05000275/FIN-2008004-03: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{finding
{{finding
| title = Inadequate Operability Evaluation Of Reactor Coolant Leakage Detection System
| title = Inadequate Operability Evaluation of Reactor Coolant Leakage Detection System
| docket = 05000275, 05000323
| docket = 05000275, 05000323
| inspection report = IR 05000275/2008004
| inspection report = IR 05000275/2008004

Latest revision as of 19:35, 20 February 2018

03
Site: Diablo Canyon Pacific Gas & Electric icon.png
Report IR 05000275/2008004 Section 1R15
Date counted Sep 30, 2008 (2008Q3)
Type: NCV: Green
cornerstone Barrier Integrity
Identified by: NRC identified
Inspection Procedure: IP 71111.15
Inspectors (proximate) M Brown
M Peck
P Elkmann
L Ellershaw
S Graves
J Adams
CCA P.2, Evaluation
INPO aspect PI.2
'