ML20207S239: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[PLA-2810, Monthly Operating Repts for Feb 1987]]
| number = ML20207S239
| issue date = 02/28/1987
| title = Monthly Operating Repts for Feb 1987
| author name = Keiser H, Ryder T
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = Beebe M
| addressee affiliation = NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
| docket = 05000387, 05000388
| license number =
| contact person =
| document report number = PLA-2810, NUDOCS 8703190177
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 9
}}
 
=Text=
{{#Wiki_filter:a  .
pANN    o 4
EA            AVERAGE DAILY UNIT POWER LEVEL
          .D                  j        7 m            -...              E                                                        DOCKET NO. 50-387 t-                Tm 4                                                                    UNIT One O                                                                                  DATE    03/05/87
(+Op                                                                            COMPLETED BY T.S. Ryder (717)S42-3235 TELEPHONE MONng          Febnnry,1987 DAY      AVERAGE DAILY POWER LEVEL                                DAY    AVERAGE DAILY POWER LEVEL (MWe Net)                                                (MWe-Net)
I                1nal                                            17            1042-1040                                                          1042 2                                                                ,,
3                  1042                                                          1041 19 4                1043                                            20            1036 5                1043                                                          inn 21 6                  918                                                          1040 22 545                                                          1043 7                                                                  23 548 s                                                                  24            1043 537 9                                                                25            1044 to                  540                                                          1043 26 11 807                                                          1044 27 773                                                          1045 12                                                                28 13 1039 29 14                1044 30 15 1042 38 1042 16 l
INSTRUCDONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
r                                                                                                                                          19/77 )
p                                I 8703190177 870228                                                                                                                l\
ADOCK 05000387 l
i hDR                    PDR
 
SANN        4
_:..        3 u      VMe h r ~ &
Q)          ' -M            ?
M          ......            3 LN            " ;F's J                    OPERATING DATA REPORT e                    0                                                            DoCxET No. 50-387 DATE 03/05/u/
OpNIC    -- S i [s                                                            COMPLETED BY _T.S. Ryder TEllPHONE        (717) 54Z-3235 OPERATING STATUS Unit One Susquehanna Sterrn Electric Station                  Notes
: 1. Unit Name:
: 2. Reporting Period:    February 1987
: 3. Licensed Thermal Power (MWt):
3293
: 4. Nameplate Rating (Gross MWe):      1152
: 5. Design Electrical Rating (Net MWe):
10 %
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):          1032
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Nom
: 9. Power Level To Which Restricted,if Any (Net MWe):            Nom
: 10. Reasons For Restrictions,If Any: N/A This Month            Yr..to.Dat e          Cumulative i1. Hours In Reporting Period                              672                  1,416                32,689
: 12. Number Of Hours Reactor Was Critical                    672                1,416                23,603.5
: 13. Reactor Reserve Shutdown Hours                          0                      0                    812.7
: 14. Hours Generator On-Line                                672                  1,416                23,030
: 15. Unit Reserve Shutdown Hours                              0                      0                      0
: 16. Gross Thermal Energy Generated (MWH)                2,029,678            4,466,452              70,749,590
: 17. Gross Electrical Energy Generated (MWH) 661,788            1,463,284              23,050,822
: 18. Net Electrical Energy Generated (MWH) 63 / , m          1,409,242              22,084,271
: 19. Unit Service Factor                                      100.0              100.0                    70.5
: 20. Unit Availability Factor                                100.0              100.0                    70.5
: 21. Unit Capacity Factor (Using MDC Net)                      91.9                96.4                    65.5
: 22. Unit Capacity Factor (Using DER Net)                      89.0                93.5                    63.4
: 23. Unit Forced Outage Rate                                    0.0                0.0      ,,_
10.6
: 24. Shutdowns Scheduled Oser Next 6 Months (Type Date,and Duration of Each):
No shutdowns are scintuled
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:        NM
: 26. Units in Test Status (Prior to Commercial Operation):                        Forecast              Achwsed INITIA L CRITICALITY INITIAL ELECTRICITY CO\l%IERCIAL OPER ATION to/77i
 
[        4, 3,
              ' 'f$)], [g.
x -.
v                                                                                                                    -
LN          S                              UNIT SHUTDOWM AND POWER ltEDUC110NS                  DOCKET NO.        50-387 g        R                                                                                  UNIT NAME SSES - Unit Ore f.g            p                                                                                            DATE 03/05/87 4fC 5#                                        REPORT MON 111 Felruary, 1987                COMP
                                                                                                                                      )  3235 TE          E n.
* E                            c 5        "E    -_*I5        Licensee    E-t      E*,,                Cause & Corrective
  %.                                jE              3s&
Date H
f:
k 5    jgg Event Report a
{$
mV        h g
V Action to Prevent Recurrence 6
1            870206      S        O        B        5            N/A    G      ZZZZZZ      Power redu d to approx. 55% to perform a rod sequence exchange and to make Reactor Water Cleanup Systen punp and valve repairs.
I                        2                                                  3                            4 F: Forced                Reason:                                          Method:
S: Scheduled                                                                                                Exhibit G - Instructions A Equipment Failure (Explain)                    1-Manual                        for Preparation of Data B Maintenance of Test                            2-Manual Scram.                Entry Sheets for Licensee C-Refueling                                        3-Automatic Scram.              Event Report (LER) File INUREG-D-Regulatory Restriction                          4 Continuation                  0161)
E-Operator Training & License Examination          from previous month F-Administrative                                                              5 G-Operational Error IExplain)                    5-Reduction Exhibit I- Same Source N/77)                      IIOther (Explain)                                9-Other
 
I StBQUEHN@iA STEAM ELECTRIC STAPION Docket Number 50-387  Date 03/05/87 Canpleted by T.S. Ryder      Telephone (717) 542-3235 6
Challenges to Main Steam Safety Relief Valves None
          , Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None
 
[                                  AVERAGE DAILY UNIT POWER LET EL
                                    @                                                                                                            i Q              v                Y                                                                                      -                    l
(#1.          ....              5                                                              DOCKET NO.      50-38P Le.                "h                                                                                      M UNIT (9                          s0                                                                    DAir      03/05/87 T. S. ' R/ der IRIC cf                                                                      COMPLETED BY TELEPHONE (717) 542-3235 gg                  Febntary 1987                                                                                              ,
DAY      AVERAGE DAILY POWER LEVEL                            DAY      AVERAGE DAILY POWER I.EVEL (MWe-Net)                                                    (MWe-Net t 992                                                                1055 i                                                            7 1053 2                                                            18 1056 3                    1054                                                                1056 19 4                    1054                                                                1056 20 1055                                                                105E 5                                                            21 6                      674                                    yy                          1053 993 7                                                            23                          1056              _
10 %                                                                1056 8                                                            24 OM                                                                1056 9                                                            25 10                    1056                                  26                          1055                                      ,
il                    1057                                  27 1055 12                    1057                                  ,3                          1055 1050                                                                                '''-
13                                                            29                                  __      _
14 1057 15                      1059                                  33 16                      1056 INSTRUC110NS On this format, list the average daily unit power levelin MWe. Net for each day in the reporting moneh. Compute to the nearest whole rnegawatt.
(9/77)
I
 
          /
FANN r- n
                                                .      e
                                    -            r-    .,g hZ                          _
f*7 t "t-    .U - - I..5. J i
OPERATING DATA REPORT DOCKET NO. 50-388 DATE _ nl/ns/R7 hkiC g@M                                                                          COMPLETED BY _ T.S. Ryder TE11 PHONE    t/1/) x z-3235 OPERATING STAT US Unit 'IWo I. Unit Name:            Susepehan g Steam Electric Station            Notes
: 2. Reporting Period:            i:'ebruar/ 1987 3293
: 3. Licensed ThermalPower(MWtt:
: 4. Nameplate Rating (Gross MWe):                1152
: 5. Design Electrical Rating (Net MWe):          1065
: 6. IAaximum wpendable Capacity (Gross MWe):          1068 i                    7. M sximum Dependable Capacity (Net MWe):          1032
: 8. l(Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None
: 9. Power Level To Which Restricted,If Any (Net MWe):              Ne
: 10. Reaso.es For Restrictions,if Any:                                N/A This Month            Yr..to.Date          Cumulative i1. Houd in Reporting Period                                  672                  1,416                17,928
: 12. Nu'nber Of Hours Reactor Wo. Critical                    672                  1,353                14,461 0                      0                    717.9
: 13. Reactor Reserve Einutdown Hours 14, ilours Generator Gn-Lia                                  672                  1,317.3              14,046.6
: 15. Unit Resene S7.:.tdown Hours                              0                      0                    0
: 16. Gross Therrral Energy Generated (MWH)              2,178,393                  4,194,397          _43,587,282
: 37. Greu l>:e 91 cal Energy Generated (MWH)              720,962                  1,385,468            T47289,762 1h Net Eleewal Energy Generated [MWH) 696,990                  1,35/,013            ld ,73 9,542 f S. Un t Sersne Factor                                  100.0                        93.0                  78.4 2J. Urit Avalshiity Factor                                100.0                        93.0                  78.4
: 21. Un!t Capaciiy Factor (Using Mr.C %t)                  100.5                        91.5                  74.3
: 22. Unit Capacity Factor IUsinp 0ER Net)                      7*4                      08.7                  72.0 U'U                        .#
* U                #*U
: 23. L'.dt Forced Outage Rate 24., St.utJowns Scheduled Ovry Nc. 6 Months IT)pe. Date.and Duration of Each):
                    ,                                                        No shutdowns are sclnluled
                      '/*,'!! She Down At End Ofitepost Period, Estinsated Date of Startup:        M/^
: 26. Units 1.s Test Sutus iI5or to Commercial Operation):                            Forecast              Achiesed INITIAL CRillCALITY INITIAL ELEC TRICITY COMWIRCIAL OPER ATION (4/77 )
 
gANN4                                                                                                                              .
j ,l      y            y                                                                                                                  .
Lb                d                            UNIT SHUTDOWNS AND POWER REDUC 110NS                DOCKETNO. 50-388 ef,    g                                                                                                UNIT NAME SSES - Unit 'I%o DATE 03/05/87 f C'?gIC        5s                                      REPORTMONTH February 1987                  COMPLETED BY T.S. e/ der TELEPHONE II'ID42-32dD
                                                *                                    -_E                                  e
                                                            -        EO      "E
* E5        Licensee    E-r        En              Cause & Corrective No.          Date E    3l        $    3jE          Event      5i                                Action to H                5                              mO          h'3 f                j di g      Report a g                Prevent Recurrence 5
2          870206              F        0      A        5            N/A    TB          FAN    Power reduced to approx. 65% to replace failed bearings on the isophase bus duct cooling fan.
I                            2                                                3                            4 F: Forced                    Reason:                                          M:; hod:                      Exhibit G-Instructions S: Scheduled                A-Equipment Failure (Esniain)                    1-Manual                      for Preparation of Data B-Maintenance of Test                            2-Manual Scram.                Entry Sheets for Licensee C-Refueling                                      3-Automatic Scram.            Event Report (LER) File (NUREG-D-Regulatory Restriction                          4 Continuation                0161)
E-Operator Training & License Examination          from previous month F-Administrative                                                              5 G-Operational Error (Explain)                    5-Reduction Exhibit I- Same Source 19/77)                          ll-Other(Explain)                                9-Other
 
f SLBQUEHRIOR STEAM ELECTRIC STRrION Docket Ntznber 50-388. Date 03/05/87 Capleted by T.S. Ryder        Telephone (717)S42-3235 Otallenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None
 
s- A.
PP&L Pennsylvania Power & Light Company Two North Ninth Street
* Allentown, PA 18101 = 215 / 770L5151 MAR 131987                                                                  Submitted Pursuant to Technical Specifications Harold W. Keiser                                                            Section 6.9.1.6 Vice President-Nuclear Operations 215/770-7502 Director, Data Automation &
Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.        20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS                                                Docket Nos. 50-387/NPF-14 PLA-2810                      FILE R41-2A                                                50-388/NPF-22
 
==Dear Mr. Beebe:==
 
The February 1987 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, s
                  '\
H. W. Keiser Vice President-Nuclear Operations Attachment cc: Document Control Desk (Original)
NRC Region I Mr. L. R. Plisco - NRC Resident Mr. M. C. Thadani - NRC Project Manager
                                                                                                        }q}}

Latest revision as of 15:27, 5 December 2021