ML20213G051: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[U-600927, Monthly Operating Rept for Apr 1987]]
| number = ML20213G051
| issue date = 04/30/1987
| title = Monthly Operating Rept for Apr 1987
| author name = Spangenberg F
| author affiliation = ILLINOIS POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000461
| license number =
| contact person =
| document report number = U-600927, NUDOCS 8705180103
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 5
}}
 
=Text=
{{#Wiki_filter:.      . . . .          .            ._                        . -  . . _              .    . . .        .-                      .~          . - . . _.
            .S.
:.1                                                ' MONTHLY OPERATING REPORT FORMAT AND INSTRUCTIONS
.                                                                    AVERAGE DAILY UNIT. POWER LEVEL DOCKET NO.                        50-461 UNIT        Clinton 1:
DATE        04/30/87 COMPLETED BY                        F. A. Spangenberg TELEPHONE (217) 935-8881 -X3400
                  ' MONTH          -April, 1987
~
DAY AVERAGE DAILY POWER LEVEL                                                  DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                                                                  -(MWe-Net) 1                          0-                                            17                                0 2                          0                                            18                                0 3                          0                                              19                                0
                          .4                          0                                            20                                0
.,-                        5.                          0                                            21                                0 i                                                                                                    22                                0 6                          0-7-                          0                                            23                                0
                          .8                          0                                            24                                5-
,                                                0                                            25                                7
!                        10                          0-                                            26                            18 11                          0                                            27                                0 i
12                          0                                            28                            35 1
13                          0                                            29                            43
;                        14                          0                                            30                            43 15                          0                                            31                            N/A
                      -16                            0                                                                                                                            ;
INSTRUCTIONS l'
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
                  .These figures will be used to plot a graph for each reporting month. Note 1
that when maximum dependable capacity is used for the net electrical rating of
                    .the' unit, there may be occasions when the daily average power level. exceeds the.100% line-(or the restricted power level line).                                                In such cases, the average daily unit power output sheet should be footnoted ta explain the
,                    apparent anomaly.
c 8705180103 870430 "
PDR- ADOCK 05000461
            -. R -
PDRj h
 
.                                    OPERATING DATA REPORT DOCKET NO. 50-461 UNIT  Clinton 1 DATE  04/30/87 COMPLETED BY    F.  '
                                                                    . Spangenberg TELEPHONE (217) 935-8881 X3400 OPERATING STATUS
: 1. REPORTING PERIOD:    April, 1987 GROSS HOURS IN REPORTING PERIOD:          719
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):      2894 MAX. DEPEND. CAPACITY (MWe-Net): Not Available- DESIGN ELECTRICAL RATING (MWe-Net): 933
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 933
: 4. REASONS FOR RESTRICTION (IF ANY):      N/A THIS MONTH YR TO DATE CUMULATIVE
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL...        719        1228          1228
: 6. REACTOR RESERVE SHUTDOWN HOURS.........        0            0            0
: 7. HOURS GENERATOR ON LINE................        61          61          61
: 8. UNIT RESERVE SHUTDOWN HOURS............        0            0            0
: 9. GROSS THERMAL ENERGY GENERATED (MWH)..      79,489      83,772-      83,772
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)      4675        4675          4675
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)..        0            0            0
: 12. REACTOR SERVICE FACTOR.................      N/A
: 13. REACTOR AVAILABILITY FACTOR............      N/A
: 14. UNIT SERVICE FACT 0R....................      N/A
: 15. UNIT AVAILABILITY FACTOR...............      N/A
: 16. UNIT CAPACITY FACTOR (Using MDC).......      N/A
: 17. UNIT CAPACITY FACTOR (Using Design MWe)      N/A 18  UNIT FORCED OUTAGE RATE................      N/A
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): Maintenance shutdown, September 17, 1987, 21 days.
: 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):      FORECAST ACHIEVED INITIAL CRITICALITY                                              2/27/87 INITIAL ELECTRICITY (Synchronization)                            4/24/87 COMPLETION OF WARRANTY RUN                            10/19/87
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.        50-461 UNIT. Clinton 1 DATE    04/30/87 COMPLETED BY        F. A. Spangenberg TELEPHONE (217) 935-8881 X3400 REPORT MONTH April, 1987 METHOD OF TYPE                                SHUTTING DOWN F: FORCED DURATION                    THE REACTOR OR (HOURS)    REASON (1)    REDUCING POWER (2)      CORRECTIVE ACTIONS / COMMENTS NO. DATE S: SCHEDULED N/A    N/A      N/A      N/A      (H) Unit is          N/A            (1) REASON in Startup                                A: EQUIPMENT FAILURE _(EXPLAIN)
Testing                                    B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
(2) METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN)
 
==SUMMARY==
 
  .s.-                                                                                                  U-600927 L30-87 (05-12 )-L 1A.120 ILLIN0/8 POWER COMPANY CLINTON POWER STATION P.O. 80x 678, CLINTON, ILLINOIS 61727 10CFR50.36 RG 1.16 May 12, 1987 Docket No. 50-461 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555
 
==Subject:==
Clinton Power Station, Unit 1
                                                    ~
April 1987 Monthly Operating Report NPF-62
 
==Dear Sir:==
 
Please find enclosed the monthly operating report for Clinton Power Station, Unit 1, for the period ending April 30, 1987.
Sincerely yours, M*
F. A. Spangenberg-Manager - Licensing and Safety
!                      GSL/cke l
Enclosure
;                      cc: Regional Administrator, Region III, USNRC i
                                                                                                                            /  I 1 l t
      ,  . _ , . - - - - . . - . . ~      , _ , ,
 
4 CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month April 1987 None}}

Latest revision as of 18:13, 27 July 2021