ML20129E539: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[BVY-96-129, Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.4]]
| number = ML20129E539
| issue date = 10/21/1996
| title = Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.4
| author name = Duffy J
| author affiliation = VERMONT YANKEE NUCLEAR POWER CORP.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000271
| license number =
| contact person =
| document report number = BVY-96-129, NUDOCS 9610280090
| package number = ML20129E542
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 1
}}
 
=Text=
{{#Wiki_filter:.      ..          _.          . - - .    . . .    .        _ _ . _ -.        . - - . .  ._    _          _ . _ . .        __ _      _
i  VERMONT YANKEE NUCLEAR POWER CORPORATION
      *    '              Ferry Road, Brattleboro, VT 05301-7002
(                                                                                                          HEPL.Y TO ENGINEERING OFFICE
,      ,                                                                                                  580 MAIN STREET BOLTON, MA 01740
(                  ,
l                                                                                                            (508)779-6711 i
October 21,1996 BVY 96 - 129 United States Nuclear Regulatory Commission                                                                                              1 ATTN: Document Control Desk Washington, DC 20555
 
==References:==
(a) License No. DPR-28 (Docket No. 50-271)                                                                                    l 1
 
==Subject:==
Vermont Yankee Cycle 19 Core Operating Limits Report                                                                      l l
In accordance with Section 6,7.A.4 of the Vermont Yankee Technical Specifications, enclosed is the Core Operating Limits Report (COLR) for Vermont Yankee Cycle 19, dated October 1996. This report presents the cycle-specific operating limits for the operation of Cycle 19 of the Vermont Yankee Nuclear Power Station.
Also enclosed for your convenience is a copy of the Core Performance Analysis Report (CPAR) for Vermont Yankee Cycle 19, YAEC 1935, dated October 1996. This repost presents design information, calculational results, and operating limits pertinent to the operation of Cycle 19 of the Vermont Yankee Nuclear Power Station.
Should you have any questions regarding the enclosed material, please contact this office.
Sincerely,                                                                        _m .
VERMONT YANKEE NUCLEAR POWER CORPORATION fftbd ames J. Duffy Licensing Engineer
                                                                                                                                          /
Enclosure
                                                                                                                                        /
c: USNRC RegionI Administrator USNRC ResidentInspector- VYNPS                                                                                              /
USNRC Project Manager- VYNPS 9610200090 961021                                                                                        /
                                                                                                                                  ,! ',(l l  '
PDR      ADOCK 05000271 P                        PDR l
l I}}

Latest revision as of 14:38, 21 August 2022