ML20210T105: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
(No difference)
|
Revision as of 20:15, 2 December 2021
| ML20210T105 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 12/24/1975 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Deyoung R Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-1661 NUDOCS 8605290721 | |
| Download: ML20210T105 (1) | |
Text
(Lgksf I
[f DISTRIBUTION:
Docket File NRR Reading CS Reading DEC 2 41975 APCSB Reading Docket Nos. S l
R. C. DeYoung, Assistant Director for Light Water Reactors, Group 1 EL
' l t
! AITIILIARY AND POWER CONVERSION SYSTEMS BRANCH, REQUEST POR J
! ADDITIONAL INFORMATION t
! Plant Name: WPPSS Nuclear Project No. 3 and No. 5 Licensing Stage: CP
! Docket Numbers: STN 50-508; STN 50-509 l Milentone Number: 12-02 Responsible Branch: LWR l-3 Project Manager: A. Bournia The Auxiliary and Power Conversion Systems Branch has reviewed Amendments i 25 and 26 of the PSAR regarding design changes in the WPPSS 3 and 5 plants.
6 Enclosed is our position in rerard to the proposed diesel fuel oil storage tanks arrangement relative to fire protection of the essential equipment.
Robert L. Tedesco, Assistant Director for Containment Safety
- Division of Technical Review
Enclosure:
! As Stated cc: S. Hanauer, TA W. Mcdonald, MIPC R. Boyd, RL r R. Heinessen, TR O. Parr, RL l
V. Benaroya, APCSB i
A. Bournia, RL D. Fischer, AFCSB P. Matthews, APCSB l
O721 751gg4 n C C. Lians, APCSB h52l F DOCK 05000508 PDR D. Eisenhut, NRR i
I i
o ,,,c ,
- APCS.B:C TR CS:
APCSB:CS:T_R f._
@APCSB:CS:T r rte do D
.u...,*
CLiang:mc c g,PMAtth ys _ _
I
..,.
- 12/24 /75 12/2y/75 .l. /75 12p /75_
Form AEC.)l3 (Rev. 9 53) AECM 0240 W u. s. oovEmmasEMT PalNTING OFFICES l,74 336. tSe