ENS 54796: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 10: Line 10:
| utype = W-3-LP
| utype = W-3-LP
| cfr = 10 CFR 50.72(b)(2)(i)
| cfr = 10 CFR 50.72(b)(2)(i)
| emergency class = Non Emergency  
| emergency class = Non Emergency
| notification date = 07/21/2020 12:42
| notification date = 07/21/2020 12:42
| notification by = Kirk Schauer
| notification by = Kirk Schauer
Line 22: Line 22:
Shutdown was initiated and power was reduced approximately 3 percent. Reactor power was back to 98.5 percent at the time of notification.
Shutdown was initiated and power was reduced approximately 3 percent. Reactor power was back to 98.5 percent at the time of notification.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200722en.html#en54796
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200722en.html#en54796
}}{{unit info
| Unit =  2
| type =
| Scram code =  N
| Reactor critical =  Y
| Initial power =  100
| Initial reactor mode =  Power Operation
| Current power =  99
| Current reactor mode =  Power Operation
}}
}}


{{ENS-Nav}}[[Category:Power Reactor]]
{{ENS-Nav}}[[Category:Power Reactor]]

Latest revision as of 12:31, 15 January 2021

ENS 54796 +/-
Where
Robinson Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-0.15 h-0.00625 days <br />-8.928571e-4 weeks <br />-2.0547e-4 months <br />)
Opened: Kirk Schauer
12:42 Jul 21, 2020
NRC Officer: Ossy Font
Last Updated: Jul 21, 2020
54796 - NRC Website
Loading map...