ML20155G080: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:'
                                                                        ~
            ..                                                                        ~    .
pg        ,og                        UNITED STATES E              o            NUCLEAR REGULATORY COMMISSION n            -l                      W ASHING TON. D. C. 20655
                      #                                October 3, 1988 Docket No. 50-213 Mr. Edward .). Mroczka Senior Vice President Nuclear Engineering and Operations ConnecAicut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141-0270
 
==Dear Mr. Mroczka:==
 
==SUBJECT:==
HADDAM NECK PLANT - TEMPORARY EXEMPTION FROM THE SCHEDULAR REQUIREMdNTS OF THE PROPERTY INSURANCE RULE EFFECTIVE OCTOBER 4, 1988 (10CFR50.54(w)(5)(i))
The Commission has issued the enclosed temporary exemption from the schedular requirenats of the property insurance rule effective October 4, 1988 (10 CFR 50.54(w)(5)(i)) for the Haddam Neck Plant. This part of the rule requires licensees to obtain insurance policies that prioritize insurance proceeds for stabilization and deccatamination after an accident and provide for payment of proceeds to an independent trustee who would disburse funds for decontamination and cleanup before any other purpose.                        -
TheCommissionhasproposedarevisionof10CFR50.54(w)(5)(1) the implementation schedule for 18 months (53 FR 36338, September 19,extending).
1988 However, because it is unlikely that this rulemaking action will be completed by October 4,1988, the Comission is issuing a temporary exemption from the requirements of 10 CFR 50.54(w)(5)(i) until completion of the endin extending the irrplementation date specif.ied in 10 CFR 50.54(w)p(5)(1)g
                                                                                    , but not rulemaking
,            . later than April 1, 1989. Upon co.npletion of such rulemaking, the licensee shall comply with the provisions of such rule.
The Commission, sursuant to 10 CFR 50.12(a), hereby grants a tem exemption from t1e schedular requirements of 10 CFR 50.54(w)(5)(porary 1). This temporary exemption is valid until April 1,1989 or until such time as action              -
on this rulemaking is completed.
In granting the exemption, the staff has determined that this action is authorized 1            by law and will not endanger life or property or the common defense and security and is otherwise in the public interest, kM                                                    Y
 
Mr. Edward J. Hroczka                                                                                October 3,1988 A copy of this exernption is being filed with the Office of the Federal Register for publication.                                                                                                                                    ,
Sincerely, b
                                                                                  \
d Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects I/II
 
==Enclosure:==
As stated cc w/ enclosure:
See next page 9
k 1
I 1
k 1
5
      . - ~ ~ , . . . . , ,        ----- _ -. ..-    , _ _ - - , . . - . _ _ .
 
    ,                                                                  ~
              .Mr. Edward J. Mroczka Connecticut Yankee Atomic Power Company        Haddam Neck Plant ec:
Gerald Garfield, Esquire                      R. M. Kacich, Manager Day, Berry and Howard                          Generation Facilities Licensing Counselors at Law                              Northeast Utilities Service Company City Place                                    Post Office Box 270 Hartford, Connecticut 06103-3499              Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President                  D. O. Nordquist Naclear Operations                            Kanager of Quality Assurance Northeast Utilities Service Company            Northeast Nuclear Energy Company Post Office Box 270                            Post Office Box 270 Hartford, Connecticut 06141-0270              Hartford, Connecticut 06141-0270 Kesin McCarthy, Director                      Regional Administrator Radiation Control Unit                        Region I Department of Environmental Protection        U. S. Nuclear Regulatory Commission State Office Building                          475 Allendale Road Hartford, Connecticut 06106                    King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secretary            Board of Selectmen Energy Division                                Town Hall Office of Policy and Management                Haddam, Connecticut 06103 80 Washington Street Hartford, Connecticut 06106                    J. T. Shedlosky, Resident Inspector Haddam Neck Plant D. B. Miller, Station Superintendent          c/o U. S. Nuclear Regulatory Commission Haddam Neck Plant                              Post Office Box 116 Connecticut Yankee Atomic Power Co.Tpeny      East Haddam Post Office RFD 1. Post Office Box 127E                    East Haddam, Connecticut C6423 East Farpton, Connecticut 06424 G. H. Bouchard, Unit Superintendent Haddam Neck Plant RfD #1 Post Office Box 127E East Hamptnn, Connecticut 06424 i
i i
 
4 i
                .Mr. Edward J. Mrcczka                                                                October 3, 1988                      !
l A copy of this exemption is being filed with the Office of the Federal Register for publication.
Sincerely, D.H.Jaffee/for                                      i i                                                                                    Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects I/II
 
==Enclosure:==
As stated i                cc w/ enclosure:
See next page i                OISTRIBUTION i            eN',                                                                                                                            {
GPA/PA i'            *NRC &^ Local PDRs                                          ARM /LFMB                                                          f PDI-4 Rdg.                                                TBarnhart(4)                                                        '
TMurley/JSnieze k,12/G/18 DCrutchfield,12/G/18 CRossi, 11/E/4
;                SVarga,14/E/4
,                BBoger,14/A/2                                                                                                                  1 1
SNorris
.                AWang t
0GC (for info only)                                                                                                            !
EJordan 3302 HNBB BGrimes 9/A/2                                                                                                                  i ACRS(10)                                                                                                                      !
Gray File l
:PM:FD'
] 0FC :LA:PDI.4                                                                  :ADRl p ,g (:D:DRP:H -
  .....:...........:.....,                              .:!."3:PDI-4 3.......:.............          .....:............:...........          ,
iNAME:Sk8rris                    :AWang!
;.....:............:...........:......Q...,...:BBoger      :JSto14 g                                        i i
DATE :C) /@/88
:]/18/88                  :}/LT/88            :T/%f/88      .        8 OFFICIAL RECORD COPY 4
I l                                                                                                                                              !
l    . _ _ -
                  - _ - -- - -- - - . - _ - - - - - _ . _ . . - . . - - - -                                --.. - __ _ _-. _ __- - . ..}}

Revision as of 09:38, 17 December 2020

Forwards Temporary Exemption from Schedular Requirements of Property Insurance Rule 10CFR50.54(w)(5)(i),effective 881004
ML20155G080
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/03/1988
From: Wang A
Office of Nuclear Reactor Regulation
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20155G084 List:
References
NUDOCS 8810140073
Download: ML20155G080 (4)


Text

'

~

.. ~ .

pg ,og UNITED STATES E o NUCLEAR REGULATORY COMMISSION n -l W ASHING TON. D. C. 20655

  1. October 3, 1988 Docket No. 50-213 Mr. Edward .). Mroczka Senior Vice President Nuclear Engineering and Operations ConnecAicut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Mroczka:

SUBJECT:

HADDAM NECK PLANT - TEMPORARY EXEMPTION FROM THE SCHEDULAR REQUIREMdNTS OF THE PROPERTY INSURANCE RULE EFFECTIVE OCTOBER 4, 1988 (10CFR50.54(w)(5)(i))

The Commission has issued the enclosed temporary exemption from the schedular requirenats of the property insurance rule effective October 4, 1988 (10 CFR 50.54(w)(5)(i)) for the Haddam Neck Plant. This part of the rule requires licensees to obtain insurance policies that prioritize insurance proceeds for stabilization and deccatamination after an accident and provide for payment of proceeds to an independent trustee who would disburse funds for decontamination and cleanup before any other purpose. -

TheCommissionhasproposedarevisionof10CFR50.54(w)(5)(1) the implementation schedule for 18 months (53 FR 36338, September 19,extending).

1988 However, because it is unlikely that this rulemaking action will be completed by October 4,1988, the Comission is issuing a temporary exemption from the requirements of 10 CFR 50.54(w)(5)(i) until completion of the endin extending the irrplementation date specif.ied in 10 CFR 50.54(w)p(5)(1)g

, but not rulemaking

, . later than April 1, 1989. Upon co.npletion of such rulemaking, the licensee shall comply with the provisions of such rule.

The Commission, sursuant to 10 CFR 50.12(a), hereby grants a tem exemption from t1e schedular requirements of 10 CFR 50.54(w)(5)(porary 1). This temporary exemption is valid until April 1,1989 or until such time as action -

on this rulemaking is completed.

In granting the exemption, the staff has determined that this action is authorized 1 by law and will not endanger life or property or the common defense and security and is otherwise in the public interest, kM Y

Mr. Edward J. Hroczka October 3,1988 A copy of this exernption is being filed with the Office of the Federal Register for publication. ,

Sincerely, b

\

d Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects I/II

Enclosure:

As stated cc w/ enclosure:

See next page 9

k 1

I 1

k 1

5

. - ~ ~ , . . . . , , ----- _ -. ..- , _ _ - - , . . - . _ _ .

, ~

.Mr. Edward J. Mroczka Connecticut Yankee Atomic Power Company Haddam Neck Plant ec:

Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Naclear Operations Kanager of Quality Assurance Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kesin McCarthy, Director Regional Administrator Radiation Control Unit Region I Department of Environmental Protection U. S. Nuclear Regulatory Commission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secretary Board of Selectmen Energy Division Town Hall Office of Policy and Management Haddam, Connecticut 06103 80 Washington Street Hartford, Connecticut 06106 J. T. Shedlosky, Resident Inspector Haddam Neck Plant D. B. Miller, Station Superintendent c/o U. S. Nuclear Regulatory Commission Haddam Neck Plant Post Office Box 116 Connecticut Yankee Atomic Power Co.Tpeny East Haddam Post Office RFD 1. Post Office Box 127E East Haddam, Connecticut C6423 East Farpton, Connecticut 06424 G. H. Bouchard, Unit Superintendent Haddam Neck Plant RfD #1 Post Office Box 127E East Hamptnn, Connecticut 06424 i

i i

4 i

.Mr. Edward J. Mrcczka October 3, 1988  !

l A copy of this exemption is being filed with the Office of the Federal Register for publication.

Sincerely, D.H.Jaffee/for i i Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects I/II

Enclosure:

As stated i cc w/ enclosure:

See next page i OISTRIBUTION i eN', {

GPA/PA i' *NRC &^ Local PDRs ARM /LFMB f PDI-4 Rdg. TBarnhart(4) '

TMurley/JSnieze k,12/G/18 DCrutchfield,12/G/18 CRossi, 11/E/4

SVarga,14/E/4

, BBoger,14/A/2 1 1

SNorris

. AWang t

0GC (for info only)  !

EJordan 3302 HNBB BGrimes 9/A/2 i ACRS(10)  !

Gray File l

PM:FD'

] 0FC :LA:PDI.4 :ADRl p ,g (:D:DRP:H -

.....:...........:....., .:!."3:PDI-4 3.......:............. .....:............:........... ,

iNAME:Sk8rris :AWang!

.....
............:...........:......Q...,...:BBoger :JSto14 g i i

DATE :C) /@/88

]/18/88  :}/LT/88 :T/%f/88 . 8 OFFICIAL RECORD COPY 4

I l  !

l . _ _ -

- _ - -- - -- - - . - _ - - - - - _ . _ . . - . . - - - - --.. - __ _ _-. _ __- - . ..