies.steo C ' . ",
L-90-378 EE                                      10 CFR'50.54 10 CFR 73.21-U. S. Nuclear Regulatory Cummission Attn:    Document Control Desk                          NOV 0 51990 Washington, D. C. 20555-Gentlemen:
Re:    Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Guard Training and Qualification Plan Revision-8 S.1dmittal Under 10'CFR 50.54 fo)
Florida Power and Light Company (FPL).'has issued Revision 8 to the Turkey Point Training and Qualification Plan and has determined that the revision does not decrease the safeguards effectiveness of the plan.        Pursuant to 10'CFR 50.54 (p), a description 'of the revision and copies PTNTQP-R08-4 through PTNTQP-R08-7 of the' plan are enclosed.
Enclosure 1 to this letter is a listing cf changes incorporated in a set of marked-up Revision -7 pages., . Enclosure 2 'contains directions for incorporating Revision 8 and copies of Revision 8' of the plan.
The enclosed material does not contain safeguards-information..                  .
By copies of this letter, we are forwarding. copies'of PTNTQP-R08-2 and 3 to the Nuc. tear Regulatory Commission',    Region ~II.
Very truly yours, k
T. F. Plunkett
                                            ~
Vice President Turkey Point Plant Nuclear KNH/DPS/ds                                  >
Enclosures cc:  Stewart D. Ebneter, Regional Administrator, Region II',JUSNRC (2 copies)                                    .
j Senior Resident Inspector, USNRC, Turkey Point Plant . (with ;
L                            enclosure 1.only) l                                                                    <
9011140249 901105 0 DR ADOCK 0500                                                            .
    .                                                                                                    I an FPL Group company                                                          }
 
    -a  -          .s      .+m ,
44y .a  a          e I
O          p .
i                          e                              i I
l
* e ..
;          * .  ,        .                              J I
a b
h l
l 1
l ENCLOSURE 1 1
1 l
1 t
1-( .'
I l
                                                        .)
 
I i
i
                      .i                                                                                                    1 PLANT TURKEY POINT i                                                  TRAINING AND QUALIFICATIONS PLAN                                              ,
i REASONS FOR REVISIONS                                                  l l
REVISION 8                                                .i I
EAGE            EAB&      DESCRIPTION                        REASON FOR REVISION                    i i
COVER          N/A        DENOTING REV. 8                    REV. B                                l l
                                                                                                                        'l l
SR              N/A        DATE OF~ APPROVAL                  REV. B                                l LEP            N/A        REVISED PAGE LIST                  REV. 8 1
1-1            1.3        CLARIFY POSITIONS                . CLARITY 2-7            2.4.1      DELETED ADDITIONAL ADtdINISTRATIVE TIME                                                      ;
FCR AGILITY TESTING.              ONE HOUR TIME LIMIT 4-1            4.1        ADDITION THAT ARMED PERSONNEL ARE TO BE ARMED NITH ONLY THE il    i TYPE OF WEAPON-THEY -                                                    !
ARE QUALIFIED WITH.                CLARIFICATION                          *
                                                                                                                        -)
l
                                                                                                                        .1    -
l                                                                                                                              l 4
l
                                                                                                                        't i
9 I
i I
:j l                                                                                                                        l 1
                                                                                                                        .i I
 
O g :
l e                :
 
e                                I e
e                9 9 ,9                  l 9 g          .g                ]
I          '
l I
                                  'd t
i l
P ENCLOSURE 2 1
i t
1
                                  .i
 
        , ' 'h.                                                                        '
PLAN 1' TURREY POINT                            .:
TRAINING AND QUALIFICATIONS PIAN                          >
REASONS FOR REVISIONS                              i REVISION 8                                    j i
RAGE  EAB&      DESCRIPTION                REASON FOR REVISION          l COVER N/A        DENOTING REV. 8            REV. 8                      '
SR    N/A.      DATE OF APPROVAL          REV. 8                      !
LEP  N/A        REVISED PAGE LIST        'REV. 8 1-1  1.3        CLARIFY POSITIONS          CLARIT''
P 2-7  2.4.1      DELETED ADDITIONAL                                      l ADMINISTRATIVE TIME FOR AGILITY TESTING..      ONE HOUR TIME LIMIT 4-1  4.1        ADDITION:THAT ARMED                                    t PERSONNEL ARE TO BE                                    !
ARMED WITH ONLY THE                                    l TYPE OF WEAPON THEY ARE QUALIFIED WITH.        CLARIFICATION i
i I
I                                                                                        >
l
                                                                                          ?
i i
t
 
INSTRUCTIONS FOR INCORPORATING PTNTQP REVISION 8 Please update your copy of this document by removing appropriate pages and replacing them with the revised pages enclosed as indicated below.
SUPERSEDED PAGE                    REVISED PAGE Cover Page            R/7        . Caver Page        R/8 SR                    R/7          SR                R/8 LEP 1
* R/4          LEP'l              R/8 1-1                  R/7          1-1                R/8 2-7                  R/7          2-7-.              R/8 4-1                  R/7          4-1                R/8 l
i
 
                                                                                                                    . - - .-- ----      :: ; l l            .
i TRAINING AND QUALIFICATION PLAN
:i l                                              TURKEY P0 INT PLANT l
FLORIDA POWER AND. LIGHT COMPANY
                                                    %  w  des SERIAL NUMBER -PTNTOP-R As a recipient of this' document, you are res >onsible for affording proper controls anc  safeguards for the protection of all infomation contained herein at all times.
THIS' DOC      ENT SHALL NOT BE DUPLICATED OR ED WITHOUT AUTHORIZATION REP PREPARED BY:        h                          DATE:
* REVIEWED BY:      Mh              re. Manager / Nuclear os'o2 9e i          Security: Dept.                                  Date 4
REVIEWED BY: Turkey Point Plant Nuc1 ear Safety Committee              #              [d-/J9 APPROVED B
                                  ''        '~
ALL        Chaiman PNSC Turkey Point <                          ,
f!d(6)
                                                                                                            /Date APPROVED BY:      _
Plant Manager Turkey Point
                                                                                                          /'Dete
                                                                                                              /r fle    '
b l
APPROVED BY:        M                - Vice President                              ,h4!96-Turkey. Point T-y                                                                  'pate PTNTQP          ,
REV g
                                                                                                                              /h v
 
                                                                                                                              ~ 2 s                                                                                                            .                    ;
                ,                                                                                                                i 4  , ,. '
                    ~                                                                                                                l SUBNITTED REVISIONS TURKEY POINT PLANT 4                                            TRAINING AND QUALIFICATION PLAN SURNISSIONS                                                                    D&IE Revision 0                                                            ,08/17/79 Revision 1                                                                04/27/81.                ]
Revision 2                                                                  06/22/81 Revision 3                                                                  02/08/85 Revision 4                                                                  10/30/86                  ,
l Revision 5                                                                  08/16/88                J Revision 6                                                              06/09/89-htyf~ t.L !< {..
                                                                                                ;?~Jg ggy0.
hulptoH W            y                                                XX-XX-?'$
t I
1
                                                                                                                  ^
e I                                                                                                            *
                                                                                                              %-          g SR-N PTNTQP REV.j[              [
og-            .
 
                -.                                                                                    1
      -              -}                                                                              '
                                                                                                      '1 l
CHAPTER 1 - INTRODUCTION
                                  .                      .,'                                              i
 
==1.1        INTRODUCTION==
 
In accordance with the requirements of 10 CFR 73.55', Appendix 8, this Training and Qualification Plan outlines the process by which security force personnel assigned to Florida Power and Light Company's (FPL) Turkey Point Plant are selected, trained, tested and qualified.            '
Upgraded training requirements. submitted in Revision .07 ~ of this document shall be fully implemented within twelve months ofLthe date          .
:                        Revision 07 is approved by the Site Vice President - Turkey Point,              j l
                                                                                                          )
1.2        OBJECTIVE l
The objective of this plan;is to ensuri that the security force          !
is capable of performing assign,ed crucial tasks necessary to implement- l Turkey Point's Physt, cal Security.and Safeguards: Contingency plans.        j l                                                                                                        l f
l~
1.3        SCOPE This plan applies to the crucial -tasks identified 'and' the
'                        security personnel whose. positidns appear- in the Responsibility
,                        Matrix, Appendix A. This plan is not applicable to nor doe; it imply-t h                        a training program for FPL and contractor management. positions. WE
                        /hsi&rts M*~ Domwas My mm9ew &W5 o
my spews, ut Apewca A.                            ,
s s
* PTNTQP
                                        ,                    1-1  +                    .
                                                                                            'REV.g 2r
                                                                    ,F        .
 
responsible management personnel and by a professionally trained and licensed individual. If a verifying examination is performed which reveals no condition. which would interfere with the.
perfomance of assigned duties, the individual shall be permitted to continue assigned duties.
2.4 PHYSICAL FITNESS QUALIFICATIONS                                ,,
Subject to a prior physical examination conducted by a licensed physician and written certification that there are no medical reasons to preclude participation by the individual, ' armed personnel shall take a job related physical fitness test' before being assigned armed-duties.
2.4.1      Initial Qualification-
                                                          .s              @
On initial qualifichion, all members of the security force shall demonstrale performance of Litems 1 through 5 below within a one (1) hour time . limit. ' er?c : ::d tr :::t.g .,.                          I Kraci7;; :: :; ;-            meren ritec t!=- r:g;i;;d te t7 era;;;t ni e ae-e!,; reen:t          :t; tt; "r;t;;;;i Ar;;. "Or th::: it r : thi;h.                !
3"?t i: ;;rfer:d-:: cit: the!! act M een ite:d :: ;;,;t n' the e=e (t> h: r rastin::t 5 ::y:r, :: 5 tr:::;;;b;;?pec;;;;ir.;p C
                        =:h:11 S= c:Octsi 2 x;+j!H                    irmuroepe ,id    I
: 1. Climb up and down 35 foot ladder.
: 2. Climb up and down 40 feet of, stairway within three (3)                    J minutes,                                                                .
: 3. Run 440 yards in.t'wo (2) minutes                  .-    _.
PTNTQPz.
2- 7      .
                                                                                              'REVg-oc
        ..;..<..          . s , _ u
                            -            g. . s .. .. ._ . ,  ,_ _          ._
 
1 L
1 CHAPTER 4 - FIREAfg45                                      1
                                                                                                                    ^
!            4.1            ' TRAINING                      -
i l
Security force personne1' assigned in an amedLeapacity shall be i
trained and demonstrate proficiency in, the use of firearms (shown by.
duty position in Appendix A of this document) by achieving a passing._                                i score prescribed in the Conditions and StandardsEfor' qualification                                    4 involving live fire as defined in. Appendix 8 of this document.
Fireams qualification includes familiarization firin for' night and
              'j''Qdh'&w'#$i>>$fN'?i$          #
                                                                        $'e~y #              SAIf enia.                                                                ..
All firearms qualification courses described:in Appendix 8 of this document have been registered with, and approved by, the National Rifle Association. Approval letters are maintained and available for inspection.                    -
s.
                                                                    ..                                              )
                                                            *.                                                      \
4.2            QUALIFICATION /REQUALIFICATION-
                                                                                                                      )
Amed members of the security force will qualify with each 1
firearm required by duty position prior to assignment' to-such armed duty and every twelve (12) months,thereafter.:
l 4.3            SECURITY FORCE EQUIPMENT-1 Members      of the security' force arp provided                    equipment      in accordance with the provisions of the approved Turkey Point. Physical -
Security Plan.
* l
      ~-                                                                                              'PTNTQP' 4-1 '...                    F REVg oy1
                                                                                                              . . .}}

Latest revision as of 19:45, 31 May 2023