BVY-96-129, Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.4
| ML20129E539 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 10/21/1996 |
| From: | Duffy J VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20129E542 | List: |
| References | |
| BVY-96-129, NUDOCS 9610280090 | |
| Download: ML20129E539 (1) | |
Text
.
VERMONT YANKEE i
NUCLEAR POWER CORPORATION Ferry Road, Brattleboro, VT 05301-7002
(
HEPL.Y TO ENGINEERING OFFICE 580 MAIN STREET
(
BOLTON, MA 01740 l
(508)779-6711 i
October 21,1996 BVY 96 - 129 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
(a) License No. DPR-28 (Docket No. 50-271) l
Subject:
Vermont Yankee Cycle 19 Core Operating Limits Report l
l In accordance with Section 6,7.A.4 of the Vermont Yankee Technical Specifications, enclosed is the Core Operating Limits Report (COLR) for Vermont Yankee Cycle 19, dated October 1996. This report presents the cycle-specific operating limits for the operation of Cycle 19 of the Vermont Yankee Nuclear Power Station.
Also enclosed for your convenience is a copy of the Core Performance Analysis Report (CPAR) for Vermont Yankee Cycle 19, YAEC 1935, dated October 1996. This repost presents design information, calculational results, and operating limits pertinent to the operation of Cycle 19 of the Vermont Yankee Nuclear Power Station.
Should you have any questions regarding the enclosed material, please contact this office.
Sincerely,
_m.
VERMONT YANKEE NUCLEAR POWER CORPORATION fftbd ames J. Duffy Licensing Engineer
/
Enclosure
/
c: USNRC RegionI Administrator
/
USNRC ResidentInspector-VYNPS USNRC Project Manager-VYNPS
!,(l l 9610200090 961021
/
PDR ADOCK 05000271 P
PDR l
I