ML070310013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML070310013
| number = ML070310013
| issue date = 01/29/2007
| issue date = 01/29/2007
| title = LaSalle, Units 1 & 2, Technical Specifications (Ts), Amendments 180 and 167, Extension of TS Completion Times, on a One Time Basis, Associated with the Residual Heat Removal Service Water System, Diesel Generator Cooling Water System..
| title = Technical Specifications (Ts), Amendments 180 and 167, Extension of TS Completion Times, on a One Time Basis, Associated with the Residual Heat Removal Service Water System, Diesel Generator Cooling Water System..
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL
Line 9: Line 9:
| docket = 05000373, 05000374
| docket = 05000373, 05000374
| license number = NPF-011, NPF-018
| license number = NPF-011, NPF-018
| contact person = Sands S P,NRR/DORL, 415-3154
| contact person = Sands S,NRR/DORL, 415-3154
| case reference number = TAC MD2423, TAC MD2424
| case reference number = TAC MD2423, TAC MD2424
| package number = ML063520226
| package number = ML063520226
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:AC Sources-Operating
{{#Wiki_filter:AC Sources-Operating 3.8.1 ACTIONS CONDITION                REQUIRED ACTION            COMPLETION TIME C.- -------- NOTES-------    C.1      Perform SR 3.8.1.1      1 hour
: 1. Not applicable to              for OPERABLE required Unit 1 during              offsite circuit(s).      AND replacement of the Unit 2 Division 2                                    Once per CSCS isolation                                      8 hours valves during Unit                                  thereafter 2 Refueling 11 while Unit 2 is in AND MODE 4, 5, or defueled.          C.2      Declare required        4 hours from, feature(s), supported    discovery of
: 2. Not applicable to          by the inoperable        Condition C Unit 2 during              DG(s), inoperable        concurrent with replacement of the          when the redundant      inoperability Unit 1 Division 2          required feature(s)      of redundant CSCS isolation              are inoperable.          required valves during Unit                                  feature(s) 1 Refueling 12 while Unit I is in  AND MODE 4, 5, or defueled.          C.3.1    Determine OPERABLE      24 hours DG(s) are not inoperable due to common cause failure.
Required Division 3 DG inoperable.                  OR OR                    C.3.2    Perform SR 3.8.1.2      24 hours for OPERABLE DG(s).
One required Division 1, 2, or 3 DG          AND inoperable and the required opposite unit C.4      Restore required        72 hours Division 2 DG                  DG(s) to OPERABLE inoperable.                    status.                  AND 17 days from discovery of failure to meet LCO 3.8.1.a or b (continued)
. LaSalle I and 2                      3.8.1-4                Amendment No.180 /167


====3.8.1 ACTIONS====
AC Sources-Operating 3.8.1 ACTIONS CONDITION               REQUIRED ACTION           COMPLETION TIME F.---------   NOTES-------- F.1    Restore one required    2 hours
CONDITION REQUIRED ACTION COMPLETION TIME C. --------- NOTES-------
: 1. Not applicable to           DG to OPERABLE Unit 1 during               status.                OR replacement of the Unit 2 Division 2                                   72 hours if CSCS isolation                                     Division 3 DG valves during Unit 2                               is inoperable Refueling 11 while Unit 2 is in MODE 4,5, or defueled.
: 1. Not applicable to Unit 1 during replacement of the Unit 2 Division 2 CSCS isolation valves during Unit 2 Refueling 11 while Unit 2 is in MODE 4, 5, or defueled.2. Not applicable to Unit 2 during replacement of the Unit 1 Division 2 CSCS isolation valves during Unit 1 Refueling 12 while Unit I is in MODE 4, 5, or defueled.C.1 Perform SR 3.8.1.1 for OPERABLE required offsite circuit(s).
: 2. Not applicable to Unit 2 during replacement of the Unit I Division 2 CSCS isolation valves during Unit 1 Refueling 12 while Unit I is in MODE 4,5, or defueled.
AND C.2 Declare required feature(s), supported by the inoperable DG(s), inoperable when the redundant required feature(s) are inoperable.
Two required Division 1, 2, or 3 DGs inoperable.
Required Division 3 DG inoperable.
OR Division 2 DG and the required opposite unit Division 2 DG inoperabl e.
OR One required Division 1, 2, or 3 DG inoperable and the required opposite unit Division 2 DG inoperable.
(continued)
AND C.3.1 Determine OPERABLE DG(s) are not inoperable due to common cause failure.OR C.3.2 Perform SR 3.8.1.2 for OPERABLE DG(s).AND 1 hour AND Once per 8 hours thereafter 4 hours from, discovery of Condition C concurrent with inoperability of redundant required feature(s) 24 hours 24 hours 72 hours AND 17 days from discovery of failure to meet LCO 3.8.1.a or b C.4 Restore required DG(s) to OPERABLE status.(continued)
LaSalle I and 2                   3.8.1-6              Amendment No.I180/167
.LaSalle I and 2 3.8.1-4 Amendment No.180 /167 AC Sources-Operating


====3.8.1 ACTIONS====
AC Sources-Operating 3.8.1 ACTIONS CONDITION             REQUIRED ACTION       [ COMPLETION TIME G.   --------   NOTES-------- G.1    Restore required    6 days Division 2 DG to
CONDITION REQUIRED ACTION COMPLETION TIME F. ---------NOTES--------
: 1. Only applicable to           OPERABLE status.
: 1. Not applicable to Unit 1 during replacement of the Unit 2 Division 2 CSCS isolation valves during Unit 2 Refueling 11 while Unit 2 is in MODE 4,5, or defueled.F.1 Restore one required DG to OPERABLE status.2 hours OR 72 hours if Division 3 DG is inoperable
Unit 1 during replacement of the Unit 2 Division 2 CSCS isolation valves during Unit 2 Refueling 11 while Unit 2 is in MODE 4,5, or defueled.
: 2. Not applicable to Unit 2 during replacement of the Unit I Division 2 CSCS isolation valves during Unit Refueling 12 while Unit I is in MODE 4,5, or defueled.1 Two required Division 1, 2, or 3 DGs inoperable.
: 2. Only applicable to Unit 2 during replacement of the Unit 1 Division 2 CSCS isolation valves during Unit 1 Refueling 12 while Unit 1 is in MODE 4,5, or defueled.
OR Division 2 DG and the required opposite unit Division 2 DG inoperabl e.(continued)
Division 2 DG and the required opposite unit Division 2 DG inoperable.
LaSalle I and 2 3.8.1-6 Amendment No.I180/167 AC Sources-Operating
H. Required Action and      H.1  Be in MODE 3.        12 hours associated Completion Time of Condition A,    AND B, C, D, E, F or G not met.                    H.2  Be in MODE 4.        36 hours I. Three or more required  1.1  Enter LCO 3.0.3.      Immediately AC sources inoperable.
LaSalle 1 and 2                   3.8.1-7            Amendment Noi) 18 0 467


====3.8.1 ACTIONS====
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS
CONDITION REQUIRED ACTION [ COMPLETION TIME G. --------NOTES--------
------------------------------------NOTES----------------------------------
: 1. Only applicable to Unit 1 during replacement of the Unit 2 Division 2 CSCS isolation valves during Unit 2 Refueling 11 while Unit 2 is in MODE 4,5, or defueled.G.1 Restore required Division 2 DG to OPERABLE status.6 days 2. Only applicable to Unit 2 during replacement of the Unit 1 Division 2 CSCS isolation valves during Unit Refueling 12 while Unit 1 is in MODE 4,5, or defueled.1 Division 2 DG and the required opposite unit Division 2 DG inoperable.
: 1. SR 3.8.1.1 through SR 3.8.1.20 are applicable only to the given unit's AC electrical power sources.
H. Required Action and H.1 Be in MODE 3. 12 hours associated Completion Time of Condition A, AND B, C, D, E, F or G not met. H.2 Be in MODE 4. 36 hours I. Three or more required 1.1 Enter LCO 3.0.3. Immediately AC sources inoperable.
: 2. SR 3.8.1.21 is       applicable to the required opposite unit's DG.
LaSalle 1 and 2 3.8.1-7 Amendment Noi) 18 0 467 AC Sources-Operating
SURVEILLANCE                              FREQUENCY SR 3.8.1.1      Verify correct breaker alignment and                 7 days indicated power availability for each required offsite circuit.
SR 3.8.1.2    --------------------        NOTES-----------------
: 1.      All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
: 2.      A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.
When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.
: 3.       A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.
Verify each required DG starts from standby          31 days conditions and achieves steady state voltage Ž 4010 V and
* 4310 V and frequency 58.8 Hz and
* 61.2 Hz.
(continued)
LaSalle 1 and 2                             3.8.1-8                Amendment No-1180 /167


====3.8.1 SURVEILLANCE====
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                              FREQUENCY SR  3.8.1.3    --------------------      NOTES-----------------
: 1.        DG loadings may include gradual loading as recommended by the manufacturer.
: 2.        Momentary transients outside the load range do not invalidate this test.
: 3.        This Surveillance shall be conducted on only one DG at a time.
: 4.        This SR shall be preceded by, and immediately follow, without shutdown, a successful performance of SR 3.8.1.2 or SR 3.8.1.7.
: 5.        A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.
Verify each required DG is synchronized and            31 days loaded and operates for Ž 60 minutes at a load Ž 2400 kW and
* 2600 kW.
SR  3.8.1.4    Verify each required day tank contains                31 days
                Ž  250 gal of fuel oil for Divisions 1 and 2 and Ž 550 gal for Division 3.
SR  3.8.1.5    Check for and remove accumulated water from            31 days each required day tank.
SR  3.8.1.6    Verify each required fuel oil transfer                92 days system operates to automatically transfer fuel oil from storage tanks to the day tank.
(continued)
LaSalle I and 2                            3.8.1-9                Amendment No.180 467


REQUIREMENTS
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                               FREQUENCY SR  3.8.1.7     --------------------     NOTES-----------------
------------------------------------
: 1.       All DG starts may be preceded by an engine prelube period.
NOTES----------------------------------
: 2.       A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.
: 1. SR 3.8.1.1 through SR 3.8.1.20 are applicable only to the given unit's AC electrical power sources.2. SR 3.8.1.21 is applicable to the required opposite unit's DG.SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and 7 days indicated power availability for each required offsite circuit.SR 3.8.1.2 --------------------
Verify each required DG starts from standby           184 days condition and achieves:
NOTES-----------------
: a.       In s 13 seconds, voltage     Ž 4010 V and frequency Ž 58.8 Hz; and,
: 1. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.2. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.
: b.       Steady state voltage Ž 4010 V and
When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.3. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.Verify each required DG starts from standby 31 days conditions and achieves steady state voltage  4010 V and  4310 V and frequency 58.8 Hz and  61.2 Hz.(continued)
* 4310 V and frequency Ž 58.8 Hz and
LaSalle 1 and 2 3.8.1-8 Amendment No-1180 /167 AC Sources-Operating
* 61.2.Hz.
 
SR 3.8.1.8   --------------------NOTE------------------
====3.8.1 SURVEILLANCE====
This Surveillance shall not normally be performed in MODE 1 or 2.         However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.           Credit may be taken for unplanned events that satisfy this SR.
REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.3 --------------------
Verify manual transfer of unit power supply           24 months from the normal offsite circuit to the alternate offsite circuit.
NOTES-----------------
(continued)
: 1. DG loadings may include gradual loading as recommended by the manufacturer.
LaSalle I and 2                           3.8.1-10               Amendment No. 180 1167
: 2. Momentary transients outside the load range do not invalidate this test.3. This Surveillance shall be conducted on only one DG at a time.4. This SR shall be preceded by, and immediately follow, without shutdown, a successful performance of SR 3.8.1.2 or SR 3.8.1.7.5. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.Verify each required DG is synchronized and loaded and operates for  60 minutes at a load  2400 kW and  2600 kW.31 days SR 3.8.1.4 Verify each required day tank contains 31 days 250 gal of fuel oil for Divisions 1 and 2 and 550 gal for Division 3.SR 3.8.1.5 Check for and remove accumulated water from 31 days each required day tank.SR 3.8.1.6 Verify each required fuel oil transfer 92 days system operates to automatically transfer fuel oil from storage tanks to the day tank.(continued)
LaSalle I and 2 3.8.1-9 Amendment No.180 467 AC Sources-Operating
 
====3.8.1 SURVEILLANCE====
 
REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.7 --------------------
NOTES-----------------
: 1. All DG starts may be preceded by an engine prelube period.2. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.Verify each required DG starts from standby 184 days condition and achieves: a. In s 13 seconds, voltage 4010 V and frequency 58.8 Hz; and, b. Steady state voltage 4010 V and 4310 V and frequency 58.8 Hz and 61.2.Hz.SR 3.8.1.8 --------------------
NOTE------------------
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Credit may be taken for unplanned events that satisfy this SR.Verify manual transfer of unit power supply 24 months from the normal offsite circuit to the alternate offsite circuit.(continued)
LaSalle I and 2 3.8.1-10 Amendment No. 180 1167 AC Sources-Operating
 
====3.8.1 SURVEILLANCE====
 
REQUIREMENTS SURVEI LLANCE FREQUENCY SR 3.8.1.9 -------------------
NOTES------------------
: 1. This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.Credit may be taken for unplanned events that satisfy this SR.2. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.Verify each required DG rejects a load greater than or equal to its associated single largest post-accident load and following load rejection, the frequency is 66.7 Hz.24 months i SR 3.8.1.10------------------
NOTES-------------------
: 1. This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.Credit may be taken for unplanned events that satisfy this SR.2. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.Verify each required DG does not trip and voltage is maintained 5000 V during and following a load rejection of a load 2600 kW.24 months (continued)
LaSalle I and 2 3.8.1-11 Amendment No.1 8 0 167 AC Sources-Operating
 
====3.8.1 SURVEILLANCE====


REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.11 --------------------
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEI LLANCE                                FREQUENCY SR   3.8.1.-------------------         NOTES------------------
NOTES-----------------
: 1.       This Surveillance shall not normally be performed in MODE 1 or 2.       However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
: 1. All DG starts may be preceded by an engine prelube period.2. This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Credit may be taken for unplanned events that satisfy this SR.
Credit may be taken for unplanned events that satisfy this SR.Verify on an actual or simulated loss of 24 months offsite power signal: a. De-energization of emergency buses;b. Load shedding from emergency buses for Divisions I and 2 only; and c. DG auto-starts from standby condition and: 1. energizes permanently connected loads in 13 seconds, 2. energizes auto-connected shutdown loads, 3. maintains steady state voltage 4010 V and 4310 ýV, 4. maintains steady state frequency 58.8 Hz and  61.2 Hz, and 5. supplies permanently connected and auto-connected shutdown loads for 5 minutes.(continued)
: 2.       A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.
LaSalle I and 2 3.8.1-12 Amendment No.1 8 0/167 AC Sources-Operating
Verify each required DG rejects a load                  24 months greater than or equal to its associated single largest post-accident load and following load rejection, the frequency is
* 66.7 Hz.
i SR  3.8.1.10    -- ----------------      NOTES-------------------
: 1.     This Surveillance shall not normally be performed in MODE 1 or 2.      However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Credit may be taken for unplanned events that satisfy this SR.
: 2.       A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.
Verify each required DG does not trip and                24 months voltage is maintained
* 5000 V during and following a load rejection of a load
                Ž 2600 kW.
(continued)
LaSalle I and 2                             3.8.1-11              Amendment No. 180 167


====3.8.1 SURVEILLANCE====
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                FREQUENCY SR  3.8.1.11  --------------------          NOTES-----------------
: 1.      All DG starts may be preceded by an engine prelube period.
: 2.      This Surveillance shall not normally be performed in MODE 1 or 2.        However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.      Credit may be taken for unplanned events that satisfy this SR.
Verify on an actual          or simulated loss of      24 months offsite power signal:
: a.      De-energization of emergency buses;
: b.      Load shedding from emergency buses for Divisions I and 2 only; and
: c.      DG auto-starts from standby condition and:
: 1. energizes permanently connected loads in
* 13 seconds,
: 2. energizes auto-connected    shutdown loads,
: 3. maintains steady state voltage
                                  Ž 4010 V and
* 4310 ýV,
: 4. maintains steady state frequency
                                  Ž 58.8 Hz and
* 61.2 Hz,    and
: 5. supplies permanently connected and auto-connected shutdown loads for 5 minutes.
(continued)
LaSalle I and 2                              3.8.1-12                Amendment No.1  80  /167


REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.12-------------------
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                 FREQUENCY SR 3.8.1.12                             -------------------
NOTES-----------------
NOTES-----------------
: 1. All DG starts may be preceded by an engine prelube period.2. This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
: 1. All DG starts may be preceded by an engine prelube period.
Credit may be taken for unplanned events that satisfy this SR.Verify on an actual or simulated Emergency Core Cooling System (ECCS) initiation signal each required DG auto-starts from standby condition and: a. In 13 seconds after auto-start, achieves voltage 4010 V and frequency 58.8 Hz;b. Achieves steady state voltage 4010 V and 4310 V and frequency 2 58.8 Hz and 61.2 Hz; and c. Operates for  5 minutes.24 months (continued)
: 2. This Surveillance shall not normally be performed in MODE 1 or 2.     However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
LaSalle 1 and 2 3.8.1-13 Amendment No.18 0 f67 AC Sources-Operating
Verify on an actual or simulated Emergency         24 months Core Cooling System (ECCS) initiation signal each required DG auto-starts from standby condition and:
: a. In
* 13 seconds after auto-start, achieves voltage Ž 4010 V and frequency Ž 58.8 Hz;
: b. Achieves steady state voltage Ž 4010 V and
* 4310 V and frequency 2 58.8 Hz and
* 61.2 Hz; and
: c. Operates for   Ž 5 minutes.
(continued)
LaSalle 1 and 2                       3.8.1-13                 Amendment No.18 0 f67


====3.8.1 SURVEILLANCE====
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                 FREQUENCY 4
 
SR   3.8.1.13                             -------------------
REQUIREMENTS SURVEILLANCE FREQUENCY 4 SR 3.8.1.13-------------------
NOTE------------------
NOTE------------------
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
This Surveillance shall not normally be performed in MODE 1 or 2.     However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.       Credit may be taken for unplanned events that satisfy this SR.
Credit may be taken for unplanned events that satisfy this SR.Verify each required DG's automatic trips are bypassed on an actual or simulated ECCS initiation signal except: a. Engine overspeed; and b. Generator differential current.24 months (continued)
Verify each required DG's automatic trips         24 months are bypassed on an actual or simulated ECCS initiation signal except:
LaSalle 1.and 2 3.8.1-14 Amendment No. 180 /167 AC Sources-Operating
: a. Engine overspeed;   and
: b. Generator differential   current.
(continued)
LaSalle 1.and 2                     3.8.1-14                 Amendment No. 180 /167


====3.8.1 SURVEILLANCE====
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                FREQUENCY SR  3.8.1.14  --------------------        NOTES-----------------
: 1.      Momentary transients outside the load and power factor ranges do not invalidate this test.
: 2.      This Surveillance shall not normally be performed in MODE 1 or 2 unless the other two DGs are OPERABLE.        If either of the other two DGs becomes inoperable, this Surveillance shall be suspended.      However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.      Credit may be taken for unplanned events that satisfy this SR.
: 3.      If grid conditions do not permit, the power factor limit is not required to be met.      Under this condition, the power factor shall be maintained as close to the limit as practicable.
: 4.      A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.
Verify each required DG operating within                24 months the power factor limit operates for 24 hours:
: a.      For    Ž  2 hours loaded  Ž 2860 kW; and
: b.      For the remaining hours of the test loaded Ž 2400 kW and
* 2600 kW.
(continued)
LaSalle I and 2                              3.8.1-15                Amendment No180    /167


REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.14 --------------------
AC Sources-Operating 3.8.1
NOTES-----------------
.SURVEILLANCE   REQUIREMENTS SURVEILLANCE                             FREQUENCY SR 3.8.1.15   --------------------       NOTES-----------------
: 1. Momentary transients outside the load and power factor ranges do not invalidate this test.2. This Surveillance shall not normally be performed in MODE 1 or 2 unless the other two DGs are OPERABLE.
: 1.       This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated Ž 2 hours loaded Ž 2400 kW and
If either of the other two DGs becomes inoperable, this Surveillance shall be suspended.
* 2600 kW.
However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Momentary transients outside of load range do not invalidate this test.
Credit may be taken for unplanned events that satisfy this SR.3. If grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable.
: 2.       All DG starts may be preceded by an engine prelube period.
: 4. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.Verify each required DG operating within 24 months the power factor limit operates for 24 hours: a. For  2 hours loaded  2860 kW; and b. For the remaining hours of the test loaded  2400 kW and  2600 kW.(continued)
: 3.       A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.
LaSalle I and 2 3.8.1-15 Amendment No180 /167 AC Sources-Operating 3.8.1.SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.15 --------------------
Verify each required DG starts and                   24 months achieves:
NOTES-----------------
: a.       In
: 1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 hours loaded 2400 kW and 2600 kW.Momentary transients outside of load range do not invalidate this test.2. All DG starts may be preceded by an engine prelube period.3. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.Verify each required DG starts and 24 months achieves: a. In 13 seconds, voltage  4010 V and frequency 58.8 Hz; and b. Steady state voltage 4010 V and 4310 V and frequency 58.8 Hz and 61.2 Hz.(continued)
* 13 seconds, voltage Ž 4010 V and frequency Ž 58.8 Hz; and
LaSalle 1 and 2 3.8.1-16 Amendment No. 180 / 167 AC Sources-Operating
: b.       Steady state voltage Ž 4010 V and
 
* 4310 V and frequency Ž 58.8 Hz and
====3.8.1 SURVEILLANCE====
* 61.2 Hz.
(continued)
LaSalle 1 and 2                             3.8.1-16               Amendment No. 180 / 167


REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.16--------------
AC Sources-Operating 3.8.1 SURVEILLANCE  REQUIREMENTS SURVEILLANCE                                 FREQUENCY SR 3.8.1.16                       -- NOTE------------------
--NOTE------------------
This Surveillance shall not normally be performed in MODE 1 or 2.     However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.       Credit may be taken for unplanned events that satisfy this SR.
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify each required DG:                          24 months
Credit may be taken for unplanned events that satisfy this SR.Verify each required DG: a. Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power;b. Transfers loads to offsite power source; and c. Returns to ready-to-load operation.
: a. Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power;
24 months (continued)
: b. Transfers loads to offsite power source; and
LaSalle I and 2 3.8.1-17 Amendment No.1 8 0/167 AC Sources-Operating
: c. Returns to ready-to-load   operation.
(continued)
LaSalle I and 2                       3.8.1-17               Amendment No. 180  /167


====3.8.1 SURVEILLANCE====
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR  3.8.1.17    --------------------      NOTE------------------
This Surveillance shall not normally be performed in MODE 1 or 2.            However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.          Credit may be taken for unplanned events that satisfy this SR.
Verify, with a required DG operating in                  24 months test mode and connected to its bus:
: a.        For Division 1 and 2 DGs, an actual or simulated ECCS initiation signal overrides the test mode by returning DG to ready-to-load operation; and
: b.        For Division    3 DG, an actual or simulated DG      overcurrent trip signal automatically      disconnects the offsite power source      while the DG continues to supply normal      loads.
SR  3.8.1.18  --------------------- NOTE------------------
This Surveillance shall not normally be performed in MODE 1 or 2.            However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.            Credit may be taken for unplanned events that satisfy this SR.
Verify interval between each sequenced load              24 months block, for Division 1 and 2 DGs only, is
                Ž 90% of the design interval for each time delay relay.
(continued)
LaSalle 1 and 2                            3.8.1-18                Amendment No. 18 0 /167


REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.17 --------------------
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                               FREQUENCY SR 3.8.1.19  --------------------         NOTES-----------------
NOTE------------------
: 1.      All DG starts may be preceded by an engine prelube period.
This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
: 2.      This Surveillance shall not normally be performed in MODE 1 or 2.       However.,
Credit may be taken for unplanned events that satisfy this SR.Verify, with a required DG operating in test mode and connected to its bus: a. For Division 1 and 2 DGs, an actual or simulated ECCS initiation signal overrides the test mode by returning DG to ready-to-load operation; and b. For Division 3 DG, an actual or simulated DG overcurrent trip signal automatically disconnects the offsite power source while the DG continues to supply normal loads.24 months SR 3.8.1.18---------------------
portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.     Credit may be taken for unplanned events that satisfy this SR.
NOTE------------------
Verify, on an actual or simulated loss of              24 months offsite power signal in conjunction with an actual or simulated ECCS initiation signal:
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
: a.      De-energization      of emergency buses;
Credit may be taken for unplanned events that satisfy this SR.Verify interval between each sequenced load block, for Division 1 and 2 DGs only, is 90% of the design interval for each time delay relay.24 months (continued)
: b.      Load shedding from emergency buses for Divisions 1 and 2 only; and
LaSalle 1 and 2 3.8.1-18 Amendment No.1 8 0/167 AC Sources-Operating
: c.       DG auto-starts from standby condition and:
: 1. energizes permanently connected loads in
* 13 seconds,
: 2. energizes auto-connected emergency loads including through time delay relays, where applicable,
: 3. maintains steady state voltage
                                  Ž 4010 V and
* 4310 V,
: 4. maintains steady state frequency 58.8 Hz and
* 61.2 Hz, and
: 5. supplies permanently connected and auto-connected emergency loads for 5 minutes.
(continued)
LaSalle 1 and 2                             3.8.1-19                Amendment No.180 /167


====3.8.1 SURVEILLANCE====
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                 FREQUENCY SR 3.8.1.20     --------------------       NOTE------------------
 
All DG starts may be preceded by an engine prelube period.
REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.19 --------------------
Verify, when started simultaneously from                 10 years standby condition, each required DG achieves, in
NOTES-----------------
* 13 seconds, voltage Ž 4010 V and frequency Ž 58.8 Hz.
: 1. All DG starts may be preceded by an engine prelube period.2. This Surveillance shall not normally be performed in MODE 1 or 2. However., portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
SR 3.8.1.21   --------------------NOTE------------------
Credit may be taken for unplanned events that satisfy this SR.Verify, on an actual or simulated loss of 24 months offsite power signal in conjunction with an actual or simulated ECCS initiation signal: a. De-energization of emergency buses;b. Load shedding from emergency buses for Divisions 1 and 2 only; and c. DG auto-starts from standby condition and: 1. energizes permanently connected loads in  13 seconds, 2. energizes auto-connected emergency loads including through time delay relays, where applicable, 3. maintains steady state voltage 4010 V and  4310 V, 4. maintains steady state frequency 58.8 Hz and  61.2 Hz, and 5. supplies permanently connected and auto-connected emergency loads for 5 minutes.(continued)
When the opposite unit is in MODE 4 or 5, or moving irradiated fuel assemblies in secondary containment, the following opposite unit SRs are not required to be performed:           SR 3.8.1.3, SR 3.8.1.9 through SR 3.8.1.11, SR 3.8.1.14 through SR 3.8.1.16.
LaSalle 1 and 2 3.8.1-19 Amendment No.180 /167 AC Sources-Operating
For required opposite unit DG, the SRs of               In accordance the opposite unit's Specification 3.8.1,                 with applicable except SR 3.8.1.12, SR 3.8.1.13,                         SRs SR 3.8.1.17, SR 3.8.1.18, SR 3.8.1.19, and SR 3.8.1.20, are applicable.
 
LaSalle 1 and 2                               3.8.1-20               Amendment No.180 /167}}
====3.8.1 SURVEILLANCE====
 
REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.20 --------------------
NOTE------------------
All DG starts may be preceded by an engine prelube period.Verify, when started simultaneously from 10 years standby condition, each required DG achieves, in 13 seconds, voltage 4010 V and frequency 58.8 Hz.SR 3.8.1.21 --------------------
NOTE------------------
When the opposite unit is in MODE 4 or 5, or moving irradiated fuel assemblies in secondary containment, the following opposite unit SRs are not required to be performed:
SR 3.8.1.3, SR 3.8.1.9 through SR 3.8.1.11, SR 3.8.1.14 through SR 3.8.1.16.For required opposite unit DG, the SRs of In accordance the opposite unit's Specification 3.8.1, with applicable except SR 3.8.1.12, SR 3.8.1.13, SRs SR 3.8.1.17, SR 3.8.1.18, SR 3.8.1.19, and SR 3.8.1.20, are applicable.
LaSalle 1 and 2 3.8.1-20 Amendment No.180 /167}}

Latest revision as of 20:52, 13 March 2020

Technical Specifications (Ts), Amendments 180 and 167, Extension of TS Completion Times, on a One Time Basis, Associated with the Residual Heat Removal Service Water System, Diesel Generator Cooling Water System..
ML070310013
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/29/2007
From:
Plant Licensing Branch III-2
To:
Sands S,NRR/DORL, 415-3154
Shared Package
ML063520226 List:
References
TAC MD2423, TAC MD2424
Download: ML070310013 (16)


Text

AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.- -------- NOTES------- C.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

1. Not applicable to for OPERABLE required Unit 1 during offsite circuit(s). AND replacement of the Unit 2 Division 2 Once per CSCS isolation 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> valves during Unit thereafter 2 Refueling 11 while Unit 2 is in AND MODE 4, 5, or defueled. C.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from, feature(s), supported discovery of
2. Not applicable to by the inoperable Condition C Unit 2 during DG(s), inoperable concurrent with replacement of the when the redundant inoperability Unit 1 Division 2 required feature(s) of redundant CSCS isolation are inoperable. required valves during Unit feature(s) 1 Refueling 12 while Unit I is in AND MODE 4, 5, or defueled. C.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG(s) are not inoperable due to common cause failure.

Required Division 3 DG inoperable. OR OR C.3.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE DG(s).

One required Division 1, 2, or 3 DG AND inoperable and the required opposite unit C.4 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Division 2 DG DG(s) to OPERABLE inoperable. status. AND 17 days from discovery of failure to meet LCO 3.8.1.a or b (continued)

. LaSalle I and 2 3.8.1-4 Amendment No.180 /167

AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F.--------- NOTES-------- F.1 Restore one required 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

1. Not applicable to DG to OPERABLE Unit 1 during status. OR replacement of the Unit 2 Division 2 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> if CSCS isolation Division 3 DG valves during Unit 2 is inoperable Refueling 11 while Unit 2 is in MODE 4,5, or defueled.
2. Not applicable to Unit 2 during replacement of the Unit I Division 2 CSCS isolation valves during Unit 1 Refueling 12 while Unit I is in MODE 4,5, or defueled.

Two required Division 1, 2, or 3 DGs inoperable.

OR Division 2 DG and the required opposite unit Division 2 DG inoperabl e.

(continued)

LaSalle I and 2 3.8.1-6 Amendment No.I180/167

AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION [ COMPLETION TIME G. -------- NOTES-------- G.1 Restore required 6 days Division 2 DG to

1. Only applicable to OPERABLE status.

Unit 1 during replacement of the Unit 2 Division 2 CSCS isolation valves during Unit 2 Refueling 11 while Unit 2 is in MODE 4,5, or defueled.

2. Only applicable to Unit 2 during replacement of the Unit 1 Division 2 CSCS isolation valves during Unit 1 Refueling 12 while Unit 1 is in MODE 4,5, or defueled.

Division 2 DG and the required opposite unit Division 2 DG inoperable.

H. Required Action and H.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A, AND B, C, D, E, F or G not met. H.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I. Three or more required 1.1 Enter LCO 3.0.3. Immediately AC sources inoperable.

LaSalle 1 and 2 3.8.1-7 Amendment Noi) 18 0 467

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS


NOTES----------------------------------

1. SR 3.8.1.1 through SR 3.8.1.20 are applicable only to the given unit's AC electrical power sources.
2. SR 3.8.1.21 is applicable to the required opposite unit's DG.

SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and 7 days indicated power availability for each required offsite circuit.

SR 3.8.1.2 -------------------- NOTES-----------------

1. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
2. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.

When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.

3. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.

Verify each required DG starts from standby 31 days conditions and achieves steady state voltage Ž 4010 V and

  • 4310 V and frequency 58.8 Hz and
  • 61.2 Hz.

(continued)

LaSalle 1 and 2 3.8.1-8 Amendment No-1180 /167

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.3 -------------------- NOTES-----------------

1. DG loadings may include gradual loading as recommended by the manufacturer.
2. Momentary transients outside the load range do not invalidate this test.
3. This Surveillance shall be conducted on only one DG at a time.
4. This SR shall be preceded by, and immediately follow, without shutdown, a successful performance of SR 3.8.1.2 or SR 3.8.1.7.
5. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.

Verify each required DG is synchronized and 31 days loaded and operates for Ž 60 minutes at a load Ž 2400 kW and

  • 2600 kW.

SR 3.8.1.4 Verify each required day tank contains 31 days

Ž 250 gal of fuel oil for Divisions 1 and 2 and Ž 550 gal for Division 3.

SR 3.8.1.5 Check for and remove accumulated water from 31 days each required day tank.

SR 3.8.1.6 Verify each required fuel oil transfer 92 days system operates to automatically transfer fuel oil from storage tanks to the day tank.

(continued)

LaSalle I and 2 3.8.1-9 Amendment No.180 467

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.7 -------------------- NOTES-----------------

1. All DG starts may be preceded by an engine prelube period.
2. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.

Verify each required DG starts from standby 184 days condition and achieves:

a. In s 13 seconds, voltage Ž 4010 V and frequency Ž 58.8 Hz; and,
b. Steady state voltage Ž 4010 V and
  • 4310 V and frequency Ž 58.8 Hz and
  • 61.2.Hz.

SR 3.8.1.8 --------------------NOTE------------------

This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify manual transfer of unit power supply 24 months from the normal offsite circuit to the alternate offsite circuit.

(continued)

LaSalle I and 2 3.8.1-10 Amendment No. 180 1167

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEI LLANCE FREQUENCY SR 3.8.1.9 ------------------- NOTES------------------

1. This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Credit may be taken for unplanned events that satisfy this SR.

2. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.

Verify each required DG rejects a load 24 months greater than or equal to its associated single largest post-accident load and following load rejection, the frequency is

  • 66.7 Hz.

i SR 3.8.1.10 -- ---------------- NOTES-------------------

1. This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Credit may be taken for unplanned events that satisfy this SR.

2. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.

Verify each required DG does not trip and 24 months voltage is maintained

  • 5000 V during and following a load rejection of a load

Ž 2600 kW.

(continued)

LaSalle I and 2 3.8.1-11 Amendment No. 180 167

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.11 -------------------- NOTES-----------------

1. All DG starts may be preceded by an engine prelube period.
2. This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify on an actual or simulated loss of 24 months offsite power signal:

a. De-energization of emergency buses;
b. Load shedding from emergency buses for Divisions I and 2 only; and
c. DG auto-starts from standby condition and:
1. energizes permanently connected loads in
  • 13 seconds,
2. energizes auto-connected shutdown loads,
3. maintains steady state voltage

Ž 4010 V and

  • 4310 ýV,
4. maintains steady state frequency

Ž 58.8 Hz and

  • 61.2 Hz, and
5. supplies permanently connected and auto-connected shutdown loads for 5 minutes.

(continued)

LaSalle I and 2 3.8.1-12 Amendment No.1 80 /167

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.12 -------------------

NOTES-----------------

1. All DG starts may be preceded by an engine prelube period.
2. This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify on an actual or simulated Emergency 24 months Core Cooling System (ECCS) initiation signal each required DG auto-starts from standby condition and:

a. In
  • 13 seconds after auto-start, achieves voltage Ž 4010 V and frequency Ž 58.8 Hz;
b. Achieves steady state voltage Ž 4010 V and
  • 4310 V and frequency 2 58.8 Hz and
  • 61.2 Hz; and
c. Operates for Ž 5 minutes.

(continued)

LaSalle 1 and 2 3.8.1-13 Amendment No.18 0 f67

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY 4

SR 3.8.1.13 -------------------

NOTE------------------

This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify each required DG's automatic trips 24 months are bypassed on an actual or simulated ECCS initiation signal except:

a. Engine overspeed; and
b. Generator differential current.

(continued)

LaSalle 1.and 2 3.8.1-14 Amendment No. 180 /167

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.14 -------------------- NOTES-----------------

1. Momentary transients outside the load and power factor ranges do not invalidate this test.
2. This Surveillance shall not normally be performed in MODE 1 or 2 unless the other two DGs are OPERABLE. If either of the other two DGs becomes inoperable, this Surveillance shall be suspended. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
3. If grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable.
4. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.

Verify each required DG operating within 24 months the power factor limit operates for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:

a. For Ž 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded Ž 2860 kW; and
b. For the remaining hours of the test loaded Ž 2400 kW and
  • 2600 kW.

(continued)

LaSalle I and 2 3.8.1-15 Amendment No180 /167

AC Sources-Operating 3.8.1

.SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.15 -------------------- NOTES-----------------

1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated Ž 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded Ž 2400 kW and
  • 2600 kW.

Momentary transients outside of load range do not invalidate this test.

2. All DG starts may be preceded by an engine prelube period.
3. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.

Verify each required DG starts and 24 months achieves:

a. In
  • 13 seconds, voltage Ž 4010 V and frequency Ž 58.8 Hz; and
b. Steady state voltage Ž 4010 V and
  • 4310 V and frequency Ž 58.8 Hz and
  • 61.2 Hz.

(continued)

LaSalle 1 and 2 3.8.1-16 Amendment No. 180 / 167

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.16 -- NOTE------------------

This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify each required DG: 24 months

a. Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power;
b. Transfers loads to offsite power source; and
c. Returns to ready-to-load operation.

(continued)

LaSalle I and 2 3.8.1-17 Amendment No. 180 /167

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.17 -------------------- NOTE------------------

This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify, with a required DG operating in 24 months test mode and connected to its bus:

a. For Division 1 and 2 DGs, an actual or simulated ECCS initiation signal overrides the test mode by returning DG to ready-to-load operation; and
b. For Division 3 DG, an actual or simulated DG overcurrent trip signal automatically disconnects the offsite power source while the DG continues to supply normal loads.

SR 3.8.1.18 --------------------- NOTE------------------

This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify interval between each sequenced load 24 months block, for Division 1 and 2 DGs only, is

Ž 90% of the design interval for each time delay relay.

(continued)

LaSalle 1 and 2 3.8.1-18 Amendment No. 18 0 /167

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.19 -------------------- NOTES-----------------

1. All DG starts may be preceded by an engine prelube period.
2. This Surveillance shall not normally be performed in MODE 1 or 2. However.,

portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify, on an actual or simulated loss of 24 months offsite power signal in conjunction with an actual or simulated ECCS initiation signal:

a. De-energization of emergency buses;
b. Load shedding from emergency buses for Divisions 1 and 2 only; and
c. DG auto-starts from standby condition and:
1. energizes permanently connected loads in
  • 13 seconds,
2. energizes auto-connected emergency loads including through time delay relays, where applicable,
3. maintains steady state voltage

Ž 4010 V and

  • 4310 V,
4. maintains steady state frequency 58.8 Hz and
  • 61.2 Hz, and
5. supplies permanently connected and auto-connected emergency loads for 5 minutes.

(continued)

LaSalle 1 and 2 3.8.1-19 Amendment No.180 /167

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.20 -------------------- NOTE------------------

All DG starts may be preceded by an engine prelube period.

Verify, when started simultaneously from 10 years standby condition, each required DG achieves, in

  • 13 seconds, voltage Ž 4010 V and frequency Ž 58.8 Hz.

SR 3.8.1.21 --------------------NOTE------------------

When the opposite unit is in MODE 4 or 5, or moving irradiated fuel assemblies in secondary containment, the following opposite unit SRs are not required to be performed: SR 3.8.1.3, SR 3.8.1.9 through SR 3.8.1.11, SR 3.8.1.14 through SR 3.8.1.16.

For required opposite unit DG, the SRs of In accordance the opposite unit's Specification 3.8.1, with applicable except SR 3.8.1.12, SR 3.8.1.13, SRs SR 3.8.1.17, SR 3.8.1.18, SR 3.8.1.19, and SR 3.8.1.20, are applicable.

LaSalle 1 and 2 3.8.1-20 Amendment No.180 /167