PNO-II-97-006A, on 970129,plant Shutdown Due to Primary Pressure Boundary Leakage Update.Licensee Continuing to Cold Shutdown Conditions to Perform Addl Corrective Maint Activities.Resident Inspectors Monitoring Repair Actions: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[PNO-II-97-006, on 970129,Unit 1 Declared Notice of Unusual Event for Reactor Coolant Pressure Boundary Leakage,As Defined in TS 3.4.4.Resident Inspectors on Site Monitoring Licensee Actions.State of Ga Notified]]
| number = ML20134B631
| issue date = 01/30/1997
| title = PNO-II-97-006A:on 970129,plant Shutdown Due to Primary Pressure Boundary Leakage Update.Licensee Continuing to Cold Shutdown Conditions to Perform Addl Corrective Maint Activities.Resident Inspectors Monitoring Repair Actions
| author name = Carrion R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name =
| addressee affiliation =
| docket = 05000321
| license number =
| contact person =
| document report number = PNO-II-97-006A, PNO-II-97-6A, NUDOCS 9701300248
| document type = PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO,, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
{{#Wiki_filter:-      .  .  -- -.- . . . -      _ - . _ . . . - . -      ..- -        , .  -_            _ --
!  v January 30, 1997 PRELmm_Y NOTIFICATION OF avasu OR unuw=1 OCCUMmCE PNO-II 0 0 6A l Thic preliminary notification constitutes EARLY notice of events of POSSIBLE l  cofoty or public interest significance. The information is as initially l  rocsived without verification or evaluation, and is basically all that is known by Region II staff in Atlanta, Georgia on this date.
Facility                                                Licensee Emeraency Classification l Giorgia Power Co.                                            Notification of Unusual Event
! Hntch 1                                                      Alert l Bcxlcy, Georgia                                              Site Area Emergency l Docksts: 50-321                                              General Emergency X Not Applicable Subjsct:  PLANT SHUTDOWN DUE TO PRIMARY PRESSURE BOUNDARY LEAKAGE - UPDATE l
This is an update to the PN issued on January 29, 1997, which reported 1
j the plant shutdown due to primary system pressure boundary leakage. The                                  '
;  licensee has completed weld repairs to the three-quarter inch vent line cnd the line has been returned to service. The licensee terminated the Notification of Unusual Event at 7:25 a.m. on January 30.                   The licensee is continuing to cold shutdown conditions to perform additional corrsetive maintenance activities. They are scheduled to return to power operations approximately 12:00 noon on February 1, 1997.
The licensee reported that a local radio station expressed interest but tha licensee still does not plan to issue a press release.                                              1 The resident inspectors have been monitoring the licensee's repair actions and plant status control during the repair and root cause annlysis.                                                                                                '
Tha State of Georgia has been notified.
This information is current as of 1:00 p.m. on January 30, 1997.
 
==Contact:==
R. CARRION (404)331-0345 l
I 9701300248 970130 PDR  I&E PNO-II-97-006A PDR                                                                \    \\
D\
                                  . . -                                                  . - _ _ _}}
 