ML20065T862: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. . _ _ _ . . _ _ - -                  __                . _ _        ._
{{#Wiki_filter:}}
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION              ,
MONTHLY OPERATING REPORT MONTH    OCTOBER      YEAR 1981 (Revised 12-03-81)
                                                                                              -f
                                                                                              \
f 1
APPROVED:
J l
l J
STATION MANAGER      /
                                                                                        '.            l l
l                                      T 8211030166 811218              '
DR ADDCK 05000338 PDR
 
_ . _ . - . - - . . _ . _ . _ . _ . .                  . _ , . _ . _  .m            .
OPERATING DATA REPORT DOCKET NO. 50-339 DATE      12-03-81 COMPLETED BY      L.L. Rogers      _
TELEPHONE (703) 894-5151 X2510 OPERATING STATUS                                                                                  i Notes
* Reflects corrected
: 1.      Unit Name:                    North Anna 2                                      number of hours            i
: 2.      Reporting Period:          October 1981 (Revised 12-03-81)                      generator on line.          l
: 3.      Licensed Thermal Power (MWt):                          2775
: 4.      Nameplate Rating (Gross MWe):                          947
: 5.      Design Electrical Rating (Net MWe):                    907
: 6.      Maximum Dependable Capacity (Gross NWe):                939
: 7.      Maximum Dependable Capacity (Net HWe):                  890
: 8.        If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons l Corrects re-evaluation of auxiliary load consumption dated May 1981.
l
: 9.      Power Level To Which Restricted, If Any (Net NWe):                                  N/A                    1
: 10. Reasons For Restrictions, If Any:                                                      N/A                    l l
6el h                  it4 0 M r 9/ ~ 3 9 0
This Month        Yr.-to-Date        Cumulative      ,
: 11.        Hours In Reporting Period                                  745            7,296                7,728    i
: 12.        Number of Hours Reactor Was Critical                      733.2          5,524.3              5,953.2  l
: 13. Reactor Reserve Shutdown Hours                          7/3, .4    17m1          1.358.5_            1,638.5
: 14.        Hours Generator On-Line                    Ok        (*?!; 23        d5,362.M            ,*5,775 >    !
: 15.        Unit Reserve Shutdown Hours                88 4              0              0                . 0
: 16.        Gross Thermal Energy Generated (MWH)              1,898,994          13,802,996          14,889,993
: 17.        Gross Electrical Energy Generated (MWH)              643,948          4,653,876          5,022,307
: 18.        Net Electrical Energy Generated (MWH)                611,338          4,402,998          4,752,642
: 19.        Unit Service Factor                                      *95.7            *73.5                *74.7
: 20. Unit Availability Factor                                          *95.7          *73.5                *74.7  ;
: 21. Unit Capacity Factor (Using MDC Net)                                92.2            67.8                  69.1  !
: 22. Unit Capacity Factor (Using DER Net)                                90.5            66.5                  67.8  '
: 23. Unit Forced Outage Rate                                            *4.3          *23.3                *22.2
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
1 Refueling Outane 05-82 thru 05-14-82 l
: 25.        If Shut Down At End Of Report Period, Estimated Date of Startup:                          N/A
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast
                                                                                                        \. Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
* corrects duratica of shutdown 81-38' j
Page 1 of 2 I
i                                                UNIT SHUTDOWNS AND POWER REDUCTIONS                                              DOCKET NO.                      50-339 UNIT NAME                      North Anna 2 DATE        12-03-81 REPORT MONTH    OCTOBER    (Revised)                            COMPLETED BY                              L. L. ROGERS TELEPHONE                (703) 894-5151 X2510 2                                              Component              Cause & Corrective No. Date        Typel Duration Reason        Method of    Licensee      System (Hours)            Shutting      Event        Code                Code                                        Action to 3                            4            5 Down Reactor Report #                                              Prevent Recurrence 81-37 811001      F          N/A    F            5          N/A                N/A              N/A              Reduced load to 90% due to "B" Transformer hi alarm and No. 4
                                                                                                                ,              governor valve cycling.
81-38 811003      F        *26.8  *A            3          N/A                  N/A            N/                Reactor trip due to ENC line rupture on No.4 governor.
ld M
                  ^
                          ,(                                                                                                  Closed No. 4 governor valve and Mk -
installed new supports l.
81-39 811004      F        5.0  . A            3          N/A                  N/A          N/A                  Reactor Trip due to generator leads differential.
Reduced load to 91% due to "B" 81-40 811005      F        N/A    F            5          N/A                    N/A          N/A Transformer hi temperature i                                                                                                                                  alarm.
!          81-41 811006      F        N/A    F            5          N/A                    N/A          N/A              ' Reduced load to 90% due to "B" Transformer hi temperature alarm.
;                        /
1          1                  2                                            3                                      4 F: Forced        Reason:                                      Method:                                Exhibit F - Instructions 8: Scheduled A-Equipment Failure (Explain)                    1-Manual                                for Preparation of Data i                            B-Maintenance or Test                        2-Maiinh1 Scram.                        Entry Sheets for Licensee C-Refueling                                  3-Automatic Scram                      Event Report (LER) File l
D-Regulatory Restriction                      4-Continuations                        (NUREG-0161)
  ;                            E-Operator Training & License Examination 5-Load Reduction F-Administrative                              9-Other
  '                          G-Operational Error (Explain)
H-Other (Explain)                                                                    Exhibit H - Same Source
_ _ - - _      _ _      __            _ _ _ _ _ _ _ _ _ _ _ _ _        _}}

Revision as of 09:31, 30 March 2020

Corrected Monthly Operating Rept for Oct 1981
ML20065T862
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/03/1981
From: Rogers L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20065T858 List:
References
NUDOCS 8211030166
Download: ML20065T862 (3)


Text