These limits apply to operation with vessel dome pressure within +/- 1O psi of nominal pressure, as defined by the Region I pressure band shown in Figure 5-1. With all equipment in service or with the EOC-RPT system out of service, op_eration with vessel dome pressure down to 40 psi below nominal is licensed provided the additional restrictions identified in Section 5.0 are applied with the LHGR operating limit defined in this section.
These limits apply to operation with vessel dome pressure within +/- 1O psi of nominal pressure, as defined by the Region I pressure band shown in Figure 5-1. With all equipment in service or with the EOC-RPT system out of service, op_eration with vessel dome pressure down to 40 psi below nominal is licensed provided the additional restrictions identified in Section 5.0 are applied with the LHGR operating limit defined in this section.
TABLE 4-1 LHGR Limits versus Peak Pellet Exposure GE14C GNF2
TABLE 4-1 LHGR Limits versus Peak Pellet Exposure GE14C GNF2
                                                                                             ]]
                                                                                             ))
(EOL = End of Life (maximum licensed pellet exposure) 39
(EOL = End of Life (maximum licensed pellet exposure) 39


Line 656: Line 656:


Plant Hatch                                          Core Operating Limits Report Unit 1 Cycle 29          Non-Proprietary Information                  Version 1.0
Plant Hatch                                          Core Operating Limits Report Unit 1 Cycle 29          Non-Proprietary Information                  Version 1.0
[[
((
                                                                                 ]]
                                                                                 ))
FIGURE 4-3A GE14C LHGR Limit versus Peak Pellet Exposure 45
FIGURE 4-3A GE14C LHGR Limit versus Peak Pellet Exposure 45


Plant Hatch                                          Core Operating Limits Report Unit 1 Cycle 29          Non-Proprietary Information                  Version 1.0
Plant Hatch                                          Core Operating Limits Report Unit 1 Cycle 29          Non-Proprietary Information                  Version 1.0
[[
((
                                                                                 ]]
                                                                                 ))
FIGURE 4-38 GNF2 LHGR Limit versus Peak Pellet Exposure 46
FIGURE 4-38 GNF2 LHGR Limit versus Peak Pellet Exposure 46



Latest revision as of 17:39, 17 March 2020

Enclosure 2 - Hatch Unit 1 Cycle 29 Core Operating Limits Report Version 1.0
ML18088A195
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/26/2018
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-18-0382
Download: ML18088A195 (53)


Text

Edwin I. Hatch Nuclear Plant - Unit 1 Unit 1 Cycle 29 Core Operating Limits Report Version 1.0 Enclosure 2 Unit 1 Cycle 29 Core Operating Limits Report Version 1.0 NON-PROPRIETARY INFORMATION

Non-Proprietary Information SOUTHERN NUCLEAR OPERATING COMPANY EDWIN I. HATCH NUCLEAR PLANT Unit 1 Cycle 29 CORE OPERATING LIMITS REPORT Version 1.0 Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35242

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 Edwin I. Hatch Nuclear Plant Unit 1 Cycle 29 Core Operating Limits Report TABLE OF CONTENTS Section Title Page 1.0 Introduction 7 2.0 APLHGR Limits 9 3.0 MCPR Operating Limits 13 4.0 LHGR Limits 39 5.0 Operating Pressure Limits 47 6.0 PBDA Amplitude Setpoint 51 7.0 References 52 2

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 TABLES Table No. Title Page 1-1 Main Turbine Bypass System Operability 7 1-2 Equipment Out of Service Limitations 8 3-1 ExposureDefin~ons 15 3-2 Power-Dependent MCPR Limit Operating Flexibility Options 16 3-3 Power-Dependent KP Multiplier Flexibility Options 16 3-4 Rated-:-Power MCPR Limit Operating Flexibility Options 17 4-1 LHGR Limits versus Peak Pellet Exposure 39 4-2 Flow-Dependent LHGR Limit Operating Flexibility Options 40 5-1 Pressure Dependent Operating Flexibility Options 48 5-2 Maximum Thermal Limit Ratios for Equipment In Service Operation 49 5-3 Maximum Thermal Limit Ratios for EOC-RPT Out of Service Operation 49 6-1 Licensed OPRM Amplitude Setpoint 51 3

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 FIGURES Figure No. Title Page 2-1A GE14C Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 10 2-18 GNF2 Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 11 2-2 APLHGR Limit Versus Average Planar Exposure 12 3-1 Flow-Dependent MCPR Limit (MCPRF) versus Core Flow 18 3-2A Power-Dependent MCPR Limit (MCPRp) versus Core Power 19 3-28 Power-Dependent MCPR Limit (MCPRp) versus Core Power (Main Turbine Bypass System Inoperable and/or Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 20 3-3A Power-Dependent MCPR Multiplier (KP) versus Core Power 21 3-38 Power-Dependent MCPR Multiplier (KP) versus Core Power (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 22 3-4A-1 TLO MCPR Limits versus Average SCRAM Time 23 3-4A-2 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 24 3-4A-3 TLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service) 2~

3-4A-4 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable & EOC-RPT Out of Service) 26 3-4A-5 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 27 4

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 Figure No. Title Page 3-4A-6 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable) 28 3-4A-7 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service) 29 3-4A-8 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable & EOC-RPT Out of Service) 30 3-48-1 SLO MCPR Limits versus Average SCRAM Time 31 3-48-2 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 32 3-48-3 SLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service) 33 3-48-4 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable & EOC-RPT Out of Service) 34 3-48-5 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 35 3-48-6 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable) 36 3-48-7 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service) 37 3-48-8 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable & EOC-RPT Out of Service) 38 5

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 Figure No. Title Page 4-1A GE14C Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 41 4-1B GNF2 Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 42 4-1C GNF2 Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow (Main Turbine Bypass System Inoperable) 43 4-2 Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power 44 4-3A GE14C LHGR Limit versus Peak Pellet Exposure 45 4-3B GNF2 LHGR Limit versus Peak Pellet Exposure 46 5-1 Licensed Regions of Operating Dome Pressure versus Core Power 50 6

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0

1.0 INTRODUCTION

The Core Operating Limits Report (COLR) for Plant Hatch Unit 1 Cycle 29 is prepared in accordance with the requirements of Technical Specification 5.6.5. The core operating limits presented herein were developed using NRG-approved methods (References 1 through 8).

Results from the reload analyses for the fuel in Unit 1 Cycle 29 are documented in References 2 through 4.

GNF2 fuel limits in this report are applicable to ARMOR and Ironclad Lead Test Assemblies (References 7 and 8).

The following core operating limits are included in this report:

a. Average Planar Linear Heat Generation Rate (APLHGR) - Technical Specification 3.2.1
b. Minimum Critical Power Ratio (MCPR) - Technical Specification 3.2.2
c. Linear Heat Generation Rate (LHGR) - Technical Specification 3.2.3 This report includes reduced thermal limit ratios which may be used in conjunction with the standard core operating limits to all<;>w operation with dome pressure down to 40 psi below nominal. Also included in this report is the licensed scram setpoint for the Period Based Detection Algorithm (PBDA) in the Oscillation Power Range Monitor (OPRM).

Based upon the reload analyses for this cycle, the following operability requirement is defined for Unit 1 operation.

TABLE 1-1 Main Turbine Bypass System Operability

" ', i ,"'*

' . ,, >;:, ";' .. ,* *bp~raliJ!ity Requife~~nt.

Main Turbine Bypass System Operable At least two bypass valves mµst be operable (Technical Specification 3.7.7) 7

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 From a fuel thermal limits perspective, the following limitations are placed on Unit 1 operation.

TABLE 1-2 Equipment Out of Service Limitations Equipment/ Condition Limitation Single-Loop Operation (SLO)

  • Core Power must be s 2000 MWth

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 2.0. APLHGR LIMITS (Technical Specification 3.2.1)

For both two loop operation (TLO) and single loop operation (SLO), the APLHGR limit for each six inch axial segment of each fuel assembly in the core is the applicable fuel-type-specific APLHGR limit in Figure 2-2 multiplied by the fuel-type-specific flow-dependent multiplier, MAPFACF, taken from either:

a. Figure 2.-1A for GE14C fuel
b. Figure 2-1 B for GNF2 fuel 9

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.00 I

I I

I TLO I i

~ 0.90 I

I TLC I I

I I

~ 0.86

.~

ii

.;::. 0.80
i

~

a::

(!)

I SLO I

i:

~ 0.70

<(

....C:

Cl>

"C C:

[ 0.60 Cl>

Cl

~

U:: o.50 0.40 30 40 50 60 70 80 90 100 110 161 Core Flow (% of Rated)

Flow SLO/TLO .MAPFACF 30.0 s F s 61.0 TLO 0.86 F > 61.0 TLO 1.00 F;:::: 30.0 SLO 0.80 F = Percent of Rated Core Flow FIGURE 2-1A GE14C Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 10

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.0 g I TLO I

~ 0.9

~

ii

~ 0.8

ii:

c:::

C!)

I SLO I

i:

ic( 0.7 1:Q)

"C C:

[ 0.6 Q)

C

~

u:::

0.5 0.4 30 40 50 60 70 80 90 100 110 Core Flow(% of Rated)

. *:Flow.* -:* .... sLo:nn.:o ,MAPFACF F;;: 30.0 TLO 1.00 F;;: 30.0 SLO 0.80 F = Percent of Rated Core Flow FIGURE 2-18 GNF2 Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 11

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 15.0

,Avera'ge

,  ;* ~ *, ,. ' ,

.;:GE149,,

Planar, *APLHGR

.' 14.0 Eiposure Limit; (GWd/ST) 0.00

.(kW/ft) 12.82 13.0

'N'"

~

I GNF2 I 14.51 12.82 12.0 - j GE14C :

19.13 12.82 ~

57.61 8.00 11.0

~

63.50 5.00 g

[.. 10.0

,Av~r~ge GNF2 *** .E ~

Planar

' '\

APLHGR *

';, ~,

i 9.0 ~

'~

' .,~ 0::

C)

'Exposure Limit J:

...J ~

(GWd/ST) ,'(kW/ft)* ll. 8.0 0.00 13.78

<(

~~

7.0 17.15 13.78 60.78 63.50 6.87 5.50 6.0

\

5.0 4.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 Average Planar Exposure (GWd/ST) 50.0 55.0 '

60.0 65.0 FIGURE 2-2 APLHGR Limit Versus Average Planar Exposure 12

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 3.0 MCPR OPERATING LIMITS (Technical Specification 3.2.2)

The MCPR operating limits (OLMCPRs) for each fuel type are a function of core power, core flow, average scram time, number of operating recirculation loops, EOC-RPT system status, operability of the main turbine bypass system, the status of the main turbine pressure regulator system, and cycle exposure. Cycle exposures are defined in Table 3-1.

The OLMCPRs for both two loop operation (TLO) and single loop operation (SLO) are determined as follows:

a. For 24% ::; core power::; 45%, the greater of either:
1) The flow-dependent MCPR limit, MCPRF, as determined by Figure 3-1,
2) The power-dependent MCPR limit, MCPRP, as determined by Table 3-2.
b. For core power> 45%, the greater of either:
1) MCPRF, as determined by Figure 3-1 OR
2) The product of the power-dependent multiplier, KP, as determined by Table 3-3, and the rated-power OLMCPR, as determined by Table 3-4.

These limits apply to all operating conditions with normal feedwater temperature, as well as with feedwater temperature reduction.

These limits apply to operation with vessel dome pressure within +/- 10 psi of nominal. pressure, as defined by the Region I pressure band shown in Figure 5-1. With all equipment in service or with the EOC-RPT system out of service, operation with vessel dome pressure down to 40 psi below nominal is licensed provided the additional restrictions identified in Section 5.0 are applied with the MCPR operating limit defined in this section.

13

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 In the 3-4A and 3-48 figures, Option A scram time OLMCPRs correspond to T = 1.0, where T is determined from scram time measurements performed in accordance with Technical Specifications Surveillance Requirements 3.1.4.1 and 3.1.4.2. Option B values correspond to T = 0.0. For scram times between Option A and Option B, the rated-power OLMCPR corresponds to T. If T has not been determined, Option A limits must be used.

The average scram time of the control rods, T, is defined as:

Tave -TB

= 0, OR , whichever is greater.

where: TA = 1.08 sec (Technical Specification 3.1.4, Table 3.1.4-1, scram time limit to notch 36).

I 2

N, TB = µ+ 1.65* cr* n LNi i=l where: µ = 0.822 sec (mean scram time used in the transient analysis).

cr = 0.018 sec (standard deviation ofµ).

NI = total number of active rods measured in Technical Specifications Surveillance Requirement 3.1.4.1.

n = number of surveillance tests performed to date in the cycle.

Ni = number of active control rods measured in the i1h surveillance test.

n 2::NiTi i=I

!ave = n LNi i=I where: Ti = average scram time to notch 36 of all rods in the i1h surveillance test.

14

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 TABLE 3-1 Exposure Definitions

. ' /

! ~** .,, ~. ,,, '

.. . {

, ')

',J c'>.**>* *.'.( *.*

i

': Exposure Label

' . Definition . Cycle Exposure BOC Beginning of Cycle Exposure 0 MWd/ST MOC1 First Middle of Cycle Exposure EOR - 6500 MWd/ST Second Middle of Cycle MOC2 EOR - 4000 MWd/ST Exposure, Projected exposure at end of rated power with all control rods

  • EOR End of Rated Exposure out, rated core flow, and rated feedwater temperature EOC End of Cycle Exposure Exposure at cycle shutdown 15

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 TABLE 3-2 Power-Dependent MCPR Limit Operating Flexibility Options MCPR~ from 2: 24% fo'~'45% of,Rated ~ore Power ,.* '

Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine Figure#

System ByQ.ass System Pressure Regulator In Service 012.erable* System Status Yes/No Yes TLCO 3.3.13.a or b 3-2A Yes/No No TLCO 3.3.13.a or b 3-28 Yes/No Yes/No TLCO 3.3.13.c 3-28 TABLE 3-3 Power-Dependent KP iytultiplier Flexibility Options J,,_,,

.. *}t :J

.45o/o:ofRat~d ,C:OrtfF?ower **,:.::, :'.:: ?, 1 Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine Figure# System By12.ass System Pressure Regulator In Service OQ.erable* System Status Yes/No Yes/No TLCO 3.3.13.a or b 3-3A Yes/No Yes/No TLCO 3.3.13.c 3-38

  • At least two bypass valves must be operable 16

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 TABLE 3-4 Rated-Power MCPR Limit Operating Flexibility Options Rated-power OLMCPRs Figure# Equipment In/Out of Service TLO SLO Equipment In Service 3-4A-1 3-48-1 Main Turbine Bypass System Inoperable 3-4A-2 3-48-2 EOC-RPT Out of Service 3-4A-3 3-48-3 Main Turbine Bypass AND EOC-RPT Out of Service 3-4A-4 3-48-4 System Inoperable Main Turbine Pressure Regulator System Status 3-4A-5 3-48-5 in TLCO 3.3.13.c Main Turbine Bypass 3-4A-6 3-48-6 System Inoperable Main Turbine Pressure EOC-RPT Out of Service 3-4A-7 3-48-7 Regulator System Status AND in TLCO 3.3.13.c Main Turbine Bypass System Inoperable 3-4A-8 3-48-8 AND EOC-RPT Out of Service 17 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.6 u 'u: IX a. ~ .....E

J 1.4 1.5

" ~~ ~ '~ IX a. u

il:

....C G> "C C 1.3 G> ~ C. G> C ~ 0 U: 1.2 1.1 30 40 50 60 70 80 90 100 110 Core Flow (% of Rated) MCPRF(TLO) = A+ B*F MCPRF(SLO) = MCPRF(TLO) + 0.04 Flow A 8 30.0:,; F:,; 80.2 1.7287 -0.00597 80.2 < F:,; 110.0 1.2500 0.00000 F = Percent of Rated Core Flow FIGURE 3-1 Flow-Dependent MCPR Limit (MCPRF) versus Core Flow 18 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 2.8 I ~ 60% Flow I 2.6 ~ 0:: ~ 2.4 ~ .E

J

~ 2.2 ........ I .. I ~60% Flow (.)

'iii I < 60% Flow I C:

a, 'C !il 2.0 C C. a, ~ D. 1.8 I < 60% Flow I 1.6 24 26 28 30 32 34 36 38 40 42 44 45 Core Power(% of Rated) MCPRp(TLO) = A + B*P MCPRp(SLO) = MCPRp(TLO) + 0.04 Flow Power A B F ~ 60.0 24.0 s P s 28.0 3.3900 -0.03000 F ~ 60.0 28.0 < P s 45.0 2.5224 -0.01294 F < 60.0 24.0 s P s 28.0 2.1900 0.00000 F < 60.0 28.0 < P s 45.0 2.0153 -0.00412 P = Percent of Rated Core Power F = Percent of Rated Core Flow FIGURE 3-2A Power-Dependent MCPR Limit (MCPRP) versus Core Power 19 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 2.8 J :::60% Flow I 2.6 ~ 'J ~ 2.4 ~ .....E

i ~ r--,....__

8: (.) a.... C GI 2.2 I < 60% Flow I - I  :::60% Flow I 'C § 2.0 C. GI C I

o. 1.8 I < 60% Flow I 1.6 24 26 28 30 32 34 36 38 40 42 44 45 Core Power(% of Rated)

MCPRp(TLO) = A+ B*P MCPRp(SLO) = MCPRp{TLO) + 0.04 -: \' J:f1ow/" :. "

c,,i /q, 1 ;\;#"-"<

. * "'"" ..:;*;,.t < ,, ', a Rower';*:.:,; ;:£;:'.~ li/:;;*:,A,,'y}. i;::; : .* '?'t: F ~ 60.0 24.0 s P s 28.0 3.3900. -0.03000 F ~ 60.0 28.0 < P s 45.0 2.5224 -0.01294 F < 60.0 24.0 s P s 28.0 3.1000 -0.03250 F < 60.0 28.0 < P s 45.0 2.0153 -0.00412 P = Percent of Rated Core Power F = Percent of Rated Core Flow FIGURE 3-28 Power-Dependent MCPR Limit (MCPRP) versus Core Power (Main Turbine Bypass System Inoperable and/or Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 20 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.30 1.25 ~ 'ic ~ -~ 1.20 ~

i
l:

a: ~ 1.15

l:

C: a, 'C C C: a, C.1.10 a, ~ D. 1.05 ' i"i,,,.,, 1.00 45 Kp =A+ B*P 50 55 60 65 70 75 Core Power (% of Rated) 80 85 90 95 100 . Rower *. ,., *A B 45.0 < P :5 60.0 1.6700 -0.00867 60.0 < P :5 85.0 1.3708 -0.00368 85.0 < P :5 100.0 1.3867 -0.00387 P = Percent of Rated Core Power Power-Dependent MCPR Multiplier (KP) versus Core Power 21 Plant Hatch Core Operating Limits Report . Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.30 ~ ~ 1.25 -~ 1.20 I "' " ~ ~

i
iil ~

0:: f5 1.15 ~

iil ~

C: Cl) ~ ' "~ "'C C: Cl) C.1.10 Cl) C I II.. 1.05 1.00 45 50 Kp =A+ B*P 55 60 65 70 75 Core Power (% of Rated) 80 85 90 95 100 45.0 < P s 60.0 1.5320 -0.00560 60.0 < P s 85.0 1.3808 -0.00308 85.0 < P s 100.0 1.7933 -0.00793 P = Percent of Rated Core Power FIGURE 3-38 Power-Dependent MCPR Multiplier (KP) versus Core Power (Main Turbine Pressure Regulator System Status in TLCO 3,3.13.c) 22 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 1.64 1.62 1.62 1.60 1.60 1.58 1.58 1.56 1.56 1.54 1.54 1.52 1.52 '§ I MOC2-EOC l_ '§ 1.50 1.50

J 1.48 1.48 :J a::

~ 1.46 a:: 1.46 ~ 2 2 1.44 1.44 I I MOC1 - MOC2 1.42 1.42 ~ 1.40 1.40 ~ 1.38 1.38 1.36 1.34 I BOC-MOC1 r 1.36 1.34 1.32 1.30 - a.a 0.3 0.5 0.8 1.0 1.32 1.30 't OLMCPR(TLO) . Exposure Range t= 0.0 t= 1:0 BOC- MOC1 1.31 1.39 MOC1 - MOC2 1.36 1.47 MOC2-EOC 1.38 1.49 FIGURE 3-4A-1 TLO MCPR Limits versus Average SCRAM Time 23 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 1.64 1.62 1.62 1.60 1.60 1.58 1.58 1.56 1.56 1.54 1.54 1.52 I MOC2-EOC I 1.52 111.so

J 1.48 a::

~ 1.46 ----- ~ i--- 1.50 11 1.48 :J a:: 1.46 ~ ------- f-

ilE 1.44 1.44 ::ilE 1 MOC1 -MOC2

~ 1.42 1.42 1.40 1.40 I 1.38 i--- I BOC-MOC1 f- 1.38 1.36 1.34 - 1.36 1.34 1.32 1.32 1.30 1.30 0.0 0.3 0.5 0.8 1.0 t *.. -.* * .,: ; , .Ol,.MCPR{i-LO); . * .?ts

  • . :,; =o:o *-. . . :.c =-~.o ;,~

BOC- MOC1 1.35 1.41 MOC1 - MOC2 1.37 1.48 MOC2-EOC 1.39 1.50 FIGURE 3-4A-2 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 24 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 1.64 1.62 1.62 1.60 1.60 1.58 1.56 ~ ------- ---- ~ 1.58 1.56 1.54 I MOC2-EOC 1.54 1.52 -- 1.52 ] 1.50

J 1.48

----- i--- 1.50 ] 1.48 :J 0:: ~ 1.46

!ii: 1.44 -------

-- ----- ------ I ------- MOC1 - MOC2 I 1.44 0:: 1.46 ~ a 1.42 _i.----- ------- 1.42 1.40 1.38 1.36 i--- ~ ------ -- ------ I BOC -MOC1 I 1.40 1.38 1.36 1.34 1.34 1.32 1.32 1.30 1.30 0.0 0.3 0.5 0.8 1.0 OLMCPR(TLO) Exposure Range t = 0.0 t = 1.0 BOC- MOC1 1.31 1.44 MOC1 - MOC2 1.36 1.49 MOC2-EOC 1.46 1.59 FIGURE 3-4A-3 TLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service) 25 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 I MOC2-EOC L 1.64 1.62 1.60 -- i...----- ------ 1.62 1.60 1.58 1.58 1.56 1.56 ~ 1.54 I MOC1 - MOC2 I 1.54 1.52 1.52 ~ 1.50 ~ ~ ------- 1.50 ~ ~

J 1.48 1.48 :J a: a:

~ 1.46 Z 1.44 ------ - ----- ---- --- 1.46 ~ 1.44 Z 1.42 1.40 1.38 1.36 I BOC-MOC1 I 1.42 1.40 1.38 1.36 ~ 1.34 1.34 1.32 1.32 1.30 1.30 0.0 0.3 0.5 0.8 1.0 Exposure Ran_ge .. OLMCPR(TLO) ** .. . -r = 0.0 -r'=1.0 BOC -MOC1 1.35 1.46 MOC1 - MOC2 1.38 1.52 MOC2-EOC 1.48 1.62 FIGURE 3-4A-4 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable & EOC-RPT Out of Service) 26 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 1.64 1.62 1.62 1.60 1.60 1.58 1.58 1.56 1.56 1.54 1.54 1.52 1.52 ~ 1.50 1.50 ~

J 1.48 0::

f; ~ 1.46 -- ------ ------ 1.48 1.46

J 0::

f; 1.44 1.44 2: 1.42 1.40 1.38 1.36 ------ - ~ I BOC-EOC I 1.42 1.40 1.38 1.36 1.34 1.34 1.32 1.32 1.30 1.30 0.0 0.3 0.5 0.8 1.0 . 't i .. OLIVIC:::PR(TLO) Exposure Range 't'= 0.0 I 't = 1.0 BOC-EOC 1.38 I 1.49 FIGURE 3-4A-5 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 27 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 1.64 1.62 1.62 1.60 1.60 1.58 1.58 1.56 1.56 1.54 1.54 1.52 1.52 I MOC2-EOC I 1.50 ~ ~ 1.50

i 1.48

~ 1.48 :::i 0:: & 1.46

iii: 1.44 1.42 ~-- ~ ~~

----- ~ I BOC-MOC2 I 1.46 0:: 1.44 :!!: 1.42 1.40 ~~ 1.40 1.38 ~ 1.38 1.36 1.36 1.34 1.34 1.32 1.32 1.30 1.30 a.a 0.3 0.5 0.8 1.0 t BOC-MOC2 1.38 1.49 MOC2-EOC 1.39 1.50 FIGURE 3-4A-6 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable) 28 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 1.64 1.62 1.62 1.60 1.60 1.58 1.56 ------1 ------- MOC2-EOC I 1.58 1.56 1.54 1.54 1.52 ~ ------ 1.52 ~ 1.50

i 1.48 0::

~ 1.46 I BOC-MOC2 ----I 1.50 ~ 1.48 :i 0:: 1.46 ~

!E 1.44 1.44
!!:

1.42 1.42 ~ 1.40 1.40 1.38 1.38 1.36 1.36 1.34 1.34 1.32 1.32 1.30 1.30 0.0 0.3 0.5 0.8 1.0 't OLMCPRcrLo) Exposure Range 't =0.0 't = 1.0 B0C-MOC2 1.38 1.49 MOC2-EOC 1.46 1.59 FIGURE 3-4A-7 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service) 29 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 I MOC2- EOC f- 1.64 1.62 1.62 1.60 1.60 1.58 1.58 1.56 ....--- 1.56 1.54 __........--- ---- I MOC1 - MOC2 r 1.54 1.52 1.52 ~ 1.50

J 1.48 0:: __........--- -- -----

1.50 ~ 1.48 :J 0:: ~ 1.46 1.46 ~

l!: 1.44 ~ 1.44 ::§:

1.42 -- - __........--- I BOC-MOC1 [_ 1.42 1.40 1.38 1.36 1.34 -- 1.40 1.38 1.36 1.34 1.32 1.32 1.30 1.30 0.0 0.3 0.5 0.8 1.0 OLMCPR1ri.01 Exposure Range = 't 0.0 = 't 1.0 BOC- MOC1 1.38 1.49 MOC1 - MOC2 1.38 1.52 MOC2-EOC 1.48 1.62 FIGURE 3-4A-8 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable & EOC-RPT Out of Service) 30 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 1.64 1.62 1.62 1.60 1.60 1.58 1.58 I 1.56 I MOC2-EOC f- 1.56 1.54 1.52 -- 1.54 1.52 l 1,50 1.sa I

J 1.48 1.48 :J 0:: 1 MOC1 -MOC2 I- 0::

~ 1.46 1.46 ~ 2 2 1.44 1.42 I BOC-MOC1 r 1.44 1.42 1.40 1.40 1.38 1.38 1.36 1.36 1.34 1.34 1.32 1.32 1.30 1.30 0.0 0.3 0.5 0.8 1.0 .*..*. OLMCPRisLOi t = 0.0 . . . t = 1.0 BOC - MOC1 1.45 1.45 MOC1 - MOC2 1.45 1.51 MOC2-EOC 1.45 1.53 FIGURE 3-48-1 SLO MCPR Limits versus Average SCRAM Time 31 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 1.64 1.62 1.62 1.60 1.60 1.58 1.58 1.56 I I . MOC2-EOC I- 1.56 1.54 1.54 1.52 1.52 ~ 1.50 1.50 ~

J 1.48 I MOC1 - MOC2 I 1.48 :J 0:: 0::

f_; 1.46 1.46 f_;

ii= 1.44 1.44 :.'3i:

I BOC-MOC1 r 1.42 1.42 1.40 1.40 1.38 1.38 1.36 1.36 1.34 1.34 1.32 1.32 1.30 1.30 0.0 0.3 0.5 0.8 1.0 't BOC- MOC1 1.45 MOC1 - MOC2 1.45 .1.52 MOC2-EOC 1.45 1.54 FIGURE 3-48-2 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 32 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 1.64 1.62 ------ ---- 1.62 1.60 1.60 1.58 I MOC2-EOC L 1.58 ~ 1.56 1.54 1.56 1.54 1.52 1.52 ~ 1.50

i 1.48 I MOC1 -MOC2 r 1.50 ~

1.48 :::i 0::: 0::: ~ 1.46 1.46 f; I BOC-MOC1 i- ~ 1.44 1.44 :i: 1.42 1.42 1.40 1.40 1.38 1.38 1.36 1.36 1.34 1.34 1.32 1.32 1.30 1.30 a.a 0.3 0.5 0.8 1.0 OLMCPffisLoJ . .. Exposur~ Rang'E! . . ... t = 0.0 t= 1:0:

  • BOC- MOC1 1.45 1.48 MOC1 -MOC2 1.45 1.53 MOC2-EOC 1.50 1.63 FIGURE 3-48-3 SLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service) 33

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 ---- -------r 1.64 1.62 1.62 I MOC2-EOC 1.60 ___. 1.60 1.58 1.58 1.56 1.56 '§ 1.54 1.52 .-- I MOC1 - MOC2 I-1.54 1.52 '§ 1.50 1.50

i 1.48 1.48 :::i 0::

!3 1.46 I BOC-MOC1 I 1.46 0:: !3 2 2 1.44 1.44 1.42 1.42 1.40 1.40 1.38 1.38 1.36 1.36 1.34 1.34 1.32 1.32 1.30 1.30 0.0 0.3 0.5 0.8 1.0 * ,,,- QLIVJCPR1sL01 " Expci~ure Range .* 't =0.0 't =1.0 BOC- MOC1 1.45 1.50 MOC1 - MOC2 1.45 1.56 MOC2-EOC 1.52 1.66 FIGURE 3-48-4 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable & EOC-RPT Out of Service) 34 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 1.64 1.62 1.62 1.60 1.60 1.58 1.58 1.56 1.56 1.54 1.52 - 1.54 1.52 ] 1.50

J 1.48 0::

I BOC-EOC r 1.50 ] 1.48 :J 0:: fj a 1.46 1.44 1.42 - 1.46 1.44 1.42 fj a 1.40 1.40 1.38 1.38 1.36 1.36 1.34 1.34 1.32 1.32 1.30 1.30 0.0 0.3 0.5 0.8 1.0 OLMCPR(SLO) Exposure Range t = 0.0 = I t 1.0 .. BOC-EOC 1.45 I 1.53 FIGURE 3-48-5 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 35 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 1.64 1.62 1.62 1.60 1.60 1.58 1.58 1.56 I MOC2-EOC I 1.56 1.54 1.52 - - 1.54 1.52 ~ 1.50 1.50 ~

i 1.48 I BOC-MOC2 I 1.48 :J a:: a::

~ 1.46 1.46 ~ 5 ........ 1.44 1.44 a 1.42 1.42 1.40 1.40 1.38 1.38 1.36 1.36 1.34 1.34 1.32 1.32 1.30 1.30 a.a 0.3 0.5 0.8 1.0 t

1t:f~F#f~ftt~ifie~?ri-._~? :'}:.:~~;:f;t~i>~~~:~t~t~~:~J!~~;

BOC - MOC2 1 .45 1.53 MOC2-EOC 1.45 1.54 FIGURE 3-48-6 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status ,n TLCO 3.3.13.c & Main Turbine Bypass System Inoperable) 36 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 1.64 1.62 1.60 ------- ---- 1.62 1.60 1.58 ------- I MOC2-EOC ~ 1.58 ~ ~ 1.56 1.56 1.54 - 1.54 1.52 ~ 1.50

J 1.48 ------- ----- I B0C-MOC2 I 1.52 1.50 ~

1.48 :J a:: a:: f_; 1.46 1.46 f_; 2 2 1.44 1.44 1.42 1.42 1.40 1.40 1.38 1.38 1.36 1.36 1.34 1.34 1.32 1.32 1.30 1.30 0.0 0.3 0.5 0.8 1.0 "C .. .. .. OLMCPR(stof r Exp.osureRang'e. *.,: = 0.0 1::=-fo BOC- MOC2 1.45 1.53 MOC2-EOC 1.50 1.63 FIGURE 3-48-7 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service) 37 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.66 1.66 1.64 _,,,,,,-- 1.64 1.62 1.62 I MOC2-EOC r 1.60 1.60 r 1.58 1.58 I MOC1 -MOC2 i 1.56 1.54 1.52 1.50 ------ ' ------== ~ i------ ----- - ------ I BOC-MOC1 I 1.56 1.54 1.52 1.50 i

J 1.48 1.48 :J tr: tr:

fj a 1.46 1.44 1.42 - 1.46 1.44 1.42 fj a 1.40 1.40 1.38 1.38 1.36 1.36 1.34 1.34 1.32 1.32 1.30 1.30 a.a 0.3 0,5 a.a 1.0 MOC1 -MOC2 1.45 1.56 MOC2-EOC 1.52 1.66 FIGURE 3-48-8 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass -System Inoperable & EOC-RPT Out of Service) 38 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 4.0 LHGR LIMITS (Technical Specification 3.2.3) For both two loop operation (TLO) and single loop operation (SLO), the LHGR operating limit for each six inch axial segment of each fuel rod in the core is the applicable rated-power, rated-flow LHGR limit taken from Table 4-1 multiplied by the smaller of either:

a. The flow-dependent multiplier,.LHGRFACF, as determined by Table 4-2, OR
b. The power-dependent multiplier, LHGRFACp, as determined by Figure 4-2.

Table 4-1 shows the exposure-dependent LHGR limits for all fuel types in the core, as a function of initial gadolinium concentration in a six inch segment of a fuel rod. For exposures between the values shown in Table 4-1, the LHGR limit is based on linear interpolation. For illustration purposes, Figures 4-3A and 4-38 show the LHGR limits for fuel segments with the lowest (U02) and highest (U02+Gd203) initial Gd concentrations. These limits apply to operation with vessel dome pressure within +/- 1O psi of nominal pressure, as defined by the Region I pressure band shown in Figure 5-1. With all equipment in service or with the EOC-RPT system out of service, op_eration with vessel dome pressure down to 40 psi below nominal is licensed provided the additional restrictions identified in Section 5.0 are applied with the LHGR operating limit defined in this section. TABLE 4-1 LHGR Limits versus Peak Pellet Exposure GE14C GNF2 )) (EOL = End of Life (maximum licensed pellet exposure) 39 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 TABLE 4-2 Flow-Dependent LHGR Limit Operating Flexibility Options ~** . LHGRFACF C .. *. Equipment In or Out of Service Fuel Type EOC-RPT Main Turbine Main Turbine Figure# S'f.stem B'f,Q.ass S'f_stem Pressure Regulator In Service OQ.erable* S'i,stem Status GE14C Yes/No Yes/No TLCO 3.3.13.a, b, ore 4-1A Yes/No Yes TLCO 3.3.13.a, b, or c 4-18 GNF2 Yes/No No TLCO 3.3.13.a, b, or c 4-1C

  • At least two bypass valves must be operable 40

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.0 I I V TLO 'ii: ~ 0.9 / u. a: (!)

I:

...J i 0.8 HlLolS~ / ~ 3 I SLO I

ii:

a: 0.7 ./ (!)

I:

...J /' i:Q) ~ 0.6 Q) C. Q) Cl 3: ~ 0.5 0.4 30 40 50 60 70 80 90 100 110 Core Flow(% of Rated) LHGRFACF= A+ B*F \:.' .:* ,; '.j Flow:;/. c . - ,, , ::1:rLO/SLO '. *A,-,'-****' *a .. 30.0 s; F s; 80.3 TLO 0.4574 0.006758 F > 80.3 TLO 1.0000 0.000000 30.0 s; F s; 50.7 SLO 0.4574 0.006758 F > 50.7 SLO 0.8000 0.000000 F = Percent of Rated Core Flow FIGURE 4-1A GE14C Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 41 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.0 I TLO IV i 0.9 / u.. 0:: / C)

c

...J i / TLrnso/ 0.8 i5.. "3 I I SLO I

l:

0:: 0.7 C) V

c

...J C: Cl) "g Cl) C. 0.6 V / Cl) C ~ £ 0.5 0.4 30 40 50 60 70 80 90 100 110 Core Flow (% of Rated) LHGRFACF =A+ B*F "Flow TLO/SLO "":: A* .B 30.0 s F s 50.0 TLO/SLO 0.2000 0.01190 50.0 < F s 80.0 TLO 0.4567 0.00677 80.0 < F s 90.0 TLO 0.9820 0.00020 F > 90.0 TLO 1.0000 0.00000 50.0 < F s 50.7 SLO 0.4567 0.00677 F > 50.7 SLO 0.8000 0.00000 F = Percent of Rated Core Flow FIGURE 4-18 GNF2 Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 42 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.0 i 0.9 I TLO I / V u. 0:: /' / (!)

c:

..J i 0.8 i

i
ii:

0:: 0.7 I I SLO I V (!)

c:

..J I TLO/SLO I C: Cl) ~ 0.6 Cl) V C. Cl) C § ii: 0.5 0.4 30 40 50 60 70 80 90 100 110 Core Flow (% of Rated) LHGRFACF= A+ B*F *Flow TLOISLO A B. 30.0 s F s 50.0 TLO/SLO 0.3800 0.00490 50.0 < F s 60.0 TLO/SLO -0.2100 0.01670 60.0 < F s 90.0 TLO 0.3900 0.00670 90.0 < F s 100.0 TLO 0.9300 0.00070 F>100.0 TLO 1.0000 0.00000 60.0 < F s 61.2 SLO 0.3900 0.00670 F > 61.2 SLO 0.8000 0.00000 F = Percent of Rated Core Flow FIGURE 4-1C GNF2 Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow (Main Turbine Bypass System Inoperable) 43 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 1.1 u 1.0 ci: / u... a: ~ / v_... (!) ~

r: 0.9 d.

.!l! ii

/

V ~ 0.8

a: /

a: / (!)

r:

_J 0.7 "ECII "C / """"" C CII C. CII C 0.6 ~ 3:0 n. I < 60% Flow I 0.5 I ~ I I ~ 60% Flow I 0.4 ~ ~ ~ ~ ~ << ~ ~ ~ ~ M ~ n n ~ ~ M ~ ~ 100 Core Power(% of Rated) LHGRFACp =A+ B*P Flow Power A *s F ~ 60 24.0 :,; P :,; 28.0 0.4000 0.00250 F < 60 24.0:,; P :,; 28.0 0.3400 0.00500 All 28.0 < P :,; 45.0 0.4774 0.00524 All 45.0 < P :,; 60.0 0.6320 0.00180 All 60.0 < P :,; 85.0 0.3032 0.00728 All 85.0 < P:,; 100.0 0.4800 0.00520 P = Percent of Rated Core Power F = Percent of Rated Core Flow FIGURE 4-2 Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power 44 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 (( )) FIGURE 4-3A GE14C LHGR Limit versus Peak Pellet Exposure 45 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 (( )) FIGURE 4-38 GNF2 LHGR Limit versus Peak Pellet Exposure 46 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information .Version 1.0 5.0 OPERATING PRESSURE LIMITS For both two loop operation (TLO) and single loop operation (SLO), reactor dome pressure must be maintained within the licensed pressure bands defined by Figure 5-1. For operation in each of these regions, the following restrictions apply:

a. For Region I operation:

The core operating limits from Sections 2.0 through 4.0 are applicable.

b. For Region II and Region Ill operation:
1) The OPRM System must be operable
2) The core operating limits from Section 2.0 are applicable
3) The MFLCPR and MFLPD thermal limit ratios must remain below the maximum values determined by Table 5-1.

The MFLCPR and MFLPD thermal limit ratios are defined in terms of the core operating limits defined in Section 3.0 and Section 4.0. The MFLCPR thermal limit ratio is the most limiting (maximum) value of the Fraction of Limiting Critical Power Ratio (FLCPR) in the core. The FLCPR is defined for each fuel assembly in the core as: MCPRumit FLCPR = Fuel Assembly Minimum Critical Power Ratio where: MCPRumit = MCPR operating limit defined in Section 3.0 47 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 The MFLPD thermal limit ratio is the most limiting (maximum) value of the Fraction of Limiting Power Density (FLPD) in the core. The FLPD is defined for each six inch axial segment of each fuel rod in the core as: Peak kW/ft power generated in a fuel rod segment FLPD = LHGRumit where: LHGRumit = LHGR operating limit defined in Section 4.0 The licensed equipment conditions for operation with dome pressures in Region 11 and Region Ill of Figure 5-1 are defined in Table 5-1. TABLE 5-1 Pressure Dependent Operating Flexibility Options . . .. ' >"tJ: :r'hermal i.JrhilRatios for. Reclt.Jced' Presstir~;c>'~eration: * .......c, ..}* Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine Table# System Byr2.ass System Pressure Regulator In Service Or2.erable* System Status Yes Yes TLCO 3.3.13.a or b 5-2 No Yes TLCO 3.3.13.a or b 5-3 Flexibility Option Yes/No No TLCO 3.3.13.a orb Not Licensed Flexibility Option Yes/No Yes/No TLCO 3.3.13.c Not Licensed

  • At least two bypass valves must be operable 48

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 TABLE 5-2 Maximum Thermal Limit Ratios for Equipment In Service Operation ,, l' 'Dorrie Pressure Band fro1t1 Figure. 5~1 ,,,> Limit Ratio Region I Region II Region Ill MFLCPR 1.00 0.97 0.95 MFLPD 1.00 0.94 0.83 TABLE 5-3 Maximum Thermal Limit Ratios for EOC-RPT Out of Service Operation .. ,, Dome ~*ressure Band .from Figure 5~1 Limit Ratio Region I Region II Region Ill MFLCPR 1.00 0.97 0.92 MFLPD 1.00 0.94 0.83 49 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprieta ry Information Version 1.0 .1QQQ..Q_t::=::::+/-::!:::===:::l:::=====:t==l~===+/-==:::+/-:==::::+/-::===!:::==::+/-:::==::+/-:::==::+/-::===+/-===+/-===:t:::===!:::===t:::=====I 1058.0 1058.0 1040.0 c, 1020.0 .iii ~  ; 1000.0 Ill Ill ~ 0.. ~ 980.0 0 CJ 940.0 920.0 20 :25 30 35 40 45 50 55 60 65 70 75 24 Core Power (% of Rated) P = A+ B*(CP) + C*(CP) 2 Dome Pressure Curves Core Power A B C Nominal Dome Pressure (Pnom) 24 :5 CP :5 100 958.30 0.300 0.0057 Region I Upper Boundary (Pnom+ 10) 24 :5 CP :5 100 968.30 0.300 0.0057 Region I Lower Boundary (Pnom-10) 24 s; CP s; 100 948.30 0.300 0.0057 Region II Lower Boundary (Pnom-20) 24 s; CP s; 100 938.30 0.300 0.0057 Region Ill Lower Boundary (Pnom-4o) 24 :5 CP :5 100 918.30 0.300 0.0057 GP = Percent of Rated Core Power P = Reactor Dome Pressure (psig) FIGURE 5-1 Licensed Regions of Operating Dome Pressure versus Core Power 50 Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 6.0 PBDA AMPLITUDE SETPOINT The amplitude trip setpoint in the Period Based Detection Algorithm in the OPRM system must be set equal to the licensed value reported in Table 6-1. This applies to instruments 1C51 K615 A, B, C, and D. TABLE 6-1 Licensed OPRM Amplitude Setpoint . OPRMS.~tpoint

  • 1.15 51

Plant Hatch Core Operating Limits Report Unit 1 Cycle 29 Non-Proprietary Information Version 1.0 7 .0 REFERENCES

1. Global Nuclear Fuel Document NEDE-24011-P-A-25, "General Electric Standard Application for Reactor Fuel," August 2017, and the US Supplement, NEDE-24011-P-A-25-US, August 2017.
2. Southern Nuclear Operating Company Document NFD-H-17-280 "Hatch-1 Cycle 29 Reload Licensing Analysis Report," Version 1.0, January 2018.
3. Global Nuclear Fuel Document 004N0711, "Supplemental Reload Licensing Report for Hatch 1, Reload 28, Cycle 29," Revision 0, November 2017.
4. Global Nuclear Fuel Document 004N0712, "Fuel Bundle Information Report for Hatch 1, Reload 28, Cycle 29," Revision 1, December 2017.
5. Global Nuclear Fuel Document NEDC-32868P, "GE14 Compliance with Amendment 22 of NEDE-24011-P-A (GESTAR II)," Revision 6, March 2016.
6. Global Nuclear Fuel Document NEDC-33270P, "GNF2 Advantage Generic Compliance with NEDE-24011-P-A (GESTAR //}," Revision 8, April 2017.
7. Global Nuclear Fuel Document 004N4841, "Technical Evaluation to Support Introduction of Partially ARMOR Coated Lead Test Rods (L TRs) in Four (4) GNF2 Reload Assemblies at Hatch Nuclear Plant, Unit 1," Revision 0, November 2017.
8. Global Nuclear Fuel Document 004N5426, "Technical Evaluation to Support Introduction of GNF FeCrAI (ATF) Unfueled Lead Test Rods (LTRs) in Four (4) GNF2 Reload Assemblies at Hatch Nuclear Plant, Unit 1," Revision 0, November 2017.

52}}