ML20147B738: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[ST-HL-AE-2520, Responds to 880120 Generic Ltr 88-02 Re Util Interest in Participating in Isap Ii.Util Does Not Have Interest in Participating in Program at Present Time.Response to Questionnaire Encl]]
| number = ML20147B738
| issue date = 02/19/1988
| title = Responds to 880120 Generic Ltr 88-02 Re Util Interest in Participating in Isap Ii.Util Does Not Have Interest in Participating in Program at Present Time.Response to Questionnaire Encl
| author name = Mcburnett M
| author affiliation = HOUSTON LIGHTING & POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000498, 05000499
| license number =
| contact person =
| document report number = GL-88-02, GL-88-2, ST-HL-AE-2520, NUDOCS 8803020179
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 4
}}
 
=Text=
{{#Wiki_filter:-
The Light company                                          *          "'I  "'
                                                                                "^8]001 ]713) 228 9211 Houston Lighting & Power                                                  .    ,
February 19, 1988 ST-HL-AE-2520 File No.:      G3.08 10CFR50 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Vashington, DC 20555 South Texas Project Electric Generating Station Unit 1 and 2 Docket No. SIN 50-498, STN 50-499 Response to Generic Letter 88-02, "Integrated Safety Assessment Program II (ISAP II)"
This letter is in response to the Generic Letter 88-02 dated January 20, 1988, regarding utility interest in participating in an Integrated Safety Assessment Program, ISAP II. The generic letter requested that the utility indicate a positive or negative interest in participating in ISAP II within 30 days of the date of that letter.
In response to your request, Houston Lighting & Power Company (HL&P) does not have an interest in participating in this program at the present time.
However, as has been previously indicated (ST-HL-AE-1606, dated May 8, 1986),
HL&P is in the process of completing a Level 1 Probabilistic Risk Assessment (FRA). A limited containment analysis, an external events analysis, and an uncertainty analysis are also being performed.                This PRA, which will be complete in early 1989, is expected to be maintained current as plant modifications are made, and we plan to use it to provide input to an Integrated Living Schedule Program.
Participation in the ISAP II program requires at a minimum the availability of a Level 1 PRA on the participating plant.                  As written, the referenced generic letter may be read to suggest that the participants in the ISAP II program will be required to maintain the Level 1 PRA current for the I
purpose of the continuing evaluation of plant changes.                  It is unclear how ISAP II relates to a utility's Integrated Living Schedule Program. Clarification of this relationship is necessary so that HL&P's furture involvement with this program may be given due consideration.
1 i          8803020179 880219 PDR    ADOCK 05000490 l          4P                    PDR l
yph)S>s ut.88.048.02            a sm a iai y a n eu n ina m m ics ince , pere <ca M
 
1 I
l liouston Lighting & Power Company ST-HL-AE-2520 File No.:  G3.08 10CFR50 Page 2 Please find attached our response to your questionnaire. If you have any questions on the matter, please contact me.
                                                        . A. McBur ett Manager Operacions Support Licensing        l MAM/PLW/km
 
==Attachment:==
Integrated Safety Assessment Program (ISAP) II Response Format to Generic Letter 88-02 b
NL 88.048.02
 
        ' flouston Lighting & l'ower Company ST-HL-AE-2520 File No.: G3.08 Page. 3 cc:
Regional Administrator, Region IV          Rufus S. Scott Nuclear Regulatory Commission              Associated General Counsel 611 Ryan Plaza Drive, Suite 1000          Houston Lighting & Power Company Arlington, TX 76011                        P. O. Box 1700 Houston, TX 77001 N. Prasad Kadambi, Project Manager U. S. Nuclear Regulatory Commission 1 White F3 int North 11555 Rockville Pike Rockville, MD 20859 Dan R. Carpenter Senior Resident Inspector / Operations c/o U. S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 Claude E. Johnson Senior Resident Inspector / Construction c/o U. S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 J. R. Newman, Esquire Newman & Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 R. John Miner (2 copies)
Chief Operating Officer City of Austin Electric Utility P. O. Box 1088 Austin, TX 78704 R. J. Costello/M. T. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Revised 02/03/88 NL.DIST.1&2
 
4 Integrated Safety Assessment Program (ISAP) II Response Format to Generic Letter 88-02 Facility Name:    South Texas Project Electric Generating Station Utility: Houston Lighting & Power Company Individual Contact Name      R. P. Murphy      Phone Number  (713)922-2630 An expression of interest will not be considered a commitment to participate
                                              ~
on the part of the utility.
: 1. Would you be interested in participating in ISAP II?      If so, in what time frame?
Houston Lighting & Power Company is not interested in participating in this program at this time.
: 2. Do you believe that an industry /NRC seminar consisting of a brief discussion by NRC followed by a question and answer period would be beneficial prior to making a decision?
Yes
: 3. Would you be interested in a one-on-one meeting with the NRC to discuss your particular facility or facilities?
Not at this time.
: 4. If you remain undecided regarding participation, what additional information do you need in order to make a decision?
See cover letter.
: 5. Do you have any potential concerns about participating in ISAP II?
See cover letter.
: 6. Do you have any suggestions for program improvements or changes?
Not at this time.
l l
l NL.88.048.02
                                                                                              --}}

Latest revision as of 06:12, 8 August 2022