U-600927, Monthly Operating Rept for Apr 1987
| ML20213G051 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 04/30/1987 |
| From: | Spangenberg F ILLINOIS POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| U-600927, NUDOCS 8705180103 | |
| Download: ML20213G051 (5) | |
Text
.
.~
.S.
- .1
' MONTHLY OPERATING REPORT FORMAT AND INSTRUCTIONS AVERAGE DAILY UNIT. POWER LEVEL DOCKET NO.
50-461 UNIT Clinton 1:
DATE 04/30/87 COMPLETED BY F. A. Spangenberg TELEPHONE (217) 935-8881 -X3400
' MONTH
-April, 1987
~
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
-(MWe-Net) 1 0-17 0
2 0
18 0
3 0
19 0
.4 0
20 0
5.
0 21 0
i 6
0-22 0
7-0 23 0
.8 0
24 5- 0 25 7
10 0-26 18 11 0
27 0
i 12 0
28 35 1
13 0
29 43 14 0
30 43 15 0
31 N/A
-16 0
INSTRUCTIONS l
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
.These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of 1
.the' unit, there may be occasions when the daily average power level. exceeds the.100% line-(or the restricted power level line).
In such cases, the average daily unit power output sheet should be footnoted ta explain the apparent anomaly.
c h
8705180103 870430 "
PDR-ADOCK 05000461
-. R -
PDRj
OPERATING DATA REPORT DOCKET NO.
50-461 UNIT Clinton 1 DATE 04/30/87 COMPLETED BY F.
. Spangenberg TELEPHONE (217) 935-8881 X3400 OPERATING STATUS 1.
REPORTING PERIOD:
April, 1987 GROSS HOURS IN REPORTING PERIOD:
719 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
2894 MAX. DEPEND. CAPACITY (MWe-Net): Not Available-DESIGN ELECTRICAL RATING (MWe-Net): 933 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 933 4.
REASONS FOR RESTRICTION (IF ANY):
N/A THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL...
719 1228 1228 6.
REACTOR RESERVE SHUTDOWN HOURS.........
0 0
0 7.
HOURS GENERATOR ON LINE................
61 61 61 8.
UNIT RESERVE SHUTDOWN HOURS............
0 0
0 9.
GROSS THERMAL ENERGY GENERATED (MWH)..
79,489 83,772-83,772 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 4675 4675 4675 11.
NET ELECTRICAL ENERGY GENERATED (MWH)..
0 0
0 12.
REACTOR SERVICE FACTOR.................
N/A 13.
REACTOR AVAILABILITY FACTOR............
N/A 14.
UNIT SERVICE FACT 0R....................
N/A 15.
UNIT AVAILABILITY FACTOR...............
N/A 16.
UNIT CAPACITY FACTOR (Using MDC).......
N/A 17.
UNIT CAPACITY FACTOR (Using Design MWe)
N/A 18 UNIT FORCED OUTAGE RATE................
N/A 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): Maintenance shutdown, September 17, 1987, 21 days.
20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 2/27/87 INITIAL ELECTRICITY (Synchronization) 4/24/87 COMPLETION OF WARRANTY RUN 10/19/87
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-461 UNIT.
Clinton 1 DATE 04/30/87 COMPLETED BY F. A. Spangenberg TELEPHONE (217) 935-8881 X3400 REPORT MONTH April, 1987 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED (HOURS)
REASON (1)
REDUCING POWER (2)
CORRECTIVE ACTIONS / COMMENTS N/A N/A N/A N/A (H) Unit is N/A (1) REASON in Startup A: EQUIPMENT FAILURE _(EXPLAIN)
Testing B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
(2) METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN)
SUMMARY
.s.-
U-600927 L30-87 (05-12 )-L 1A.120 ILLIN0/8 POWER COMPANY CLINTON POWER STATION P.O. 80x 678, CLINTON, ILLINOIS 61727 10CFR50.36 RG 1.16 May 12, 1987 Docket No. 50-461 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Clinton Power Station, Unit 1
~
April 1987 Monthly Operating Report NPF-62
Dear Sir:
Please find enclosed the monthly operating report for Clinton Power Station, Unit 1, for the period ending April 30, 1987.
Sincerely yours, M*
F. A. Spangenberg-Manager - Licensing and Safety GSL/cke l
Enclosure cc: Regional Administrator, Region III, USNRC i
/
I 1 l t
. -.. ~
4 CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month April 1987 None