Line 2: |
Line 2: |
| | number = ML070680249 | | | number = ML070680249 |
| | issue date = 03/09/2007 | | | issue date = 03/09/2007 |
| | title = License and Technical Specification Pages - Amendment Nos. 229 and 271 Technical Specifications, Emergency Cooling Pond Inspection and Inventory Requirements (TAC Nos. MC8768 and MC8769) | | | title = License and Technical Specification Pages - Amendment Nos. 229 and 271 Technical Specifications, Emergency Cooling Pond Inspection and Inventory Requirements |
| | author name = Saba F | | | author name = Saba F |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLIV | | | author affiliation = NRC/NRR/ADRO/DORL/LPLIV |
Letter Sequence Other |
---|
|
|
MONTHYEARML0706802492007-03-0909 March 2007 License and Technical Specification Pages - Amendment Nos. 229 and 271 Technical Specifications, Emergency Cooling Pond Inspection and Inventory Requirements Project stage: Other ML0629103272007-03-0909 March 2007 Issuance of Amendment Nos. 229 and 271 Technical Specifications, Emergency Cooling Pond Inspection and Inventory Requirements Project stage: Approval 2007-03-09
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21208A4492021-09-20020 September 2021 Issuance of Amendment No. 325 Revise Loss of Voltage Relay Allowable Values and Number of Degraded Voltage Channels ML21088A4332021-04-14014 April 2021 Issuance of Amendment No. 324 Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21027A4282021-03-23023 March 2021 Issuance of Amendment No. 272 Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent 1CAN022102, Supplement Related to License Amendment Request to Replace the Reactor Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate2021-02-22022 February 2021 Supplement Related to License Amendment Request to Replace the Reactor Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate ML20160A1472020-06-30030 June 2020 Issuance of Amendment No. 270 to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20135H1412020-06-30030 June 2020 Issuance of Amendment Nos. 269 and 321 Request to Incorporate the Tornado Missile Risk Evaluator Into the Licensing Basis ML19232A3792019-09-19019 September 2019 Correction to Issuance of Amendment No. 264 Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML17251A2112017-10-10010 October 2017 Issuance of Amendment No. 307 Revision of Steam Generator Technical Specifications to Reflect Adoption of Technical Specifications Task Force Traveler TSTF-510 (CAC MF9654; EPID L-2017-LLA-0222) ML16165A4232017-03-10010 March 2017 Issuance of Amendment No. 257 Adoption of Technical Specifications Task Force Traveler TSTF-545, Revision 3, ML16027A1092016-02-24024 February 2016 Issuance of Amendment Nos. 255 and 303 Cyber Security Plan Implementation Schedule (CAC Nos. MF6258 and MF6259) ML15096A3812015-04-29029 April 2015 Issuance of Amendment No. 302, Revise Technical Specification Surveillance Requirement 4.1.3.1.2 Note to Eliminate Movement of Control Element Assembly 18 for Remainder of Operating Cycle 24 ML15068A3192015-03-31031 March 2015 Issuance of Amendment No. 301, Request to Adopt Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) ML15023A1472015-03-0303 March 2015 Issuance of Amendment No. 253, Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441) ML14356A2272015-02-18018 February 2015 Issuance of Amendment No. 300, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML15014A0712015-02-0303 February 2015 Issuance of Amendment No. 252, Request to Revise Technical Specification 5.5.16, Reactor Building Leakage Rate Testing Program, to Extend Type a Test Frequency to 15 Years ML14350B2852015-01-22022 January 2015 Issuance of Amendment No. 299, Revise Technical Specification 6.5.16, Containment Leakage Rate Testing Program, for Requirements for Containment Building Emergency Escape Air Lock Doors ML14254A1332014-11-24024 November 2014 Issuance of Amendment No. 250, Adoption of Technical Specifications Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 1CAN111401, Arkansas Nuclear One, Unit 1, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2014-11-21021 November 2014 Arkansas Nuclear One, Unit 1, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits 1CAN111401, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2014-11-21021 November 2014 License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits 1CAN101407, Clarifications to Response to Request for Additional Information Associated with Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-10-28028 October 2014 Clarifications to Response to Request for Additional Information Associated with Technical Specification Change to Extend the Type a Test Frequency to 15 Years 1CAN031401, License Amendment Request - Revised Pages Extend the Type a Test Frequency to 15 Years2014-03-11011 March 2014 License Amendment Request - Revised Pages Extend the Type a Test Frequency to 15 Years 1CAN121302, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2013-12-20020 December 2013 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years 1CAN081302, Response to Request for Additional Information, Adoption of Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360.2013-08-28028 August 2013 Response to Request for Additional Information, Adoption of Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360. 2CAN061302, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712013-06-18018 June 2013 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 1CAN061301, License Amendment Request, Revision to Technical Specification 2.1.1.1 Reactor Core Safety Limits2013-06-11011 June 2013 License Amendment Request, Revision to Technical Specification 2.1.1.1 Reactor Core Safety Limits 2CAN011301, License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-3602013-01-28028 January 2013 License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-360 1CAN011304, License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-360.2013-01-28028 January 2013 License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-360. CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications 1CAN061201, License Amendment Request Technical Specification Change Associated with Main Feedwater Valves2012-06-19019 June 2012 License Amendment Request Technical Specification Change Associated with Main Feedwater Valves 1CAN081001, License Amendment Request, Technical Specification Change Associated with Main Feedwater Isolation Valves2010-08-24024 August 2010 License Amendment Request, Technical Specification Change Associated with Main Feedwater Isolation Valves 2CAN051001, Response to Request for Additional Information Associated with Core Operating Limits Report References2010-05-17017 May 2010 Response to Request for Additional Information Associated with Core Operating Limits Report References 1CAN021004, Response to Request for Additional Information, Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2010-02-28028 February 2010 Response to Request for Additional Information, Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. ML0931305282009-12-23023 December 2009 License Amendment No. 241, Modified Technical Specification 3.4.9, Pressurizer, to Delete Low Pressurizer Level Limit ML0930601322009-12-23023 December 2009 License Amendment No. 240, Revised Administrative Changes to Technical Specification 5.5.8, Inservice Testing Program, to Adopt TSTF-479-A and TSTF-497-A 1CAN080901, Changes to Reflect Revision to 10 CFR 50.55a Technical Change Travelers - TSTF-479-A and TSTF-497-A2009-08-0505 August 2009 Changes to Reflect Revision to 10 CFR 50.55a Technical Change Travelers - TSTF-479-A and TSTF-497-A 2CAN030901, License Amendment Request, Technical Specification Change to Modify the Mode of Applicability for Emergency Feedwater Actuation Signal2009-03-0202 March 2009 License Amendment Request, Technical Specification Change to Modify the Mode of Applicability for Emergency Feedwater Actuation Signal 1CAN020901, License Amendment Request, Technical Specification Change to Adopt Low Pressure Air Lock Seal Test2009-02-16016 February 2009 License Amendment Request, Technical Specification Change to Adopt Low Pressure Air Lock Seal Test ML0814000372008-09-0808 September 2008 Technical Specifications for Amendment No. 282 Technical Specification Task Force TSTF-490, Rev 0, Deletion of E Bar Definition and Revision to RCS Specific Activity. ML0812203132008-08-28028 August 2008 Tech Spec Pages for Amendment No. 281 Technical Specification Task Force Change TSTF-359, Increased Flexibility in Mode Restraints. ML0823801472008-08-21021 August 2008 License Amendment Request, Technical Specification Change to Extend Integrated Leak Rate Test Interval One-Time ML0814004492008-07-23023 July 2008 Tech Spec Pages for Amendment No. 280 Reactor Coolant System Relocation to TRM (Tac MD8313) 1CAN070804, License Amendment Request Regarding Technical Specification Changes Associated with Adoption of TSTF-3592008-07-21021 July 2008 License Amendment Request Regarding Technical Specification Changes Associated with Adoption of TSTF-359 2CAN070805, License Amendment Request Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM2008-07-21021 July 2008 License Amendment Request Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM 2024-08-21
[Table view] |
Text
(4) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6) EOI, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
- c. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level EOI is authorized to operate the facility at steady state reactor core power levels not in excess of 2568 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 229, are hereby incorporated in the renewed license.
EOI shall operate the facility in accordance with the Technical Specifications.
(3) Safety Analysis Report The licensee's SAR supplement submitted pursuant to 10 CFR 54.21(d),
as revised on March 14, 2001, describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than May 20, 2014.
(4) Physical Protection EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, Renewed License No. DPR-51 Amendment No. 229
ECP 3.7.8 3.7 PLANT SYSTEMS 3.7.8 Emergency Cooling Pond (ECP)
LCO 3.7.8 The ECP shall be OPERABLE.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Degradation of the ECP A.1 Determine ECP remains 7 days noted pursuant to acceptable for continued SR 3.7.8.4 below or by operation.
other inspection.
B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.
B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR LCO not met for reasons other than Condition A.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1 Verify that the indicated water level of the ECP is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> greater than or equal to that required for an ECP volume of 70 acre-ft.
SR 3.7.8.2 ------------------- NOTE ----------------
Only required to be performed from June 1 through September 30.
Verify average water temperature is _<100 0 F. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ANO-1 3.7.8-1 Amendment No. 2-1-5, 229
ECP 3.7.8 SURVEILLANCE FREQUENCY SR 3.7.8.3 Perform soundings of the ECP to verify: 12 months
- 1. A contained water volume of ECP _>70 acre-feet, and
- 2. The minimum indicated water level needed to ensure a volume of 70 acre-feet is maintained.
SR 3.7.8.4 Perform visual inspection of the ECP to verify 12 months conformance with design requirements.
ANO-1 3.7.8-2 Amendment No. 21-5, 229
3 facility at the designated location in Pope County, Arkansas in accordance with the procedures and limitations set forth in this renewed license; (3) EOI, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time at the facility site and as designated solely for the facility, special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) EOI, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to conditions specified in the following Commission regulations in 10 CFR Chapter 1; Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level EOI is authorized to operate the facility at steady state reactor core power levels not in excess of 3026 megawatts thermal. Prior to attaining this power level EOI shall comply with the conditions in Paragraph 2.C.(3).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 271 are hereby incorporated in the renewed Renewed License No. NPF-6 Amendment No. 271
PLANT SYSTEMS 3/4.7.4 EMERGENCY COOLING POND LIMITING CONDITION FOR OPERATION 3.7.4.1 The emergency cooling pond (ECP) shall be OPERABLE with:
- a. A minimum contained water volume of 70 acre-feet.
- b. An average water temperature of _<100°F.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
- a. With the volume and/or temperature requirements of the above specification not satisfied or, with the requirements of Action b not met, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- b. If degradation is noted pursuant to 4.7.4.1 .d below or by other inspection, perform an evaluation to determine that the ECP remains acceptable for continued operation within 7 days.
SURVEILLANCE REQUIREMENTS 4.7.4.1 The ECP shall be determined OPERABLE:
- a. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying that the indicated water level of the ECP is greater than or equal to that required for an ECP volume of 70 acre-feet.
- b. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during the period of June 1 through September 30 by verifying that the pond's average water temperature at the point of discharge from the pond is within its limit.
- c. At least once per 12 months by making soundings of the pond and verifying:
- 1. A contained water volume of ECP Ž_70 acre-feet, and
- 2. The minimum indicated water level needed to ensure a volume of 70 acre-feet is maintained.
- d. At least once per 12 months by performance of a visual inspection of the ECP to verify conformance with design requirements.
ARKANSAS - UNIT 2 3/4 7-16 Amendment No. 41-, 271