ENS 56252: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 22: | Line 22: | ||
The evaluation is expected to be completed by 01/27/2023. If there are questions, or addition information is required, please contact Chris Shaffer, Quality Assurance Manager, Flowserve Corporation, Ph: (434) 522-4136. | The evaluation is expected to be completed by 01/27/2023. If there are questions, or addition information is required, please contact Chris Shaffer, Quality Assurance Manager, Flowserve Corporation, Ph: (434) 522-4136. | ||
Known affected plant: Waterford 3 Nuclear Generating Station | Known affected plant: Waterford 3 Nuclear Generating Station | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20221205en.html#en56252 | ||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Revision as of 08:30, 5 December 2022
Where | |
---|---|
Flowserve Lynchburg, Virginia (NRC Region 2) | |
Organization: | Flowserve |
Reporting | |
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component | |
Time - Person (Reporting Time:+1376.75 h57.365 days <br />8.195 weeks <br />1.886 months <br />) | |
Opened: | Chris Shaffer 14:45 Dec 1, 2022 |
NRC Officer: | Ernest West |
Last Updated: | Dec 1, 2022 |
56252 - NRC Website | |