| By letter dated October 14, 2020 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML20288A432), Tennessee Valley Authority (TVA) requested a temporary exemption from the annual force-on-force (FOF) requirement of Title 10 of the Code of Federal Regulations (CFR) Part 73, Appendix B, Section VI, paragraph C.3.(l)(1) for the Watts Bar Nuclear Plant (WBN), Units 1 and 2. This regulation requires that: | | By {{letter dated|date=October 14, 2020|text=letter dated October 14, 2020}} (Agencywide Documents and Access Management System (ADAMS) Accession No. ML20288A432), Tennessee Valley Authority (TVA) requested a temporary exemption from the annual force-on-force (FOF) requirement of Title 10 of the Code of Federal Regulations (CFR) Part 73, Appendix B, Section VI, paragraph C.3.(l)(1) for the Watts Bar Nuclear Plant (WBN), Units 1 and 2. This regulation requires that: |
| Each member of each shift who is assigned duties and responsibilities required to implement the safeguards contingency plan and licensee protective strategy participates in at least one (1) tactical response drill on a quarterly basis and one (1) force-on-force exercise on an annual basis. | | Each member of each shift who is assigned duties and responsibilities required to implement the safeguards contingency plan and licensee protective strategy participates in at least one (1) tactical response drill on a quarterly basis and one (1) force-on-force exercise on an annual basis. |
| TVA stated that it expects that WBN will no longer be able to comply with the requirements of the specified regulation, and will implement site-specific coronavirus 2019 (COVID-19) public health emergency (PHE) training requalification controls consistent with those conditions outlined in the NRC Letter from H. Nieh and J. Lubinski to NEI, U.S. Nuclear Regulatory Commission Planned Actions Related to the Requirements for Part 73, Appendix B, Section VI During the Coronavirus Disease 2019 Public Health Emergency, dated April 20, 2020 (ADAMS Accession No. ML20105A483). | | TVA stated that it expects that WBN will no longer be able to comply with the requirements of the specified regulation, and will implement site-specific coronavirus 2019 (COVID-19) public health emergency (PHE) training requalification controls consistent with those conditions outlined in the NRC Letter from H. Nieh and J. Lubinski to NEI, U.S. Nuclear Regulatory Commission Planned Actions Related to the Requirements for Part 73, Appendix B, Section VI During the Coronavirus Disease 2019 Public Health Emergency, dated April 20, 2020 (ADAMS Accession No. ML20105A483). |
Revision as of 21:44, 7 March 2021
Letter Sequence RAI |
---|
|
|
MONTHYEARML20308A3512020-11-0202 November 2020 Request for Additional Information on WBN Request for Exemption from 10 CFR Part 73, Appendix B, Section VI for the Conduct of an Annual Force-on-Force Exercise (EPID L-2020-LLE-0165 (COVID-19)) Project stage: RAI ML20308A3502020-11-0202 November 2020 E-mail, Request for Additional Information on WBN Request for Exemption from 10 CFR Part 73, Appendix B, Section VI for the Conduct of an Annual Force-on-Force Exercise (EPID L-2020-LLE-0165 (COVID-19)) Project stage: RAI 2020-11-02
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23030A3512023-01-25025 January 2023 Notification of Watts Bar Nuclear Plant - Design Bases Assurance Inspection (Programs) and Initial Information Request ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to TVAs Request to Revised the TVA Plants Radiological Emergency Plans ML22115A1402022-04-25025 April 2022 NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) ML22083A2372022-03-24024 March 2022 NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to TVAs Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21221A2602021-08-0909 August 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary ML21102A1312021-04-19019 April 2021 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Unit 1 ML21095A0422021-04-0202 April 2021 NRR E-mail Capture - Added Clarification to RAI 2 for Thot LAR ML21095A0402021-04-0202 April 2021 NRR E-mail Capture - Request for Additional Information Re Generic Letter 95-05 90-Day Report and LAR to Adjust Growth Rate for Thot (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21091A0772021-04-0101 April 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21095A0412021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0442021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0462021-03-22022 March 2021 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Generic Letter 95-05 90-Day Report for Watts Bar Unit 2 ML21039A6402021-02-0808 February 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 1 Technical Specifications Related to Steam Generator Tube Inspection Frequency ML21012A2032021-01-11011 January 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar UFSAR to Use Alternate Probability of Detection ML20350B5592020-12-15015 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Adopt Traveler TSTF-490 Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML20338A3202020-12-0303 December 2020 Notification of an NRC Fire Protection Team Inspection (NRC Inspection Report 05000390/2021011 and 05000391/2021011) and Request for Information ML20322A4412020-11-17017 November 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20322A4392020-11-0505 November 2020 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20308A3512020-11-0202 November 2020 Request for Additional Information on WBN Request for Exemption from 10 CFR Part 73, Appendix B, Section VI for the Conduct of an Annual Force-on-Force Exercise (EPID L-2020-LLE-0165 (COVID-19)) ML20253A1782020-09-0909 September 2020 Emergency Preparedness Program Inspection Request for Information ML20266G4592020-08-14014 August 2020 Notification of Inspection and Request for Information ML20196L8622020-07-14014 July 2020 NRR E-mail Capture - Watts Bar Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Request to Implement the Full Spectrum LOCA Methodology ML20086G4802020-03-26026 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) - Part 2 ML20085G3572020-03-25025 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20084M1942020-03-24024 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20083J3952020-03-12012 March 2020 NRR E-mail Capture - Draft Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML19340A6842019-12-0505 December 2019 NRR E-mail Capture - Request for Additional Information for WBN2 Request for One-Time Extension of Completion Time for TS 3.7.8 (L-2019-LLA-0020) ML19218A0302019-08-0505 August 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19218A0282019-07-25025 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Draft Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19186A4352019-07-0505 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Correction to Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19169A3592019-06-18018 June 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19148A7912019-05-28028 May 2019 NRR E-mail Capture - Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request for Alternative to OM Code Requirements ML19106A0462019-04-15015 April 2019 NRR E-mail Capture - Watts BAR, Units 1 and 2 Request for Additional Informatin (RAI) Regarding Changes to Technical Specifications Sections 3.8.1, 3.8.7, 3.8.8, and 3.8.9 ML19071A3542019-03-0808 March 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request to Adopt TSTF-425 to Relocate Specific Surveillance Frequency Requirements to Licensee-Controlled Program ML18313A2202018-11-0707 November 2018 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML18282A6372018-10-0909 October 2018 NRR E-mail Capture - RAIs (Final) - LAR to Revise the Steam Generator Technical Specifications for Watts Bar Nuclear Plant, Unit 2 ML18270A2362018-09-26026 September 2018 NRR E-mail Capture - Watts Bar Units 1 and 2 RAIs - Modify TS 3.8.9 Completion Time for Inoperable 120V AC Vital Buses (L-2018-LLA-0050) 2024-09-10
[Table view] |
Text
REQUEST FOR ADDITIONAL INFORMATION TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-390 AND 50-391 ONE-TIME EXEMPTION FROM 10 CFR 73, APPENDIX B, SECTION VI, SUBSECTION C.3.(I)(1) REGARDING ANNUAL FORCE-ON-FORCE EXERCISES DUE TO COVID-19 PANDEMIC
Background
By letter dated October 14, 2020 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML20288A432), Tennessee Valley Authority (TVA) requested a temporary exemption from the annual force-on-force (FOF) requirement of Title 10 of the Code of Federal Regulations (CFR) Part 73, Appendix B,Section VI, paragraph C.3.(l)(1) for the Watts Bar Nuclear Plant (WBN), Units 1 and 2. This regulation requires that:
Each member of each shift who is assigned duties and responsibilities required to implement the safeguards contingency plan and licensee protective strategy participates in at least one (1) tactical response drill on a quarterly basis and one (1) force-on-force exercise on an annual basis.
TVA stated that it expects that WBN will no longer be able to comply with the requirements of the specified regulation, and will implement site-specific coronavirus 2019 (COVID-19) public health emergency (PHE) training requalification controls consistent with those conditions outlined in the NRC Letter from H. Nieh and J. Lubinski to NEI, U.S. Nuclear Regulatory Commission Planned Actions Related to the Requirements for Part 73, Appendix B,Section VI During the Coronavirus Disease 2019 Public Health Emergency, dated April 20, 2020 (ADAMS Accession No. ML20105A483).
In the request, TVA stated that the grace period for conducting the calendar year (CY) 2020 FOF exercise at WBN expires on November 5, 2020. TVA also stated that because of company guidelines regarding the postponement of telework/reintegration Phase 1 posture until at least January 1, 2021, and social distancing expectations, WBN will not be able to complete the 2020 FOF annual exercises.
TVA stated that the period during which the exemption is necessary will be in effect until the end of the CY 2020.
Issue On October 13, 2020, the NRC issued updated guidance for licensees that require exemptions from CY 2020 annual FOF exercises during the COVID-19 PHE. The guidance states, in part:
. . . the impacts of COVID-19 are still ongoing for some licensees and will likely extend beyond December 31, 2020. These circumstances may prevent licensees from completing their missed CY 2020 FOF exercises by December 31, 2020. They may also prevent licensees that did not previously request an exemption from the annual FOF exercise requirements and, therefore, are still required to complete an FOF exercise before the end of the CY, from being able to complete that exercise by December 31, 2020. To address this situation, the NRC is prepared to expedite consideration of requests for an exemption that would relieve licensees from making up any missed CY 2020 annual FOF exercises. The NRC is also prepared to expedite consideration of exemption requests from the requirement to conduct an annual FOF exercise in CY 2020 for those licensees who were not previously granted such an exemption.
This updated guidance also requests that licensees that have not previously been granted a temporary exemption from the annual FOF exercise requirement should submit the following information:
- a discussion as to why the licensee is unable to perform a CY 2020 FOF exercise before December 31, 2020, due to continuing COVID-19 PHE impacts. In support of the new exemption request, these licensees should include the information requested in Enclosure C to the April 20, 2020, letter; and
- In addition to the information above, a description of how they intend to maintain contingency response readiness.
Requests
- 1. TVAs submittal appears to be requesting an exemption from the requirement to conduct an annual FOF exercise in CY 2020 by following the NRCs April 20, 2020, guidance.
The April 20th guidance provides licensees with additional flexibility to complete security training requirements, including the annual FOF exercise, during CY 2020. Since the TVA submittal indicates WBN will not be able to complete the 2020 FOF annual exercise, the NRC needs additional information as requested in its October 13, 2020, updated guidance letter for consideration in granting relief from the requirement to conduct an annual FOF exercise in CY 2020. Clarify whether TVAs intent is to request relief from the requirement to conduct an annual FOF exercise in CY 2020.
- 2. If TVA intends to request an exemption from the requirement to conduct an annual FOF exercise in CY 2020, provide the following information as requested in the October 13, 2020, updated guidance:
- a. the site-specific condition(s), including site-specific COVID-19-related impacts, that will prevent WBN from completing its CY 2020 annual FOF exercise prior to December 31, 2020; and
- b. other than continuing to conduct quarterly tactical response drills and tabletop exercises, describe the security training activities that WBN will conduct that
reinforce the skills or activities associated with annual FOF exercises and contribute to WBNs ability to maintain contingency response readiness. to EGM 20-002, Enforcement Guidance Memorandum 20-002 - , Dispositioning Violations of NRC Requirements for Completion Periodicities Associated with Security Training and Requalification Requirements During the COVID-19 Public Health Emergency (ADAMS Accession No. ML20091L385), and Regulatory Guide 5.75, Training and Qualification of Security Personnel at Nuclear Power Reactor Facilities (ADAMS Accession No. ML091690037), provide the following examples of such activities: timeline and limited-scope drills, virtual-based communication exercises, firearms qualifications and range activities, and individual walkdowns of response routes and contingency positions.