U-600927, Monthly Operating Rept for Apr 1987

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1987
ML20213G051
Person / Time
Site: Clinton 
Issue date: 04/30/1987
From: Spangenberg F
ILLINOIS POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
U-600927, NUDOCS 8705180103
Download: ML20213G051 (5)


Text

.

.~

.S.

.1

' MONTHLY OPERATING REPORT FORMAT AND INSTRUCTIONS AVERAGE DAILY UNIT. POWER LEVEL DOCKET NO.

50-461 UNIT Clinton 1:

DATE 04/30/87 COMPLETED BY F. A. Spangenberg TELEPHONE (217) 935-8881 -X3400

' MONTH

-April, 1987

~

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

-(MWe-Net) 1 0-17 0

2 0

18 0

3 0

19 0

.4 0

20 0

5.

0 21 0

i 6

0-22 0

7-0 23 0

.8 0

24 5- 0 25 7

10 0-26 18 11 0

27 0

i 12 0

28 35 1

13 0

29 43 14 0

30 43 15 0

31 N/A

-16 0

INSTRUCTIONS l

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

.These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of 1

.the' unit, there may be occasions when the daily average power level. exceeds the.100% line-(or the restricted power level line).

In such cases, the average daily unit power output sheet should be footnoted ta explain the apparent anomaly.

c h

8705180103 870430 "

PDR-ADOCK 05000461

-. R -

PDRj

OPERATING DATA REPORT DOCKET NO.

50-461 UNIT Clinton 1 DATE 04/30/87 COMPLETED BY F.

. Spangenberg TELEPHONE (217) 935-8881 X3400 OPERATING STATUS 1.

REPORTING PERIOD:

April, 1987 GROSS HOURS IN REPORTING PERIOD:

719 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

2894 MAX. DEPEND. CAPACITY (MWe-Net): Not Available-DESIGN ELECTRICAL RATING (MWe-Net): 933 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 933 4.

REASONS FOR RESTRICTION (IF ANY):

N/A THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL...

719 1228 1228 6.

REACTOR RESERVE SHUTDOWN HOURS.........

0 0

0 7.

HOURS GENERATOR ON LINE................

61 61 61 8.

UNIT RESERVE SHUTDOWN HOURS............

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (MWH)..

79,489 83,772-83,772 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 4675 4675 4675 11.

NET ELECTRICAL ENERGY GENERATED (MWH)..

0 0

0 12.

REACTOR SERVICE FACTOR.................

N/A 13.

REACTOR AVAILABILITY FACTOR............

N/A 14.

UNIT SERVICE FACT 0R....................

N/A 15.

UNIT AVAILABILITY FACTOR...............

N/A 16.

UNIT CAPACITY FACTOR (Using MDC).......

N/A 17.

UNIT CAPACITY FACTOR (Using Design MWe)

N/A 18 UNIT FORCED OUTAGE RATE................

N/A 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): Maintenance shutdown, September 17, 1987, 21 days.

20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 2/27/87 INITIAL ELECTRICITY (Synchronization) 4/24/87 COMPLETION OF WARRANTY RUN 10/19/87

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-461 UNIT.

Clinton 1 DATE 04/30/87 COMPLETED BY F. A. Spangenberg TELEPHONE (217) 935-8881 X3400 REPORT MONTH April, 1987 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.

DATE S: SCHEDULED (HOURS)

REASON (1)

REDUCING POWER (2)

CORRECTIVE ACTIONS / COMMENTS N/A N/A N/A N/A (H) Unit is N/A (1) REASON in Startup A: EQUIPMENT FAILURE _(EXPLAIN)

Testing B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

(2) METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN)

SUMMARY

.s.-

U-600927 L30-87 (05-12 )-L 1A.120 ILLIN0/8 POWER COMPANY CLINTON POWER STATION P.O. 80x 678, CLINTON, ILLINOIS 61727 10CFR50.36 RG 1.16 May 12, 1987 Docket No. 50-461 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Clinton Power Station, Unit 1

~

April 1987 Monthly Operating Report NPF-62

Dear Sir:

Please find enclosed the monthly operating report for Clinton Power Station, Unit 1, for the period ending April 30, 1987.

Sincerely yours, M*

F. A. Spangenberg-Manager - Licensing and Safety GSL/cke l

Enclosure cc: Regional Administrator, Region III, USNRC i

/

I 1 l t

. -.. ~

4 CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month April 1987 None