ENS 55053: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 23: Line 23:
The licensee believes the sirens actuated due to significant rain in the area but will be investigating the cause of the inadvertent actuation.
The licensee believes the sirens actuated due to significant rain in the area but will be investigating the cause of the inadvertent actuation.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201231en.html#en55053
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201231en.html#en55053
}}{{unit info
| Unit = 1
| type = W-4-LP
| Scram code = N
| Reactor critical = Y
| Initial power = 100
| Initial reactor mode = Power Operation
| Current power = 100
| Current reactor mode = Power Operation
}}{{unit info
| Unit = 2
| type = W-4-LP
| Scram code = N
| Reactor critical = Y
| Initial power = 100
| Initial reactor mode = Power Operation
| Current power = 100
| Current reactor mode = Power Operation
}}
}}


{{ENS-Nav}}[[Category:Power Reactor]]
{{ENS-Nav}}[[Category:Power Reactor]]

Revision as of 10:55, 15 January 2021

ENS 55053 +/-
Where
South Texas STP Nuclear Operating Company icon.png
Texas (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-1.33 h-0.0554 days <br />-0.00792 weeks <br />-0.00182 months <br />)
Opened: David Wurtz
20:30 Dec 30, 2020
NRC Officer: Howie Crouch
Last Updated: Dec 30, 2020
55053 - NRC Website
Loading map...