Regulatory Issue Summary: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page with "{{#ask:Category:Regulatory Issue Summary |?start date }}")
 
No edit summary
Line 1: Line 1:
{{#ask:[[Category:Regulatory Issue Summary]]
{{#ask:[[Category:Regulatory Issue Summary]]
|?start date
|?start date
|sort=start date
|order=descending
}}
}}

Revision as of 13:29, 12 February 2018

 Start date
RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations5 March 2024
RIS 2009-06, Importance of Giving the NRC Advance Notice of Intent to Pursue License Renewal26 February 2024
RIS 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels26 June 2023
RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations19 April 2023
RIS 2014-06, Consideration of Current Operating Issues and Licensing Actions in License Renewal21 March 2023
RIS 2022-03, NRC Plans to Establish Controlled Unclassified Information-Sharing Agreements with Non-Executive Branch Entities8 December 2022
RIS 2022-02, Operational Leakage3 November 2022
RIS 2022-01, Preparation and Scheduling of Operator Licensing Examinations17 February 2022
RIS 2021-01, Preparation and Scheduling of Operator Licensing Examinations24 March 2021
RIS 2020-11, NRC Emergency Telecommunications System28 January 2021
RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations19 February 2020
RIS 2019-03, Pre-Application Communication and Scheduling for Accident Tolerant Fuel Submittals20 November 2019
RIS 2016-11, September 6, 2019, Summary of Public Meeting Addressing Concerns Re Regulatory Issue Summary (RIS) 2016-112 October 2019
RIS 2005-29, Withdrawal of Regulatory Issue Summary 2005-29 and Draft Revision 1, Anticipated Transients That Could Develop Into More Serious Events.15 May 2019
RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations.17 April 2019
RIS 2019-01, Analysis of Public Comments on Draft NRC Regulatory Issue Summary 2019-01, Clarification of Export Reporting Requirements for Nuclear Facilities, Equipment, and Non-Nuclear Materials15 March 2019
RIS 2018-06, Clarification of the Requirements for Reactor Vessel Upper Head Bare Metal Visual Examinations10 December 2018
RIS 2018-05, Supplier Oversight Issues Identified During Recent NRC Vendor Inspections5 October 2018
RIS 2002-22, 03/14/2018--Summary of a Category 3 Public Meeting Held with External Stakeholders to Provide an Opportunity for Discussion on Draft Regulatory Issue Summary 2002-22, Supplement 1, Clarification on Endorsement of Nuclear Energy Institute12 June 2018
RIS 2018-03, National Terrorism Advisory System and Protective Measures for the Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material1 June 2018
RIS 2002-22, Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in I&C Systems31 May 2018
RIS 2017-01, Human Reliability and Human Performance Database29 March 2018
RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations26 March 2018
RIS 2002-22, Summary of Comments on 2018-01-24 Draft Ris Ks R1 from Ken Scarola Nuclear Automation Engineering24 January 2018
RIS 2018-01, Common Violations Cited During First 2 Years of 10 CFR Part 37, Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material, Implementation and Guidance Documents Available to Support.22 January 2018
RIS 2005-31, Official Exhibit - Mandatory Hearing - NRC000086-MA-BD01 - NRC Reg Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Info Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the22 December 2005
26 December 2017
RIS 2005-31, Rev. 1, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the Use of Source Byproduct, & SNM22 December 2005
26 December 2017
RIS 2005-31, 2005/12/22-NRC Prefiled Exhibit Nrc000086, NRC Regulatory Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the U22 December 2005
26 December 2017
RIS 2017-08, Process for Scheduling and Allocating Resources for Fiscal Years 2020 Through 2022 for the Review of New Licensing A0plications for Light-Water Reactors and Non-Light Water Reactors21 December 2017
RIS 2017-05, Administration of 10 CFR Part 72 Certificate of Compliance Corrections and Revisions13 September 2017
RIS 2017-04, Clarification on the Implementation of Compensatory Measures for Protective Strategy Deficiencies or Degraded or Inoperable Security Systems, Equipment, or Components30 August 2017
RIS 2017-02, Applicability of Title 10 of the Code of Federal Regulations Part 37 to Non-Manufacturing and Distribution Service Provider Licensees8 February 2017
RIS 2016-12, NRC Employee Access to Switchyards at Licensee Facilities22 November 2016
RIS 2016-09, Withdrawn - NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations16 June 2016
RIS 2016-08, Process for Scheduling and Allocating Resources in Fiscal Year 2019 for the Review of New Licensing Applications for Light-Water Reactors and Non-Light-Water Reactors7 June 2016
RIS 2016-06, NRC Regulation of Radium-226 Under Military Control and For Coordination on CERCLA Response Actions at Dod Sites With Radioactive Materials.9 May 2016
RIS 2016-06, NRC Regulation of Radium-226 Under Military Control and for Coordination on CERCLA Response Actions at Dod Sites with Radioactive Materials.9 May 2016
RIS 2014-08, Regulatory Requirements for Transfer of Control (Change of Ownership) of Specific Materials Licensees5 May 2016
RIS 2016-05, Embedded Digital Devices in Safety-Related Systems29 April 2016
RIS 2016-04, Clarification of 10 CFR 50.46 Reporting Requirements and Recent Issues Identified with Guidance Not Approved for Use19 April 2016
RIS 2016-02, Design Basis Issues Related to Tube-To-TubeSheet Joints in Pressurized-Water Reactor Steam Generators23 March 2016
RIS 2016-01, Guidance for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services16 March 2016
RIS 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees15 January 2016
RIS 2015-18, Sodium Iodide-131 (I-131) Patient Release Information Collection Request.14 December 2015
RIS 2015-15, Information Regarding a Specific Exemption in the Requirements for the Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material4 December 2015
RIS 2015-11, Protective Action Recommendations for Members of the Public on Bodies of Water5 November 2015
RIS 2015-10, Applicability of ASME Code Case N-770-1 As Conditioned in 10 CFR 50.55A, Codes and Standards, to Branch Connection Butt Welds16 July 2015
RIS 2015-10, Applicability of ASME Code Case N-770-1 as Conditioned in 10 CFR 50.55a, Codes and Standards, to Branch Connection Butt Welds16 July 2015
RIS 2015-08, Oversight of Counterfeit, Fraudulent, and Suspect Items in the Nuclear Industry24 June 2015
RIS 2005-20, Rev. 2, Revision to NRC Inspection Manual Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded Or Nonconforming Conditions Adverse To Quality or Safety5 June 2015
... further results