ML20154E197: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[PLA-3027, Monthly Operating Repts for Apr 1988]]
| number = ML20154E197
| issue date = 04/30/1988
| title = Monthly Operating Repts for Apr 1988
| author name = Hirt J, Keiser H
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = Mcdonald W
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000387, 05000388
| license number =
| contact person =
| document report number = PLA-3027, NUDOCS 8805200124
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 9
}}
 
=Text=
{{#Wiki_filter:-
4 m;' r g
                                  -p AVERAGE DAILY UNIT POWER LEVEL p      '
SiOl              y (0          -...-              3                                                          DOCKET NO.      50-387 L;s              . " r'. J
                                  .                                                                                One fp                        O                                                                  D E      05/09/88 CONIPLETED BY J.A. Hirt NJC $W                                                                                                        ~
TELEPHONE MONTH          April, 1988              _ _ _
DAY      AVERAGE DAILY POWER LEVEL                            DAY        AVER AGE DAILY POWER LEVEL DlWe Net)                                                  (MWe-Net )
1,052                                    ,7 1,052 2                    1.050                                    18                  1,053 3                      1,048                                    ig                  1,056 4                      1,046                                  20 1,055 1,050                                                        1,054 5                                                              21 1,051                                  yy 1,054 6
1,056                                                        1,052 7                                                              ,
8                    1,057                                  24 1,050 9                      1,058                                                        1,052 23 1,055                                                        1,049 to                                                              26 11                      1.054                                  :;                  1,047
::                      1,055                                    g                  1,053 g3                      1,055                                  ,,
1,054 14                      1,055                                  30                      803 15 1,055                                  3, 1,056 16 INSTRUCTIONS On this format. list the aserage daily unit power lesel in \lwe Net for each das in the reportin; month Compu'e to the nearest whole megawatt.
01/77) l~
8805200124 DR 88043o                                                                                          I ADOCK 05000387                                                                                                f DCD
  ~
 
N
                - G<co*?,s e          D g          '-*W Z          7. . . 1            3 L7                    . r, J                OPERATING DATA REPORT O                                                          DOCKET NO, .50-387 bp                    -                                                                      DATE _05/09/80 RfC cgTP'D                                                                COMP!ITED BY        J. A. Hirt TELEPHONE (717)542- 3917 OPERATING STATUS                                                                ' - - ' " -
Unit One Notss
: 1. Unit Name: .Syp3;ehanna Steam Electric Station
: 2. Reporting Period:
April, 1988 3,293
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):
1,152
: 5. Design Electrical Rating (Net MWe):
1,065 1,068
: 6. Masimum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):
I' #
: 8. If Change Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Gise Reasons:
None
: 9. Power Lesel To Which Restricted.lf Any (Net MWe):
D
: 10. Reasons For Restrictions. lf Any:        N/A This Month            Yr..to Date          Cumulatise 719                    2,903
: 11. Hours in Reporting Period 719 2,628            42,936_I 32,280.
: 12. Number Of Hours Reactor Was Critical
: 13. Reactor Resene Shutdown Hour,                                0                          0                812.7 719                    2,584.4            30,531.4
: 14. Hours Generator On-Line 0                          0                    0
: 15. Unit Resene Shutdown Hours 2,356,635              8,254,661              94,308,138
: 16. Gross Therrnal Energy Generated (MWH) 17 Gross Electrical Energy Generated (MWH) 776,720              2,726,112              30,736,711 _
751,003              2,630,162              29,471,390
: 18. Net Electrical Energy Generated (MbH) 100.0                      39.0                71.1
: 19. Unit Senice Factor
: 20. Unit Asailability Factor                                  100.0      _
89.0                71.1 101,2              _ 87.8                      66.5
: 21. Unit Capacity Factor (Using MDC Nett 98.1                    85.1                  64.5
: 22. Unit Capacity Factor (Using DER Net) 0.0                        5.5                10.4
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Oser Nest 6 Months iType. Date,and Duration of Eachi:
Unit One is not currently scheth.21ed to shutdown within the next six nonths.
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:      NA
: 26. Units in Test Status (Prior to Commercial Operation r                      Forecast              Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION t o li' )
 
          $pANN4 g      #                                                                                                                                -
r :
g
              +
p:g.}\ >                                                                                                                                            .
R P                    f                                                                                                      50-387                  .-
          '#'    '      fIIDL                                UNIT Sl1UIDOWNS AND POWER REDUCI10NS                  DOCKET NO.                                        ,
        ,Y                                                                                                          UNIT NAME SSES- Unit One DATE 05/09/88 k @6 @[
Ikic REPORT MONT11 April, 1988                  COMPLETED BY TELEPHONE
                                                                                                                                      .T A _ Hi rt-(717)S42-3917 w.
_    E                            c
                                -,        $g        3j    j $5        Licensee    h          E S%
Cause & Corrective N. ..            Date          g        3g              jg5          E4nt      u?                                  Action to
                                          $3        5    3 ;f3 :
e    !
Repost
* EV u
                                                                                              !'3                Present Recurrence 6
4        880430              S          0        B        5        NA        JD      zzzzzz    Ch 7pril 30, 1988, at approxuetely 0600 hours, Operations perra nel began decreasing reactor power to perform a control rod secuence exchange and to scram time 19 oontrol rods. Follcving cmpletion of these activities, operatims perscnnel increased reactor power. Full power operation was restored on Kr/ 1, 1988 at approxinntely 1900 hours.
I                            2                                                  3                              4 f: Forted                    Reawn:                                            Method.                          Exhibit G -Instructims S Scheduled                  A-Equipment Failure (Explain)                      1 -Manual                        for Preparation of Data B-Maintenance or Test                              2-Manual Scram.                  Entry Sheets for lxensee C-Refucimg                                        3 Automatic Scram.              Esent Report (LER) File (NUREG-D-Regulatory Restriction                          4-Continuation                  0161) 14)perator Training & 1xense I namination            from previous month F-Adnunist rative                                                              5 G-Operational I rror (I splam)                    5-Reduction                      Exhibit I - Same Serce (9/77)                          Il4)t her (E xplam)                                9-Other
 
SUSQUEIU\NNA STFRt EIECTRIC STATION Docket Ntaber 50-387    Ente 05/09/88 Orpleted by    J.A. Ilirt    'Iblephone (717)542-3917 l
l l
Onllenges to Main Steam Safety Iblief Valms Nano Own,*s to the Offsite Dose Calculatico Funual l                  Ncne bhjor dunges to Padioactive Waste Treatment Systems Ibne
* 4gANN4                            AVER AGE D ALLY UNIT POWE R LEVEL p ~ Wi.f      .,.
50-388 (4            .... .
2
                                        $                                                      DOCKET No.
hO
                              ~
nJ                                                                    UNIT O                                                                            05/09/88 Y                                                                                              DATE CO%IPLETED BY          J.A. Ilirt (RIC c5Tb TELLP110NE      (717)542-3917 MONTil        April, 1988 DAY        AVERAGE DAILY POWER LEVEL                          DAY      AVERAGE DAILY POWER LEVEL t MWe-Net)                                                otwe. Net)
I                                                          17 2                        0                                  18                      0 3                        0                                  i9                      0 0                                  ,o                      0 4
0                                                          0 5                                                            33                                        __
6                        0                                  22                      0 7                        0                                  23 0
0                                  ,4 0
8 0
9                                                            25 10                        0                                  23                      0 0                                  ,,                      0 ll 0                                                          0 12                                                            ,3 13      __
0                                  29                      0 0                                  30                      0 14 15 0                                  3i 16                        0 INSTRUCTIONS On this format.hst the aserage daily umt power lesel m stWe. Net for each day in the reporting month. Compute f o the nearest whole mepwatt.
oI77)
 
gANN4 D
W s      4'N %73
                    ~....
L.                    . r *, ;              OPERATING DATA REPORT Q                                                      DOCKET No. 50-388 DATE 05/09/8s h NIC $@6                                                                      COMPLETED BY 7 L Hi rt TELEPHONE f717)542-3917 OPERATING STATUS Unit 'Iko SusyJunna Steam Electric Station                      Notes
: 1. Unit Name:
April, 1988
: 2. Reporting Period:
3,293
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):
1,154 1,065
: 5. Design Electrical Pating (Net MWe):
1,068
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Masimum Dependable Capacity (Net MWel:
I'#
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasoits:
Ncne
: 9. Powe'r Lesel To which Restricted,if Any (Net MWe):      he
: 10. Reasons For Restrictions.lf Any:        N/A This Month          Yr..to.Date          Cumulatise 719                  2,9n3                28,175
: 11. Hours in Reporting Period 0                  1.560                23.152
: 12. Number Of Hours Reactor was Critical 0                        0                  717.9
: 13. Reactor Resene Shutdown Hours                                                                      22,697.4 0                  1,536.5
: 14. Houn Generator On-Line 0                        0                      0
: 15. Unit Resene Shutdown Hours
: 16. Gross Thermal Energy Generated (MWH)                      0            4,798,980              71,424,693 0            1,572,662              23,379,424
: 17. Gross Electrical Energy Generated (MWH)
                                                              -6,209              1,511,085              22,509,360
: 18. Net Electrical Energy Generated (MhH) 0                      52.9                    80.6
: 19. Unit Senice Factor 0                      52.9                    80.6
: 20. Unit Asailability Factor 0                      50.5 _                77.4
: 21. Unit Capacity Factor (Using MDC Net)                                                                      75.0 0                      48.9      _
: 22. Unit Capacity Factor (Using DER Net) 0                        0                      0.7
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Oser Nest 6 Months tty pe. Date.and Duration of Eacht:
thit Two is currently shutdown for its second refueling outape.
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:    bby 21, 1988
: 26. Units in Test Status (Prior to Commercial operation):                      Forecast              Achiesed INITI AL CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION to!77 :
 
gANPv4
                      %f
* j  l j'[ }f 'l'7
          #                                                                                                  DOCKET NO.        50-388                  ,
1                              UN:T SitUIDOWNS AND POWER REDUCTIONS g,
                "        h                                                                                    UNIT N AME 'l%D Y.
g              0                                                                                            DATE n; /ns)/RR
          - 7.%IC 6g3 6                                      REPORT MON 111 April, 1988                  COMPLETED BY __J. A. liirt TELEPHONE          (717)542-3317
                          -,        5E        g      Ek        Ekensee    [-r,                          Cause & Currective No.          Daic          g        3g        (    }g5          Event      E?        k%                      Action to c3 E      5    e
                                                      ~~ ;g c Repint #    EU        h'l O
Pievent Recurrente 6
1          880305        S        719        C      1            NA      zzzz      zzzzzz    Q1 Mardi 5,1988, at 0200 hours, Operations personnel placal the reactor mode switch in the "shutdown" position to cxrrrnce the Unit's second refueling outage.
I                        2                                                3                              4 F Fosted                Reasim:                                          Method:                        Exlubit G - Instructi.ms S. Stheduled            A-l~qmpment Failure (Explam)                      I-Manual                        for Pseparation of Data B-Maintenance or Test                            2-Man ual Scram.                Entey Sheets for Licensee C-Refueling                                      3-Autonutic Scram.              Event Repixt (LI R) Fde (NURI G-D-Regulatory Restiksi.m                          4 Continuation                0161)
I f)perator Trammg a IAcusc i namination            from previous month F- Adnu mst ratise                                                            5 GI)peratumal I snos il aplaml                    5-Reduction                    I mhibis 1 - Sanw Source es/77)                      II 0:her (E splam,                                9-Other
 
SUSQUDIIMIA SEV1 EIECTRIC STATIQ4 Docket IAurber 50-388 Date 05/09/88 Ompleted trf J. A. Ilirt    'Iblephone (717)S42-3917 dullenges to Fhin Steam Safety Felief Valms None 01anges to the Offsite Ibse Calculation Manual tbne bhjor Qianges to Padioactive Waste Treatrent Systans ibne
 
.y3 e
((fL3        Pennsylvania Power & Light Company Two North Ninth Street e Allentown, PA 18101 1179 e 215/770-5151 Submitted pursuant to Technical Specifications Harold W. Keiser                                                                Section 6.9.1.6 Senior Vice President Nuclear 215/770-4194 MAY I 31988 Mr. William G. Mcdonald Director, Office of Administration and Resources Management U.S. Nuclear Regulatory Commission Washington, D.C.          20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS                                                  Docket Nos. 50-387/NPF-14 PLA-3027                      FILE R41-2A                                                  50-388/NPF-22
 
==Dear Mr. Mcdonald:==
 
The April 1988 conthly operating reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, y        -
1,        2 3
H. W. Keiser Attachment ec: Document Control Desk (Original)
NRC Region I Mr. F. I. Young - NRC Sr. Resident Inspector Mr. M. C. Thadani - NRC Project Manager I
1}}

Latest revision as of 09:20, 10 December 2021