ENS 55030: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{ENS notification
{{ENS notification
| event number = 55030
| event number = 55030
| facility =  
| facility = Grand Gulf
| Organization =  
| Organization =  
| license number =  
| license number =  
| region =  
| region = 4
| state =  
| state = Mississippi
| city =  
| city =  
| unit =  
| unit = 1
| utype =  
| utype = GE-6
| cfr = <Br>
| cfr = 10 CFR 50.72(b)(2)(iv)(B)
50.72(B)(2)(Iv)(B)
| emergency class = Non Emergency
| emergency class =  
| notification date = 12/11/2020 15:15
| notification date = </b> 15:15
| notification by = Gabriel Hargrove
| notification by = </B> Gabriel Hargrove
| NRC officer = Kerby Scales
| NRC officer = </B> Kerby Scales
| event date = 12/11/2020 12:04 CST
| event date = </b> 12/11/2020 </b>  12:04 CST
| last update date = 12/11/2020
| last update date = </b> 12/11/2020
| title = Automatic Reactor Scram Due to Main Turbine / Generator Trip
| title =  
| event text = On December 11, 2020 at 1204 CST, Grand Gulf Nuclear Station (GGNS) experienced an Automatic Reactor Scram from 100 percent Reactor Power after a Main Turbine and Generator Trip.
| event text =  
All Control Rods fully inserted and there were no complications.  All systems responded as designed.
Reactor pressure is being maintained with Main Turbine Bypass Valves.  Reactor water level is being maintained in normal band with the condensate system.
No radiological releases have occurred due to this event from the unit.
The NRC Branch Chief has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201214en.html#en55030
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201214en.html#en55030
}}
}}


{{ENS-Nav}}[[Category:Power Reactor]]
{{ENS-Nav}}[[Category:Power Reactor]]

Revision as of 01:33, 15 January 2021

ENS 55030 +/-
Where
Grand Gulf Entergy icon.png
Mississippi (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+-2.82 h-0.118 days <br />-0.0168 weeks <br />-0.00386 months <br />)
Opened: Gabriel Hargrove
15:15 Dec 11, 2020
NRC Officer: Kerby Scales
Last Updated: Dec 11, 2020
55030 - NRC Website
Loading map...