| title = Provides Update to 901115 Ltr Re Progress in Implementing Action Item II of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment | | title = Provides Update to 901115 Ltr Re Progress in Implementing Action Item II of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment | ||
| author name = Fay C | | author name = Fay C | ||
| author affiliation = WISCONSIN ELECTRIC POWER CO. | | author affiliation = WISCONSIN ELECTRIC POWER CO. | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:. . . . . . _ . . . . . - - . . . . | ||
_A 5 f | |||
.; Wisconsin Electnc POWER COMPANY i | |||
231 w uchyst Po ikw 2046 wwoukee. Wi 5320i M M) 220 *S | |||
_ VPNPD 013 NRC 002 January 4, 1991 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC- 20555 Gentlemen: | |||
DOCKETS 50-266 AND 50-301 UPDATE-ON GENERIC LETTER 89-13 SPENT FUEL POOL HEAT EXCHANGERS POINT BEACH NUCLEAR PLANT In a letter dated November 15, 1990, we provided the NRC staff with aniupdate concerning our-progress in implementing selective actions in response to Action Item II-of Generic Letter 89-13, " Service Facer System-Problems Affecting Safety-Related Equipment." In that letter we noted that our schedule to instrument the spent fuel pool coolingLsystem heat exchanger to monitor heat transfer capability-was delayed until the end-of 1990. This letter is to notify you that this modification has now been completed. | |||
Weialso would like to take this opportunity to correct a misleading statement we made in the-November 15 letter concerning these heat | |||
-exchangers. :We' stated-in that-letter that the spent fuel pool cooling system heat exchangers~were inspected in 1990 for the first time after-nearly twenty years of operation. This is an inaccurate statement.- These' heat exchangers were installed during;a spent fuel--pool cooling system upgrade in 1977 and first placed in | |||
'9101150226 910104 PDR ADOCK0500g6 P g[ | |||
.1fTV l""* "~""" ""'" ~""'"" 'IO | |||
,f . | |||
f. | |||
Document-Control Desk January 4,-1991 Page 2 i | |||
i service in February 1978. Therefore, they have been in service for-nearly thirteen, not twenty, years. While we regret this misstatement, we still concluded that the schedule delay we | |||
. proposed in instrumenting these heat exchanger had no impact-on the operability.of;the spent fuel pool cooling system. | |||
Very.truly yours, | |||
/ | |||
h (:l _ | |||
C..W. Fay ~ | |||
Vice President Nuclear Power Copy to: NRC Resident Inspector NRC Regional Administrator ; | |||
i 1 | |||
l | |||
.- ... . . , - .}} | |||
Revision as of 15:22, 21 December 2020
| ML20066D608 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/04/1991 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-91-002, CON-NRC-91-2 GL-89-13, VPNPD-91-013, VPNPD-91-13, NUDOCS 9101150226 | |
| Download: ML20066D608 (2) | |
Text
. . . . . . _ . . . . . - - . . . .
_A 5 f
.; Wisconsin Electnc POWER COMPANY i
231 w uchyst Po ikw 2046 wwoukee. Wi 5320i M M) 220 *S
_ VPNPD 013 NRC 002 January 4, 1991 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC- 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 UPDATE-ON GENERIC LETTER 89-13 SPENT FUEL POOL HEAT EXCHANGERS POINT BEACH NUCLEAR PLANT In a letter dated November 15, 1990, we provided the NRC staff with aniupdate concerning our-progress in implementing selective actions in response to Action Item II-of Generic Letter 89-13, " Service Facer System-Problems Affecting Safety-Related Equipment." In that letter we noted that our schedule to instrument the spent fuel pool coolingLsystem heat exchanger to monitor heat transfer capability-was delayed until the end-of 1990. This letter is to notify you that this modification has now been completed.
Weialso would like to take this opportunity to correct a misleading statement we made in the-November 15 letter concerning these heat
-exchangers. :We' stated-in that-letter that the spent fuel pool cooling system heat exchangers~were inspected in 1990 for the first time after-nearly twenty years of operation. This is an inaccurate statement.- These' heat exchangers were installed during;a spent fuel--pool cooling system upgrade in 1977 and first placed in
'9101150226 910104 PDR ADOCK0500g6 P g[
.1fTV l""* "~""" ""'" ~""'"" 'IO
,f .
f.
Document-Control Desk January 4,-1991 Page 2 i
i service in February 1978. Therefore, they have been in service for-nearly thirteen, not twenty, years. While we regret this misstatement, we still concluded that the schedule delay we
. proposed in instrumenting these heat exchanger had no impact-on the operability.of;the spent fuel pool cooling system.
Very.truly yours,
/
h (:l _
C..W. Fay ~
Vice President Nuclear Power Copy to: NRC Resident Inspector NRC Regional Administrator ;