ENS 54476: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 13: Line 13:
| notification date = 01/14/2020 10:37
| notification date = 01/14/2020 10:37
| notification by = Rob Hale
| notification by = Rob Hale
| NRC officer = Andrew Waugh</Td>
| NRC officer = Andrew Waugh
| event date = 12/27/2019 00:00 EST
| event date = 12/27/2019 00:00 EST
| last update date = 01/14/2020
| last update date = 01/14/2020
| title = Part 21 - Incorrect Tip Material Used on Gauges
| title = Part 21 - Incorrect Tip Material Used on Gauges
| event text =  
| event text = On December 27, 2019, United Controls International received a Product Advisory Letter from Ashcroft Inc. dated December 2, 2019 informing of a potential error in the tip material used on Ashcroft 2 &laquo; inch and 3 &laquo; inch model 1009, 63 mm model 2008, 63 mm and 100 mm model 1008 industrial gauges along with Weksler 3 &laquo; inch regal gauges. Due to a supplier issue, 304SS tip material may have been supplied on the subject gauges instead of the specified 316SS material. In certain applications the 304SS tip material may be subject to accelerated oxidation or degradation, resulting in potential release of process media. However, no detrimental effects are expected in non-corrosive applications.
On December 27, 2019, United Controls International received a Product Advisory Letter from Ashcroft Inc. dated December 2, 2019 informing of a potential error in the tip material used on Ashcroft 2 &laquo; inch and 3 &laquo; inch model 1009, 63 mm model 2008, 63 mm and 100 mm model 1008 industrial gauges along with Weksler 3 &laquo; inch regal gauges. Due to a supplier issue, 304SS tip material may have been supplied on the subject gauges instead of the specified 316SS material. In certain applications the 304SS tip material may be subject to accelerated oxidation or degradation, resulting in potential release of process media. However, no detrimental effects are expected in non-corrosive applications.


Hatch and Farley have been identified as the affected plants and have been notified of this issue.
Hatch and Farley have been identified as the affected plants and have been notified of this issue.

Revision as of 23:58, 14 January 2021

ENS 54476 +/-
Where
United Controls International
Norcross, Georgia (NRC Region 1)
Organization: United Controls International
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+437.62 h18.234 days <br />2.605 weeks <br />0.599 months <br />)
Opened: Rob Hale
10:37 Jan 14, 2020
NRC Officer: Andrew Waugh
Last Updated: Jan 14, 2020
54476 - NRC Website