ML20199A896: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20199A896 | | number = ML20199A896 | ||
| issue date = 06/04/1986 | | issue date = 06/04/1986 | ||
| title = Ack Receipt of | | title = Ack Receipt of Re Scope & Objectives for Plant Emergency Preparedness Exercise Scheduled for 860730.Scope & Objectives Acceptable.Two Objectives Re Access Control & Interface W/State & Local Authorities Resolved | ||
| author name = Shafer W | | author name = Shafer W | ||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8606160244 | | document report number = NUDOCS 8606160244 | ||
| title reference date = 05-14-1986 | |||
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | ||
| page count = 1 | | page count = 1 | ||
Revision as of 06:10, 8 December 2021
| ML20199A896 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/04/1986 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| References | |
| NUDOCS 8606160244 | |
| Download: ML20199A896 (1) | |
Text
- --
JUN 0 41986 I
Docket No. 50-483 Union Electric Corrpany l ATTN: Mr. Donald F. Schnell Vice President - Nuclear Post Office Box 149 - Mail Code 400 St. Louis, MO 63166 Gentlemen:
Thank you for your letter of May 14, 1986, which included a copy of Union Electric Company's scope and objectives for the Callaway Plant emergency preparedness exercise scheduled for July 30, 1986. We have reviewed the scope and objectives outlined in your letter and noted that objectives regarding access control and interface with State and local authorities were not explicitly stated. However, in a telephone discussion with your staff on May 23, 1986, Mr. Richard Grundstrom agreed that the above two objectives will be a part of your exercise and they are already covered implicitly by some of the procedures which are referenced.
Accordingly, the scope and objectives are acceptable.
If you have any questions, please contact Mr. Norman Williamsen of my staff at (312) 790-5538.
Your cooperation with us is appreciated.
Sincerely, W. D. hafer, Chief b
Emergency Preparedness and Radiological Protection Branch cc: A. P. Neuhalfen, Manager Quality Assurance S. E. Miltenberger, Plant Manager DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII n Region IV
,g Resident Inspector, Wolf Creek oon K. Drey
$8 Chris R. Rogers, P.E.
jg Utility Division, Missouri y Public Service Commission M SNUPPS /$g pg c<
M. Collins, FEMA, RVII d0/
5 cc w/1tr dtd 05/14/86: JIg g D. Matthews, EPB, OIE i mat RII R R I R 7dV orney Wi liap'sen/jp ell r p' cf ,
J