ML17024A021: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| document type = Letter, Report, Technical | | document type = Letter, Report, Technical | ||
| page count = 62 | | page count = 62 | ||
| revision = 0 | |||
}} | }} |
Revision as of 12:16, 25 February 2018
Letter Sequence Request | |
---|---|
CAC:L53136, (Open) | |
MONTHYEARML16181A0682016-06-27027 June 2016
[Table View]Boiling Water Reactor Request for Partial Site Release Project stage: Request ML16286A0502016-10-17017 October 2016 Summary of the September 20, 2016, Public Meeting with Dairyland Power Cooperative and La Crosse Solutions Regarding the License Termination Plan and Partial Site Release for the La Crosse Boiling Water Reactor Project stage: Request ML16286A0592016-10-17017 October 2016 LACBWR Ltp Mtg Slides 9-20-16 Project stage: Request ML16286A0562016-10-17017 October 2016 LACBWR Ltp and Site Release Public Meeting Slides Project stage: Request ML17024A0212017-01-23023 January 2017 Independent Confirmatory Survey Summary and Results for the Non-Impacted Land Areas at the La Crosse Boiling Water Reactor, Genoa, Wisconsin Project stage: Request ML16250A2002017-04-12012 April 2017 Boiling Water Reactor - Approval of Partial Site Release for Possession Only License No. DPR-45 (CAC L53136) Project stage: Other 2016-06-27 |
ML17024A021 | |
Person / Time | |
---|---|
Site: | La Crosse File:Dairyland Power Cooperative icon.png |
Issue date: | 01/23/2017 |
Revision: | 0 |
From: | Altic N A Oak Ridge Institute for Science & Education |
To: | Vaaler M Reactor Decommissioning Branch |
VAALER M, 415-3178, T08F05 | |
References | |
DCN 5299-SR-01-0, DE SC0014664 | |
Download: ML17024A021 (62) | |
Similar Documents at La Crosse | |
---|---|
Category:Letter
MONTHYEARML24249A3202024-09-0404 September 2024
[Table view]Quality Assurance Program Application to Transportation Activities Pursuant to 10 CFR 71.101(f) IR 07200046/20244012024-07-23023 July 2024 Independent Spent Fuel Storage Installation – NRC Security Inspection Report 07200046/2024401 IR 05000409/20240012024-07-17017 July 2024 NRC Inspection Report 05000409/2024001(DRSS); 07200046/2024001(DRSS) ML24193A1152024-07-0909 July 2024 Intent to Implement NAC-MPC CoC No. 1025, Amendment No. 7, Revision 1 ML24136A2432024-05-24024 May 2024 Independent Spent Fuel Storage Installation - Exemption from Select Requirements of Title 10 of the Code of Federal Regulations Part 73 ML24121A0732024-04-16016 April 2024 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML24058A1222024-02-27027 February 2024 Independent Spent Fuel Storage Installation (ISFSI) Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2023 ML24045A1612024-01-25025 January 2024 LACBWR ISFSI Submittal 10 CFR 50.59 and 10 CFR 72.48 Report of Changes, Tests, and Experiments ML24045A1592024-01-25025 January 2024 LACBWR ISFSI Submittal of Decommissioning Plan and Post Shutdown Decommissioning Activities Report ML24031A6432023-12-20020 December 2023 Independent Spent Fuel Storage Installation (ISFSI) - Nuclear Liability Insurance Coverage ML23341A0222023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23192A1082023-06-14014 June 2023 Possession-Only License DPR-45 - New Chief Nuclear Officer Selected ML23192A0612023-06-14014 June 2023 Possession-Only License DPR-45 - Formal Announcement of New ISFSI Manager ML23137A1552023-05-0202 May 2023 Possession-Only License DPR-45 - Financial Statement and Auditors' Report ML23130A1202023-05-0202 May 2023 Transmittal of Financial Statement and Auditors' Report ML23115A1712023-04-0404 April 2023 ISFSI - Nuclear Liability Insurance Coverage ML23115A1742023-04-0303 April 2023 Independent Spent Fuel Storage Installation, Adoption of Amendment 7 of NAC MPC Certificate of Compliance No. 72-1025 and Canister Registration ML23074A0552023-03-13013 March 2023 Decommissioning Funding Status Report for Shutdown Reactor ML23076A0402023-03-0606 March 2023 Notification of License Transfer Date from Lacrossesolutions, LLC to Dairyland Power Cooperative ML23060A0732023-02-27027 February 2023 Annual Radiological Environmental Operating Report ML23055A0282023-02-24024 February 2023 Completion of License Termination Activities and Release of Remaining Class 1 Survey Units from Possession Only License No. DPR-45 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23033A0682023-01-26026 January 2023 Proof of Financial Protection ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000409/20220012022-12-27027 December 2022 NRC Inspection Report No. 05000409/2022001(DRSS) ML22321A3132022-12-0808 December 2022 LACBWR License Transfer Order Fifth Extension Letter ML22335A0852022-11-23023 November 2022 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC, to Dairyland Power Cooperative ML22297A0042022-10-20020 October 2022 Response to October 14, 2022 Request for Additional Information for Class 1 Excavation and Basement Survey Units ML22285A0782022-10-13013 October 2022 NRC Analysis of Energy Solutions' Decommissioning Funding Status Report Docket No. 50-409 ML22278A0282022-10-12012 October 2022 Request for Confirmatory Information Letter Re to the Review of the Class 1 Survey Units ML22269A3902022-09-0707 September 2022 Response to July 5, 2022 Request for Additional Information for Class 1 Excavation and Basement Survey Units ML22230A8012022-08-16016 August 2022 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC, to Dairyland Power Cooperative ML22223A0712022-07-28028 July 2022 Response to June 5, 2022 Request for Additional Information for Class 1 Survey Areas ML22224A1172022-07-14014 July 2022 Possession-Only License DPR-45 Chief Nuclear Officer Selected ML22224A1372022-07-12012 July 2022 Quality Assurance Program Description (Oapd), Revision 31 ML22203A0932022-07-11011 July 2022 Changes to the La Crosse Boiling Water Reactor (LACBWR) ISFSI Physical Security Plan IR 07200046/20224012022-06-0101 June 2022 (Decommissioning) - Independent Spent Fuel Storage Installation Security Inspection Report 07200046/2022401 ML22146A2002022-05-24024 May 2022 Submittal of Quality Assurance Program Changes ML22122A2302022-05-24024 May 2022 Approval to Release Class 2 and Class 3 Survey Units from the Part 50 License ML22123A0822022-04-25025 April 2022 Possession-Only License DPR-45 - Financial Statement and Auditors' Report ML22068A2102022-04-20020 April 2022 Issuance of Amendment No. 77 Approving Independent Spent Fuel Storage Installation Emergency Plan, Revision 40 ML22108A0562022-03-28028 March 2022 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation ML22084A0092022-03-22022 March 2022 Annual Property Insurance Status Report ML22077A0132022-03-15015 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactor ML22069A1282022-03-0808 March 2022 Lacrossesolutions, LLC, La Crosse Boiling Water Reactor (LACBWR) Annual Radiological Environmental Operating Report, Supplemental Letter ML22062B0362022-02-28028 February 2022 Annual Radiological Environmental Operating Report ML22031A1162022-01-26026 January 2022 CFR 50.59 I 10 CFR 72.48 Report of Changes, Tests, and Experiments ML22033A1472022-01-26026 January 2022 Submittal of Decommissioning Plan and Post-Shutdown Decommissioning Activities Report, and License Termination Plan Changes IR 05000409/20210012022-01-0707 January 2022 NRC Inspection Report No. 05000409/2021-001 La Crosse Boiling Water Reactor ML22010A0862022-01-0505 January 2022 Proof of Financial Protection 2024-09-04 Category:Report MONTHYEARML24045A1612024-01-25025 January 2024
[Table view]LACBWR ISFSI Submittal 10 CFR 50.59 and 10 CFR 72.48 Report of Changes, Tests, and Experiments ML23055A0282023-02-24024 February 2023 Completion of License Termination Activities and Release of Remaining Class 1 Survey Units from Possession Only License No. DPR-45 ML23055A0292023-02-24024 February 2023 Staff Evaluation in Support of the La Crosse Class 1 Survey Unit Partial Site Release ML22269A3882022-09-0707 September 2022 02-Gamma Spectroscopy of Concrete Pucks ML22269A3912022-09-0707 September 2022 03-L1-SUB-CDR Release Record R.2 Final ML22269A3932022-09-0707 September 2022 05-LACBWR Gamma Spec Typo ML22223A0702022-07-28028 July 2022 Energysolutions, LLC, ES-LCR-CR-2017-0073, Survey Unit 010-101-C WTB Subfoundation ML22223A0712022-07-28028 July 2022 Response to June 5, 2022 Request for Additional Information for Class 1 Survey Areas ML22223A0722022-07-28028 July 2022 Lacrossesolutions, LLC, LC-RS-PN-164017-001, Rev. 0, LACBWR Site Restoration Project Work Control Procedure Isolation and Control for Final Status Survey ML22223A0732022-07-28028 July 2022 FSS Plan 101C, Waste Treatment Building Subsoil Excavation, FSS Unit L1-010-101C, Subsurface Soil ML22223A0742022-07-28028 July 2022 Lacrossesolutions, LLC, LC-FS-PR-008, Rev. 1, LACBWR Site Restoration Project Work Control Procedure Final Status Survey Data Assessment Data Assessment ML22223A0752022-07-28028 July 2022 Lacrossesolutions, LLC, LC-FS-PR-008, Rev 0, LACBWR Site Restoration Project Final Radiation Survey Data Assessment ML22223A0762022-07-28028 July 2022 Lacrossesolutions, LLC, Apex-Gamma, L1-010-101-FR-GS-CO1-SB, WTB Excavation ML22223A0772022-07-28028 July 2022 Lacrossesolutions, LLC, GG-EO-313196-RS-RP-001, Rev. 0, Characterization Survey Report for GG-EO-313196-RS-RP-001 La Crosse Boiling Water Reactor ML22223A0782022-07-28028 July 2022 Lacrossesolutions, LLC, Apex-Gamma, L1-010-101-FR-GS-CO3-SB WTB Excavation ML22223A0802022-07-28028 July 2022 Lacrossesolutions, LLC, LC-FS-PR-010, Rev. 1, LACBWR Site Restoration Project Work Control Procedure Isolation and Control for Final Status Survey ML22223A0812022-07-28028 July 2022 Lacrossesolutions, LLC, Apex-Gamma, L1-010-101-FR-GS-CO2-SB, WTB Excavation ML22223A0822022-07-28028 July 2022 Lacrossesolutions, LLC, LC-FS-PR-010, Rev. 2, LACBWR Site Restoration Project Work Control Procedure Isolation and Control for Final Status Survey ML22068A0902022-03-0909 March 2022 Draft License Termination Plan License Amendment Request - Zion Units 1 and 2 ML21189A2022021-03-0808 March 2021 Enclosure 1: Description and Evaluation of Changes ML20352A2372020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, Phase 2 Final Report Revision 1 ML20352A2382020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S2-011-101 a Release Record Revision 1, Final, Storm Drain 3 ML20352A2392020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, Phase 3 Final Report Revision 1 ML20352A2402020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B1-010-004 Release Record Revision 1, Waste Gas Tank Vault Basement ML20352A2412020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S2-011-103 a Release Record, Revision 1, Final, De-Icing Line ML20352A2422020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S2-011-103 Release Record, Revision 1, Final, Circulating Water Intake Pipe ML20352A2432020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S3-012-102 B Release Record, Revision 1, Final, Storm Drain 5 ML20352A2442020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B2-010-101 Release Record Revision 1, LACBWR Crib House ML20352A2452020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S2-011-101 B Release Record Revision 1, Final, Storm Drain 6 ML20352A2462020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S1-011-102 Release Record Revision 1, Final, Circulating Water Discharge Pipe ML20352A2472020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S3-012-109 B Release Record, Revision 1, Final, Storm Drain 2 ML20352A2492020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-103 Release Record Revision 1, Genoa 1 Crib House ML20352A2502020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-101 Release Record, Rev. 1, Reactor Building, WTB, Wgtv, Ventilation Stack Grounds ML20352A2512020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-SUB-TDS a Release Record, Rev. 1, Eastern Portion TB, Sump, Pit, Diesel ML20352A2522020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B2-010-102 Release Record Revision 1, Genoa 3 Crib House ML20352A2532020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B2-010-103 Release Record Revision 1, Administration Building ML20352A2542020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-109 Release Record, Revision 1, Security Station ML20352A2552020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-SUB-TDS Release Record, Rev. 1, L1-010-102 Excavation ML20352A2572020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-105 Release Record, Rev. 1, North Interim Debris Storage Area ML20352A2582020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L2-011-104 Release Record, Rev. 1, G3 Crib House, Circ. Water Discharge Land ML20352A2592020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, LACBWR IC Dose Calculations ML20352A2612020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-104 Release Record, Revision 1, Barge Wash Break Room ML20352A2622020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L2-011-101 Release Record, Rev. 1, Area North of Lse Fence ML20352A2632020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-107 Release Record, Rev. 1, Outside East Lse Area ML20352A2642020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-102 Release Record, Revision 1, Transmission Sub-Station Switch House ML20352A2652020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-104 Release Record, Rev. 1, North Lse Grounds ML20352A2662020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-101 C Release Record, Rev. 1, Waste Treatment Building Excavation ML20352A2672020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-101 Release Record, Revision 1, Back-Up Control Center ML20352A2682020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-SUB-CDR Release Record, Rev. 1, Stack, Pipe Tunnel, RPGPA Excavation ML20352A2692020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, LC-FS-TSD-005, Revision 0, MCNP Modeling of Water Discharge Pipes for the Lacrosse Boiling Water Reactor 2024-01-25 Category:Technical MONTHYEARML23055A0282023-02-24024 February 2023
[Table view]Completion of License Termination Activities and Release of Remaining Class 1 Survey Units from Possession Only License No. DPR-45 ML22269A3932022-09-0707 September 2022 05-LACBWR Gamma Spec Typo ML22269A3912022-09-0707 September 2022 03-L1-SUB-CDR Release Record R.2 Final ML22269A3882022-09-0707 September 2022 02-Gamma Spectroscopy of Concrete Pucks ML22223A0822022-07-28028 July 2022 Lacrossesolutions, LLC, LC-FS-PR-010, Rev. 2, LACBWR Site Restoration Project Work Control Procedure Isolation and Control for Final Status Survey ML22223A0812022-07-28028 July 2022 Lacrossesolutions, LLC, Apex-Gamma, L1-010-101-FR-GS-CO2-SB, WTB Excavation ML22223A0802022-07-28028 July 2022 Lacrossesolutions, LLC, LC-FS-PR-010, Rev. 1, LACBWR Site Restoration Project Work Control Procedure Isolation and Control for Final Status Survey ML22223A0782022-07-28028 July 2022 Lacrossesolutions, LLC, Apex-Gamma, L1-010-101-FR-GS-CO3-SB WTB Excavation ML22223A0772022-07-28028 July 2022 Lacrossesolutions, LLC, GG-EO-313196-RS-RP-001, Rev. 0, Characterization Survey Report for GG-EO-313196-RS-RP-001 La Crosse Boiling Water Reactor ML22223A0762022-07-28028 July 2022 Lacrossesolutions, LLC, Apex-Gamma, L1-010-101-FR-GS-CO1-SB, WTB Excavation ML22223A0752022-07-28028 July 2022 Lacrossesolutions, LLC, LC-FS-PR-008, Rev 0, LACBWR Site Restoration Project Final Radiation Survey Data Assessment ML22223A0742022-07-28028 July 2022 Lacrossesolutions, LLC, LC-FS-PR-008, Rev. 1, LACBWR Site Restoration Project Work Control Procedure Final Status Survey Data Assessment Data Assessment ML22223A0732022-07-28028 July 2022 FSS Plan 101C, Waste Treatment Building Subsoil Excavation, FSS Unit L1-010-101C, Subsurface Soil ML22223A0722022-07-28028 July 2022 Lacrossesolutions, LLC, LC-RS-PN-164017-001, Rev. 0, LACBWR Site Restoration Project Work Control Procedure Isolation and Control for Final Status Survey ML22223A0712022-07-28028 July 2022 Response to June 5, 2022 Request for Additional Information for Class 1 Survey Areas ML22068A0902022-03-0909 March 2022 Draft License Termination Plan License Amendment Request - Zion Units 1 and 2 ML21189A2022021-03-0808 March 2021 Enclosure 1: Description and Evaluation of Changes ML20352A2722020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, LC-FS-TSD-003, Assessment of the LACBWR Circulating Water Discharge Pipe Final Status Survey Data for Detection Efficiency and ML20352A2702020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, LC-FS-PR-018, Revision 2, Radiation Surveys of Pipe Interiors Using Sodium/Cesium Iodide Detectors ML20352A2692020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, LC-FS-TSD-005, Revision 0, MCNP Modeling of Water Discharge Pipes for the Lacrosse Boiling Water Reactor ML20352A2682020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-SUB-CDR Release Record, Rev. 1, Stack, Pipe Tunnel, RPGPA Excavation ML20352A2672020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-101 Release Record, Revision 1, Back-Up Control Center ML20352A2662020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-101 C Release Record, Rev. 1, Waste Treatment Building Excavation ML20352A2652020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-104 Release Record, Rev. 1, North Lse Grounds ML20352A2642020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-102 Release Record, Revision 1, Transmission Sub-Station Switch House ML20352A2632020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-107 Release Record, Rev. 1, Outside East Lse Area ML20352A2622020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L2-011-101 Release Record, Rev. 1, Area North of Lse Fence ML20352A2612020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-104 Release Record, Revision 1, Barge Wash Break Room ML20352A2592020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, LACBWR IC Dose Calculations ML20352A2582020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L2-011-104 Release Record, Rev. 1, G3 Crib House, Circ. Water Discharge Land ML20352A2572020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-105 Release Record, Rev. 1, North Interim Debris Storage Area ML20352A2552020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-SUB-TDS Release Record, Rev. 1, L1-010-102 Excavation ML20352A2542020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-109 Release Record, Revision 1, Security Station ML20352A2532020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B2-010-103 Release Record Revision 1, Administration Building ML20352A2522020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B2-010-102 Release Record Revision 1, Genoa 3 Crib House ML20352A2512020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-SUB-TDS a Release Record, Rev. 1, Eastern Portion TB, Sump, Pit, Diesel ML20352A2502020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-101 Release Record, Rev. 1, Reactor Building, WTB, Wgtv, Ventilation Stack Grounds ML20352A2492020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-103 Release Record Revision 1, Genoa 1 Crib House ML20352A2472020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S3-012-109 B Release Record, Revision 1, Final, Storm Drain 2 ML20352A2462020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S1-011-102 Release Record Revision 1, Final, Circulating Water Discharge Pipe ML20352A2452020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S2-011-101 B Release Record Revision 1, Final, Storm Drain 6 ML20352A2442020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B2-010-101 Release Record Revision 1, LACBWR Crib House ML20352A2432020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S3-012-102 B Release Record, Revision 1, Final, Storm Drain 5 ML20352A2422020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S2-011-103 Release Record, Revision 1, Final, Circulating Water Intake Pipe ML20352A2412020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S2-011-103 a Release Record, Revision 1, Final, De-Icing Line ML20352A2402020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B1-010-004 Release Record Revision 1, Waste Gas Tank Vault Basement ML20352A2392020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, Phase 3 Final Report Revision 1 ML20352A2382020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S2-011-101 a Release Record Revision 1, Final, Storm Drain 3 ML20352A2372020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, Phase 2 Final Report Revision 1 ML20352A2362020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B1-010-001 Release Record Revision 1, Reactor Building Basement 2023-02-24 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17024A021&oldid=337941"