ENS 56196: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 21: | Line 21: | ||
This UPS had been supplied for use at Clinton Power Station. | This UPS had been supplied for use at Clinton Power Station. | ||
No other units are impacted by this defect or failure to comply. This issue has been identified as a single failure on this component only. This issue will not impact any future procurements. | No other units are impacted by this defect or failure to comply. This issue has been identified as a single failure on this component only. This issue will not impact any future procurements. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20221103en.html#en56196 | ||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Latest revision as of 06:30, 3 November 2022
Where | |
---|---|
Nutherm International, Inc. Mount Vernon, Illinois (NRC Region 3) | |
Organization: | Nutherm International, Inc. |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+34.55 h1.44 days <br />0.206 weeks <br />0.0473 months <br />) | |
Opened: | Thomas Sterbis 15:33 Nov 1, 2022 |
NRC Officer: | Donald Norwood |
Last Updated: | Nov 1, 2022 |
56196 - NRC Website | |