05000220/FIN-2000003-03: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 12: | Line 12: | ||
| identified by = NRC | | identified by = NRC | ||
| Inspection procedure = IP 71152 | | Inspection procedure = IP 71152 | ||
| Inspector = B | | Inspector = B Fuller, M Ferdas, W Cook, J Nick, D Lew, C Sisco, J Carrasco, J Yerokun | ||
| CCA = N/A for ROP | | CCA = N/A for ROP | ||
| INPO aspect = | | INPO aspect = | ||
| description = The prescribed corrective actions for the Deviation/Event Reports reviewed, appeared appropriate to correct the problems. The backlog of corrective actions was being managed well and the team did not identify any backlogged action that represented an adverse effect on plant risk. (Section 4OA2.3) | | description = The prescribed corrective actions for the Deviation/Event Reports reviewed, appeared appropriate to correct the problems. The backlog of corrective actions was being managed well and the team did not identify any backlogged action that represented an adverse effect on plant risk. (Section 4OA2.3) | ||
}} | }} |
Latest revision as of 20:27, 20 February 2018
Site: | Nine Mile Point |
---|---|
Report | IR 05000220/2000003 Section 4OA1 |
Date counted | Jun 30, 2000 (2000Q2) |
Type: | Finding: |
cornerstone | Miscellaneous |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | B Fuller M Ferdas W Cook J Nick D Lew C Sisco J Carrasco J Yerokun |
INPO aspect | |
' | |