ML20069D926: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:p
                                                                                                            ^
[,                              a So. itg3                gyg
%    ,                                                                50- WO UNION EuccTmc COMPANY CALLAWAY PLANT
                                                                              "^" WG ADDRESS:
February 28 i  @VWJIPAL STAFW p.mox emo FULT  J N. MO. 6 5 2 51 0/RA    SCS      i Mr. W. L. Axelson                            A/RA    PA0 NRC Region III                              GPRP    SLO 799 Roosevelt.Rd.                  ,
ORNA_  RC Glen Ellyn, IL 60137 p 7 / ,/ sfUiSF CEP
 
==Dear Mr. Axelson:==
KL
                                                                .0L      FILE yH This is a follow-up to our phone conversation of February 24, 1983.
{!                          The.10 and 50 mile EPZ maps supplied by your
;                  office have the Callaway Plant incorrectly located, l                  The plant is shown on the maps 1 - 1 miles West of where it should be.
The error probably occurred by using an incor-rect longitude given in the Callaway FSAR Site Adden-dum (2.1.1.1 Specification of Location) for the mid-point of two reactors.
The correct location for the midpoint should be 38*-45'-42.3" latitude and 91*-46'-52.4" longitude.
This correction will be incorporated in FSAR Revision 5, 2/83.
Since 1 - 1 miles is significant within the 10 mile EPZ and those maps were issued to FEMA, SEMA and NRC Incident Response Centers in Washington and Glen Ellyn, they should be corrected.
If you should have further questions, please call (314) 676-8261.
Very truly yours, JL( lJU
              .                                  Al White Supervisor, Emergency Preparedness AEW/dch                                                                        ,
cc:  A. C. Passwater 8303210102 830228 PDR ADOCK 05000483 F              PDR                                                                  VAR 0 7 1983 1.2: M l}}

Revision as of 22:31, 7 August 2020

Discusses 830224 Telcon Re Incorrect Location of Plant on 10 & 50 Mile Emergency Planning Zone Maps.Error Probably Due to Incorrect Longitude Given in Plant FSAR Site Addendum
ML20069D926
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 02/28/1983
From: White A
UNION ELECTRIC CO.
To: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8303210102
Download: ML20069D926 (1)


Text

p

^

[, a So. itg3 gyg

% , 50- WO UNION EuccTmc COMPANY CALLAWAY PLANT

"^" WG ADDRESS:

February 28 i @VWJIPAL STAFW p.mox emo FULT J N. MO. 6 5 2 51 0/RA SCS i Mr. W. L. Axelson A/RA PA0 NRC Region III GPRP SLO 799 Roosevelt.Rd. ,

ORNA_ RC Glen Ellyn, IL 60137 p 7 / ,/ sfUiSF CEP

Dear Mr. Axelson:

KL

.0L FILE yH This is a follow-up to our phone conversation of February 24, 1983.

{! The.10 and 50 mile EPZ maps supplied by your

office have the Callaway Plant incorrectly located, l The plant is shown on the maps 1 - 1 miles West of where it should be.

The error probably occurred by using an incor-rect longitude given in the Callaway FSAR Site Adden-dum (2.1.1.1 Specification of Location) for the mid-point of two reactors.

The correct location for the midpoint should be 38*-45'-42.3" latitude and 91*-46'-52.4" longitude.

This correction will be incorporated in FSAR Revision 5, 2/83.

Since 1 - 1 miles is significant within the 10 mile EPZ and those maps were issued to FEMA, SEMA and NRC Incident Response Centers in Washington and Glen Ellyn, they should be corrected.

If you should have further questions, please call (314) 676-8261.

Very truly yours, JL( lJU

. Al White Supervisor, Emergency Preparedness AEW/dch ,

cc: A. C. Passwater 8303210102 830228 PDR ADOCK 05000483 F PDR VAR 0 7 1983 1.2: M l