ML20100E993: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 2
| page count = 2
| project =  
| project = TAC:56390
| stage = Request
| stage = Request
}}
}}

Latest revision as of 05:14, 24 September 2022

Application for Amend to License NPF-3,revising Tech Specs to Allow Station to Begin Reactor Coolant Heatup & Conduct Zero Power Physics Testing Prior to Entering Mode 1 of New Fuel Cycle (Cycle 5).Fee Paid
ML20100E993
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/03/1984
From:
TOLEDO EDISON CO.
To:
Shared Package
ML20100E978 List:
References
TAC-56390, NUDOCS 8412060431
Download: ML20100E993 (2)


Text

. _- _ _

APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE NO. NPF-3 FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 Enclosed are. forty-three (43) copies of the requested change to the

' Davis-Besse Nuclear Power Station Unit No. 1 Facility Operating License No. NPF-3, together with the Safety Evaluation for the requested change.

The proposed change affects Section 1.6 of the Technical Specific-ations.

l 4

By /s/ R. P. Crouse Vice President, Nuclear

(

)' Sworn and subscribed before me this 3rd day of December, 1984.

l l

l i

1

( /s/ Laurie A. Hinkle, nee (Brudzinski)-

L Notary Public, State of Ohio l-My Commission Expires May 16, 1986 i

1 -. ,

r-l SEAL I

l I

8412060431 841203 DR ADOCK 05000346 PDR I

r

. . . . . _ . , . , - _ , , , , . . - , ......-._,..,--.,,_,...._,,.._.,.......~,,-_.-.-,_.,,,_,,_...--.,__,,..,,.,_.o ..

P

, Docket N3. 50-346 ,

~Lic;nna Nh. NPF-3' l Serial No. 1105 l

' Attachment A I. Changes to Davis-Besse Nuclear Power Station Unit 1 Appendix A Technical Specifications Section 1.6 (see attached markup).

A. ' Time required.to Implement. This change is to be effective upon_NRC approval.

B. Reason for Change (Facility Change Request 84-208).

This change would allow the station to begin reactor coolant-heatup and conduct zero power physics testing prior to entering Mode 1 of the new. fuel cycle (Cycle 5) utilizing the present configuration of the Startup Feedwater Pump and its associated pipelines and valves.

C. Event Evaluation (See Attachment D)

.D. Safety Evaluation (See Attachment E)

E. - Significant Hazards-Consideration (See Attachment F)

F. PRA-Based Justification for Operation of the SUFP System (See Attachment G).

_ . . _ _ _ - .