ML072060084: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/28/2007
| issue date = 08/28/2007
| title = Relief Request Concerning Request to Use Subsequent Edition of ASME Code
| title = Relief Request Concerning Request to Use Subsequent Edition of ASME Code
| author name = Boyce T H
| author name = Boyce T
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-2
| addressee name = Campbell W R
| addressee name = Campbell W
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000259
| docket = 05000259
Line 14: Line 14:
| page count = 8
| page count = 8
| project = TAC:MD5187
| project = TAC:MD5187
| stage = Request
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:August 28, 2007Mr. William R. Campbell, Jr.Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
{{#Wiki_filter:August 28, 2007 Mr. William R. Campbell, Jr.
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801


==SUBJECT:==
==SUBJECT:==
BROWNS FERRY NUCLEAR PLANT UNIT 1 - RELIEF REQUESTCONCERNING REQUEST TO USE SUBSEQUENT EDITION OF ASME CODE (TAC NO. MD5187)
BROWNS FERRY NUCLEAR PLANT UNIT 1 - RELIEF REQUEST CONCERNING REQUEST TO USE SUBSEQUENT EDITION OF ASME CODE (TAC NO. MD5187)


==Dear Mr. Campbell:==
==Dear Mr. Campbell:==


By a letter dated January 11, 2007, the Tennessee Valley Authority (TVA, the licensee)requested Nuclear Regulatory Commission (NRC) approval, pursuant to Title10 of the Code ofFederal Regulations, Section 50.55a(g)(4)(iv), to adopt a later version of the American Societyof Mechanical Engineers (ASME) Code for Browns Ferry Nuclear Plant Unit 1. Specifically, TVA proposed to adopt the requirements for repair and replacement activities specified in the 2001 Edition, 2003 Addenda of the ASME Section XI Code, Article IWA-4000 and all related requirements, as the code of record for the first 10-year inservice inspection (ISI) interval for Unit 1.Included in this request is a commitment from the licensee that when Unit 1 selects the optionof performing the system leakage test to satisfy the IWA-4540(a) requirements, the additional requirements for the nondestructive examination (NDE) method and acceptance criteria of the 1992 Edition or later of ASME Section III shall be met prior to returning the equipment toservice. The 2002 Addenda of Section XI had required NDE to be conducted when performing a system leakage test in support of repair and replacement activities performed by welding or brazing; the 2003 Addenda of Section XI removed this requirement. This commitment addressed an NRC staff concern regarding the 2003 Addenda. In the future,should the staff determine that the proposed limitation when performing system leakage tests after repair and replacement activities using the 2003 Addenda is not required, Unit 1 would no longer be bound by the requirement to perform NDE in accordance with IWA-4540(a)(2) of the 2002 Addenda. However, until that time, these requirements are a condition for the approval of this request.
By a letter dated January 11, 2007, the Tennessee Valley Authority (TVA, the licensee) requested Nuclear Regulatory Commission (NRC) approval, pursuant to Title10 of the Code of Federal Regulations, Section 50.55a(g)(4)(iv), to adopt a later version of the American Society of Mechanical Engineers (ASME) Code for Browns Ferry Nuclear Plant Unit 1. Specifically, TVA proposed to adopt the requirements for repair and replacement activities specified in the 2001 Edition, 2003 Addenda of the ASME Section XI Code, Article IWA-4000 and all related requirements, as the code of record for the first 10-year inservice inspection (ISI) interval for Unit 1.
W. Campbell, Jr.-2-Therefore, subject to the above condition, the licensee's request to use the later Code edition isapproved for the remainder of the first 10-year ISI interval at Unit 1, which ends May 22, 2008.
Included in this request is a commitment from the licensee that when Unit 1 selects the option of performing the system leakage test to satisfy the IWA-4540(a) requirements, the additional requirements for the nondestructive examination (NDE) method and acceptance criteria of the 1992 Edition or later of ASME Section III shall be met prior to returning the equipment to service. The 2002 Addenda of Section XI had required NDE to be conducted when performing a system leakage test in support of repair and replacement activities performed by welding or brazing; the 2003 Addenda of Section XI removed this requirement.
The NRC staff's evaluation is contained in the enclosed safety evaluation. Sincerely, /RA/Thomas H. Boyce, ChiefPlant Licensing Branch II-2Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-259  
This commitment addressed an NRC staff concern regarding the 2003 Addenda. In the future, should the staff determine that the proposed limitation when performing system leakage tests after repair and replacement activities using the 2003 Addenda is not required, Unit 1 would no longer be bound by the requirement to perform NDE in accordance with IWA-4540(a)(2) of the 2002 Addenda. However, until that time, these requirements are a condition for the approval of this request.
 
W. Campbell, Jr.                               Therefore, subject to the above condition, the licensees request to use the later Code edition is approved for the remainder of the first 10-year ISI interval at Unit 1, which ends May 22, 2008.
The NRC staffs evaluation is contained in the enclosed safety evaluation.
Sincerely,
                                            /RA/
Thomas H. Boyce, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259


==Enclosure:==
==Enclosure:==
Safety Evaluation cc w/encl: See next page  
Safety Evaluation cc w/encl: See next page
 
ML072060084                                          NRR-028 OFFICE LPL2-2/PM LPL2-2/LA              CPNB/BC            OGC                LPL2-2/BC NAME        EBrown    BClayton        TChan              EWilliamson        BMozafari for By memo dated      NLO as modified TBoyce DATE        08/28/07  08/28/07        07/23/07          08/09/07            08/28/07 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FIRST 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUEST TO USE PORTION OF SUBSEQUENT AMERICAN SOCIETY OF MECHANICAL ENGINEERS CODE EDITION FOR REPAIR/REPLACEMENT ACTIVITIES TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-259
 
==1.0 INTRODUCTION==
 
By letter dated January 11, 2007, the Tennessee Valley Authority (TVA, the licensee) requested Nuclear Regulatory Commission (NRC) approval, pursuant to Title10 of the Code of Federal Regulations (10 CFR), Section 50.55a(g)(4)(iv), to adopt a later version of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code for Browns Ferry Nuclear Plant (BFN) Unit 1. Specifically, TVA proposed to adopt the requirements for repair and replacement activities specified in the 2001 Edition through 2003 Addenda of the ASME Code, Section XI, Article IWA-4000 and all related requirements, as the code of record for the first 10-year inservice inspection (ISI) interval at Unit 1.
2.0 REGULATORY REQUIREMENTS The ISI of ASME Code Class 1, 2 and 3 components is to be performed in accordance with Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, of the ASME Code and applicable editions and addenda as required by 10 CFR 50.55a(g), except where specific written relief has been granted by the Commission.
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) must meet the requirements, except the design and access provisions and preservice examination requirements, set forth in the ASME Code, Section XI, to the extent practical within the limitations of design, geometry and materials of construction of the components.
The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in paragraph (b) of 10 CFR 50.55a on the date 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein.
Enclosure
 
Pursuant to 10 CFR 50.55a(g)(iv), inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (b) of 10 CFR 50.55a (or the optional ASME Code cases listed in NRC Regulatory Guide 1.147, through Revision 14, that are incorporated by reference in paragraph (b) of 10 CFR 50.55a), subject to the limitations and modifications listed in paragraph (b) of 10 CFR 50.55a, and subject to Commission approval. Portions of editions or addenda may be used provided that all related requirements of the respective editions or addenda are met. Also, subarticle IWA-4150(b) of the ASME Section XI Code allows use of later editions and addenda when the later editions and addenda have been accepted by the enforcement and regulatory authorities having jurisdiction at the plant site.


ML072060084NRR-028OFFICELPL2-2/PMLPL2-2/LACPNB/BCOGCLPL2-2/BCNAMEEBrownBClaytonTChanBy memo datedEWilliamson"NLO" as modifiedBMozafari forTBoyceDATE08/28/0708/28/0707/23/0708/09/0708/28/07 EnclosureSAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONFIRST 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLANREQUEST TO USE PORTION OF SUBSEQUENT AMERICAN SOCIETY OF MECHANICALENGINEERS CODE EDITION FOR REPAIR/REPLACEMENT ACTIVITIESTENNESSEE VALLEY AUTHORITYBROWNS FERRY NUCLEAR PLANT, UNIT 1DOCKET NO. 50-25
==3.0 TECHNICAL EVALUATION==


==91.0  INTRODUCTION==
3.1 ASME Code Requirement Pursuant to 10 CFR 50.55a, the ISI code of record for Unit 1 for the first 10-year interval is the 1995 Edition of the ASME Code, with 1996 Addenda. The first 10-year interval for Unit 1 is scheduled to end on May 22, 2008.
By letter dated January 11, 2007, the Tennessee Valley Authority (TVA, the licensee) requestedNuclear Regulatory Commission (NRC) approval, pursuant to Title10 of the Code of Federal Regulations (10 CFR), Section 50.55a(g)(4)(iv), to adopt a later version of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code for Browns Ferry Nuclear Plant (BFN) Unit 1. Specifically, TVA proposed to adopt the requirements for repair and replacement activities specified in the 2001 Edition through 2003 Addenda of the ASME Code, Section XI, Article IWA-4000 and all related requirements, as the code of record for the first 10-year inservice inspection (ISI) interval at Unit 1.2.0  REGULATORY REQUIREMENTSThe ISI of ASME Code Class 1, 2 and 3 components is to be performed in accordance withSection XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," of the ASME Code and applicable editions and addenda as required by 10 CFR 50.55a(g), except where specific written relief has been granted by the Commission. Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (includingsupports) must meet the requirements, except the design and access provisions and preservice examination requirements, set forth in the ASME Code, Section XI, to the extent practical within the limitations of design, geometry and materials of construction of the components.
3.2 Licensees Proposed Alternative The licensee requested approval to adopt the 2001 Edition through the 2003 Addenda of the ASME Section XI Code, Article IWA-4000 and all related requirements, for Unit 1.
The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in paragraph (b) of 10 CFR 50.55a on the date 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. Pursuant to 10 CFR 50.55a(g)(iv), inservice examination of components and system  pressuretests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (b) of 10 CFR 50.55a (or the optional ASME Code cases listed in NRC Regulatory Guide 1.147, through Revision 14, that are incorporated by reference in paragraph (b) of 10 CFR 50.55a), subject to the limitations and modifications listed in paragraph (b) of 10 CFR 50.55a, and subject to Commission approval. Portions of editions or addenda may be used provided that all related requirements of the respective editions or addenda are met. Also, subarticle IWA-4150(b) of the ASME Section XI Code allows use of later editions and addenda when the later editions and addenda have been accepted by the enforcement and regulatory authorities having jurisdiction at the plant site.
3.3 Licensees Bases for Alternative In accordance with the provisions of 10 CFR 50.55a(g)(4)(iv), and ASME Section XI, Subarticle IWA-4150(b), TVA seeks to adopt the requirements for repair and replacement activities specified in the 2001 Edition, 2003 Addenda of the ASME Code, Section XI, Article IWA-4000 and all related requirements, for Unit 1. Units 2 and 3 have adopted the 2001 ASME Section XI Code through 2003 Addenda, for the third 10-year interval. This requested change for Unit 1 would allow all three operating units at BFN to use the same ASME requirements for repair and replacement activities.
3.4 Staff Evaluation The licensee is requesting to use the 2001 Edition through 2003 Addenda of the ASME Section XI Code, Article IWA-4000 for repair and replacement activities in lieu of the same subarticle in the 1995 Edition, with 1996 Addenda of the Code. Use of the 2001 Edition through 2003 Addenda of the Code has been incorporated by reference in 10 CFR 50.55a(b)(2).
However, 10 CFR 50.55a also contains certain restrictions that apply to the 2001 Edition through the 2003 Addenda of the Section XI Code, specific to Article IWA-4000.
These restrictions will remain in effect. These include:
: 1. In accordance with 10 CFR 50.55a(b)(2)(xii), the provisions in IWA-4660, Underwater Welding, of Section XI 1997 Addenda through the latest edition and


==3.0  TECHNICAL EVALUATION==
addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a, are not approved for use on irradiated material.
3.1  ASME Code RequirementPursuant to 10 CFR 50.55a, the ISI code of record for Unit 1 for the first 10-year interval is the1995 Edition of the ASME Code, with 1996 Addenda. The first 10-year interval for Unit 1 is scheduled to end on May 22, 2008.
: 2. In accordance with 10 CFR 50.55a(b)(2)(xix), the provisions of IWA-4520(c),
1997 Addenda through the latest edition and addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a, allowing the substitution of alternative examination methods, a combination of methods, or newly developed techniques for the methods specified in the Construction Code are not approved for use.
: 3. In accordance with 10 CFR 50.55a(b)(2)(xxiii), the use of the provisions for eliminating mechanical processing of thermally cut surfaces in IWA-4461.4.2 of Section XI, 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a is prohibited.
: 4. In accordance with 10 CFR 50.55a(b)(2)(xxv), the use of the provisions in IWA-4340, Mitigation of Defects by Modification, Section XI, 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a is prohibited.
: 5. In accordance with 10 CFR 50.55a(b)(2)(xxvi), the repair and replacement activity provisions in IWA-4540(c) of the 1998 Edition of Section XI for pressure testing Class 1, 2, and 3 mechanical joints must be applied when using the 2001 Edition through the latest edition and addenda incorporated by references in paragraph (b)(2) of 10 CFR 50.55a.
In addition, the NRC staff is considering rulemaking that would require the nondestructive examination (NDE) provision in IWA-4540(a)(2) of the 2002 Addenda of Section XI to be applied when performing system leakage tests after repair and replacement activities performed by welding or brazing using the 2003 Addenda through the latest edition and addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a. The 2002 Addenda of Section XI had required NDE to be conducted when performing a system leakage test in support of repair and replacement activities performed by welding or brazing; the 2003 Addenda of Section XI removed this requirement. Until this requirement is added to 10 CFR 50.55a or until the NRC staff determines that the proposed limitation is not required, application of the NDE requirements will be a condition of NRC staff approval of requests to use the 2003 Addenda.
The licensee committed that when Unit 1 selects the option of performing the system leakage test to satisfy the IWA-4540(a) requirements, the additional requirements for the NDE method and acceptance criteria of the 1992 Edition or later of ASME Section III shall be met prior to returning the equipment to service.
Since the 2001 Edition through 2003 Addenda of the Code has been incorporated by reference in 10 CFR 50.55a(b)(2), with the restrictions identified in 10 CFR 50.55a, and because the licensee has agreed to perform the NDE under IWA-4540(a)(2) of the 2002 Addenda when performing system leakage tests after repair and replacement activities performed by welding or brazing, the NRC staff finds the licensees request acceptable.


===3.2 Licensee's===
==4.0 CONCLUSION==
Proposed AlternativeThe licensee requested approval to adopt the 2001 Edition through the 2003 Addenda of the ASME Section XI Code, Article IWA-4000 and all related requirements, for Unit 1. 3.3  Licensee's Bases for AlternativeIn accordance with the provisions of 10 CFR 50.55a(g)(4)(iv), and ASME Section XI,Subarticle IWA-4150(b), TVA seeks to adopt the requirements for repair and replacement activities specified in the 2001 Edition, 2003 Addenda of the ASME Code, Section XI, Article IWA-4000 and all related requirements, for Unit 1. Units 2 and 3 have adopted the 2001 ASME Section XI Code through 2003 Addenda, for the third 10-year interval. This requested change for Unit 1 would allow all three operating units at BFN to use the same ASME requirements for repair and replacement activities.3.4  Staff EvaluationThe licensee is requesting to use the 2001 Edition through 2003 Addenda of the ASMESection XI Code, Article IWA-4000 for repair and replacement activities in lieu of the same subarticle in the 1995 Edition, with 1996 Addenda of the Code. Use of the 2001 Edition through 2003 Addenda of the Code has been incorporated by reference in 10 CFR 50.55a(b)(2). However, 10 CFR 50.55a also contains certain restrictions that apply to the 2001 Editionthrough the 2003 Addenda of the Section XI Code, specific to Article IWA-4000.
These restrictions will remain in effect. These include:1.In accordance with 10 CFR 50.55a(b)(2)(xii), the provisions in IWA-4660,Underwater Welding, of Section XI 1997 Addenda through the latest edition and  addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a, are notapproved for use on irradiated material. 2.In accordance with 10 CFR 50.55a(b)(2)(xix), the provisions of IWA-4520(c),1997 Addenda through the latest edition and addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a, allowing the substitution of alternative examination methods, a combination of methods, or newly developed techniques for the methods specified in the Construction Code are not approved for use.3.In accordance with 10 CFR 50.55a(b)(2)(xxiii), the use of the provisions foreliminating mechanical processing of thermally cut surfaces in IWA-4461.4.2 of Section XI, 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a is prohibited.4.In accordance with 10 CFR 50.55a(b)(2)(xxv), the use of the provisions in IWA-4340,Mitigation of Defects by Modification, Section XI, 2001 Edition through the latestedition and addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a is prohibited.5.In accordance with 10 CFR 50.55a(b)(2)(xxvi), the repair and replacement activityprovisions in IWA-4540(c) of the 1998 Edition of Section XI for pressure testing Class 1, 2, and 3 mechanical joints must be applied when using the 2001 Edition through the latest edition and addenda incorporated by references in paragraph (b)(2) of 10 CFR 50.55a.In addition, the NRC staff is considering rulemaking that would require the nondestructiveexamination (NDE) provision in IWA-4540(a)(2) of the 2002 Addenda of Section XI to be applied when performing system leakage tests after repair and replacement activities performed by welding or brazing using the 2003 Addenda through the latest edition and addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a. The 2002 Addenda of Section XI had required NDE to be conducted when performing a system leakage test in support of repair and replacement activities performed by welding or brazing; the 2003 Addenda of Section XI removed this requirement. Until this requirement is added to 10 CFR 50.55a or until the NRC staff determines that the proposed limitation is not required, application of the NDE requirements will be a condition of NRC staff approval of requests to use the 2003 Addenda.


The licensee committed that when Unit 1 selects the option of performing the system leakage test to satisfy the IWA-4540(a) requirements, the additional requirements for the NDE method and acceptance criteria of the 1992 Edition or later of ASME Section III shall be met prior toreturning the equipment to service.Since the 2001 Edition through 2003 Addenda of the Code has been incorporated by referencein 10 CFR 50.55a(b)(2), with the restrictions identified in 10 CFR 50.55a, and because the licensee has agreed to perform the NDE under IWA-4540(a)(2) of the 2002 Addenda when performing system leakage tests after repair and replacement activities performed by welding or brazing, the NRC staff finds the licensee's request acceptable.
Pursuant to 10 CFR 50.55a(g)(4)(iv), the licensees request to use the 2001 Edition through 2003 Addenda of the ASME Code, Section XI, Article IWA-4000 along with all related ASME Code requirements as well as the applicable restrictions listed in 10 CFR 50.55a(b)(2) and the use of NDE in support of system leakage tests, in lieu of the 1995 Edition, 1996 Addenda of the Code, Section XI, Article IWA-4000, provides an acceptable level of quality and safety.
Therefore, the licensees use of the later Code edition and addenda is approved in accordance with 10 CFR 50.55a(a)(3)(i) for the first 10-year ISI interval for Unit 1, provided all related requirements of the 2001 Edition through 2003 Addenda are met for the Repair and Replacement program under IWA-4000, as modified by 10 CFR 50.55a, and NDE under IWA-4540(a)(2) of the 2002 Addenda are completed when performing system leakage tests after repair and replacement activities using the 2003 Addenda.
Principal Contributor: Jay Collins Date: August 28, 2007


==4.0  CONCLUSION==
Tennessee Valley Authority                BROWNS FERRY NUCLEAR PLANT cc:
Pursuant to 10 CFR 50.55a(g)(4)(iv), the licensee's request to use the 2001 Edition through2003 Addenda of the ASME Code, Section XI, Article IWA-4000 along with all related ASME Code requirements as well as the applicable restrictions listed in 10 CFR 50.55a(b)(2) and the use of NDE in support of system leakage tests, in lieu of the 1995 Edition, 1996 Addenda of the Code, Section XI, Article IWA-4000, provides an acceptable level of quality and safety.
Mr. Ashok S. Bhatnagar                   Ms. Beth A. Wetzel, Manager Senior Vice President                   Corporate Nuclear Licensing Nuclear Generation Development             and Industry Affairs and Construction                       Tennessee Valley Authority Tennessee Valley Authority              4X Blue Ridge 6A Lookout Place                         1101 Market Street 1101 Market Street                      Chattanooga, TN 37402-2801 Chattanooga, TN 37402-2801 Mr. David T. Langley, Manager Mr. James R. Douet                       Licensing and Industry Affairs Vice President                           Browns Ferry Nuclear Plant Nuclear Support                         Tennessee Valley Authority Tennessee Valley Authority              P.O. Box 2000 3R Lookout Place                         Decatur, AL 35609 1101 Market Street Chattanooga, TN 37402-2801               Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. Walter M. Justice II                Browns Ferry Nuclear Plant Interim Vice President                   10833 Shaw Road Nuclear Engineering & Technical Services Athens, AL 35611-6970 Tennessee Valley Authority 3R Lookout Place                         State Health Officer 1101 Market Street                       Alabama Dept. of Public Health Chattanooga, TN 37402-2801              RSA Tower - Administration Suite 1552 Brian J. OGrady, Site Vice President    P.O. Box 303017 Browns Ferry Nuclear Plant               Montgomery, AL 36130-3017 Tennessee Valley Authority P.O. Box 2000                           Chairman Decatur, AL 35609                        Limestone County Commission 310 West Washington Street General Counsel                          Athens, AL 35611 Tennessee Valley Authority 6A West Tower                           Mr. Robert H. Bryan, Jr., General Manager 400 West Summit Hill Drive               Licensing and Industry Affairs Knoxville, TN 37902                      Tennessee Valley Authority 4X Blue Ridge Mr. John C. Fornicola, General Manager  1101 Market Street Nuclear Assurance                       Chattanooga, TN 37402-2801 Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Robert G. Jones, General Manager Browns Ferry Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609}}
Therefore, the licensee's use of the later Code edition and addenda is approved in accordance with 10 CFR 50.55a(a)(3)(i) for the first 10-year ISI interval for Unit 1, provided all related requirements of the 2001 Edition through 2003 Addenda are met for the Repair and Replacement program under IWA-4000, as modified by 10 CFR 50.55a, and NDE under IWA-4540(a)(2) of the 2002 Addenda are completed when performing system leakage tests after repair and replacement activities using the 2003 Addenda. Principal Contributor: Jay CollinsDate:August 28, 2007 Tennessee Valley AuthorityBROWNS FERRY NUCLEAR PLANT cc:Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801   Mr. James R. Douet Vice President Nuclear Support Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801   Mr. Walter M. Justice IIInterim Vice President Nuclear Engineering & Technical Services Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801Brian J. O'Grady, Site Vice PresidentBrowns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609General CounselTennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN 37902Mr. John C. Fornicola, General ManagerNuclear Assurance Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801Mr. Robert G. Jones, General ManagerBrowns Ferry Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609Ms. Beth A. Wetzel, ManagerCorporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN  37402-2801Mr. David T. Langley, ManagerLicensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609Senior Resident InspectorU.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970State Health OfficerAlabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017ChairmanLimestone County Commission 310 West Washington Street Athens, AL  35611Mr. Robert H. Bryan, Jr., General ManagerLicensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN  37402-2801}}

Latest revision as of 13:37, 13 March 2020

Relief Request Concerning Request to Use Subsequent Edition of ASME Code
ML072060084
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 08/28/2007
From: Boyce T
NRC/NRR/ADRO/DORL/LPLII-2
To: Campbell W
Tennessee Valley Authority
Brown Eva, NRR/DORL, 415-2315
References
TAC MD5187
Download: ML072060084 (8)


Text

August 28, 2007 Mr. William R. Campbell, Jr.

Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT UNIT 1 - RELIEF REQUEST CONCERNING REQUEST TO USE SUBSEQUENT EDITION OF ASME CODE (TAC NO. MD5187)

Dear Mr. Campbell:

By a letter dated January 11, 2007, the Tennessee Valley Authority (TVA, the licensee) requested Nuclear Regulatory Commission (NRC) approval, pursuant to Title10 of the Code of Federal Regulations, Section 50.55a(g)(4)(iv), to adopt a later version of the American Society of Mechanical Engineers (ASME) Code for Browns Ferry Nuclear Plant Unit 1. Specifically, TVA proposed to adopt the requirements for repair and replacement activities specified in the 2001 Edition, 2003 Addenda of the ASME Section XI Code, Article IWA-4000 and all related requirements, as the code of record for the first 10-year inservice inspection (ISI) interval for Unit 1.

Included in this request is a commitment from the licensee that when Unit 1 selects the option of performing the system leakage test to satisfy the IWA-4540(a) requirements, the additional requirements for the nondestructive examination (NDE) method and acceptance criteria of the 1992 Edition or later of ASME Section III shall be met prior to returning the equipment to service. The 2002 Addenda of Section XI had required NDE to be conducted when performing a system leakage test in support of repair and replacement activities performed by welding or brazing; the 2003 Addenda of Section XI removed this requirement.

This commitment addressed an NRC staff concern regarding the 2003 Addenda. In the future, should the staff determine that the proposed limitation when performing system leakage tests after repair and replacement activities using the 2003 Addenda is not required, Unit 1 would no longer be bound by the requirement to perform NDE in accordance with IWA-4540(a)(2) of the 2002 Addenda. However, until that time, these requirements are a condition for the approval of this request.

W. Campbell, Jr. Therefore, subject to the above condition, the licensees request to use the later Code edition is approved for the remainder of the first 10-year ISI interval at Unit 1, which ends May 22, 2008.

The NRC staffs evaluation is contained in the enclosed safety evaluation.

Sincerely,

/RA/

Thomas H. Boyce, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259

Enclosure:

Safety Evaluation cc w/encl: See next page

ML072060084 NRR-028 OFFICE LPL2-2/PM LPL2-2/LA CPNB/BC OGC LPL2-2/BC NAME EBrown BClayton TChan EWilliamson BMozafari for By memo dated NLO as modified TBoyce DATE 08/28/07 08/28/07 07/23/07 08/09/07 08/28/07 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FIRST 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUEST TO USE PORTION OF SUBSEQUENT AMERICAN SOCIETY OF MECHANICAL ENGINEERS CODE EDITION FOR REPAIR/REPLACEMENT ACTIVITIES TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-259

1.0 INTRODUCTION

By letter dated January 11, 2007, the Tennessee Valley Authority (TVA, the licensee) requested Nuclear Regulatory Commission (NRC) approval, pursuant to Title10 of the Code of Federal Regulations (10 CFR), Section 50.55a(g)(4)(iv), to adopt a later version of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code for Browns Ferry Nuclear Plant (BFN) Unit 1. Specifically, TVA proposed to adopt the requirements for repair and replacement activities specified in the 2001 Edition through 2003 Addenda of the ASME Code,Section XI, Article IWA-4000 and all related requirements, as the code of record for the first 10-year inservice inspection (ISI) interval at Unit 1.

2.0 REGULATORY REQUIREMENTS The ISI of ASME Code Class 1, 2 and 3 components is to be performed in accordance with Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, of the ASME Code and applicable editions and addenda as required by 10 CFR 50.55a(g), except where specific written relief has been granted by the Commission.

Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) must meet the requirements, except the design and access provisions and preservice examination requirements, set forth in the ASME Code,Section XI, to the extent practical within the limitations of design, geometry and materials of construction of the components.

The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in paragraph (b) of 10 CFR 50.55a on the date 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein.

Enclosure

Pursuant to 10 CFR 50.55a(g)(iv), inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (b) of 10 CFR 50.55a (or the optional ASME Code cases listed in NRC Regulatory Guide 1.147, through Revision 14, that are incorporated by reference in paragraph (b) of 10 CFR 50.55a), subject to the limitations and modifications listed in paragraph (b) of 10 CFR 50.55a, and subject to Commission approval. Portions of editions or addenda may be used provided that all related requirements of the respective editions or addenda are met. Also, subarticle IWA-4150(b) of the ASME Section XI Code allows use of later editions and addenda when the later editions and addenda have been accepted by the enforcement and regulatory authorities having jurisdiction at the plant site.

3.0 TECHNICAL EVALUATION

3.1 ASME Code Requirement Pursuant to 10 CFR 50.55a, the ISI code of record for Unit 1 for the first 10-year interval is the 1995 Edition of the ASME Code, with 1996 Addenda. The first 10-year interval for Unit 1 is scheduled to end on May 22, 2008.

3.2 Licensees Proposed Alternative The licensee requested approval to adopt the 2001 Edition through the 2003 Addenda of the ASME Section XI Code, Article IWA-4000 and all related requirements, for Unit 1.

3.3 Licensees Bases for Alternative In accordance with the provisions of 10 CFR 50.55a(g)(4)(iv), and ASME Section XI, Subarticle IWA-4150(b), TVA seeks to adopt the requirements for repair and replacement activities specified in the 2001 Edition, 2003 Addenda of the ASME Code,Section XI, Article IWA-4000 and all related requirements, for Unit 1. Units 2 and 3 have adopted the 2001 ASME Section XI Code through 2003 Addenda, for the third 10-year interval. This requested change for Unit 1 would allow all three operating units at BFN to use the same ASME requirements for repair and replacement activities.

3.4 Staff Evaluation The licensee is requesting to use the 2001 Edition through 2003 Addenda of the ASME Section XI Code, Article IWA-4000 for repair and replacement activities in lieu of the same subarticle in the 1995 Edition, with 1996 Addenda of the Code. Use of the 2001 Edition through 2003 Addenda of the Code has been incorporated by reference in 10 CFR 50.55a(b)(2).

However, 10 CFR 50.55a also contains certain restrictions that apply to the 2001 Edition through the 2003 Addenda of the Section XI Code, specific to Article IWA-4000.

These restrictions will remain in effect. These include:

1. In accordance with 10 CFR 50.55a(b)(2)(xii), the provisions in IWA-4660, Underwater Welding, of Section XI 1997 Addenda through the latest edition and

addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a, are not approved for use on irradiated material.

2. In accordance with 10 CFR 50.55a(b)(2)(xix), the provisions of IWA-4520(c),

1997 Addenda through the latest edition and addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a, allowing the substitution of alternative examination methods, a combination of methods, or newly developed techniques for the methods specified in the Construction Code are not approved for use.

3. In accordance with 10 CFR 50.55a(b)(2)(xxiii), the use of the provisions for eliminating mechanical processing of thermally cut surfaces in IWA-4461.4.2 of Section XI, 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a is prohibited.
4. In accordance with 10 CFR 50.55a(b)(2)(xxv), the use of the provisions in IWA-4340, Mitigation of Defects by Modification,Section XI, 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a is prohibited.
5. In accordance with 10 CFR 50.55a(b)(2)(xxvi), the repair and replacement activity provisions in IWA-4540(c) of the 1998 Edition of Section XI for pressure testing Class 1, 2, and 3 mechanical joints must be applied when using the 2001 Edition through the latest edition and addenda incorporated by references in paragraph (b)(2) of 10 CFR 50.55a.

In addition, the NRC staff is considering rulemaking that would require the nondestructive examination (NDE) provision in IWA-4540(a)(2) of the 2002 Addenda of Section XI to be applied when performing system leakage tests after repair and replacement activities performed by welding or brazing using the 2003 Addenda through the latest edition and addenda incorporated by reference in paragraph (b)(2) of 10 CFR 50.55a. The 2002 Addenda of Section XI had required NDE to be conducted when performing a system leakage test in support of repair and replacement activities performed by welding or brazing; the 2003 Addenda of Section XI removed this requirement. Until this requirement is added to 10 CFR 50.55a or until the NRC staff determines that the proposed limitation is not required, application of the NDE requirements will be a condition of NRC staff approval of requests to use the 2003 Addenda.

The licensee committed that when Unit 1 selects the option of performing the system leakage test to satisfy the IWA-4540(a) requirements, the additional requirements for the NDE method and acceptance criteria of the 1992 Edition or later of ASME Section III shall be met prior to returning the equipment to service.

Since the 2001 Edition through 2003 Addenda of the Code has been incorporated by reference in 10 CFR 50.55a(b)(2), with the restrictions identified in 10 CFR 50.55a, and because the licensee has agreed to perform the NDE under IWA-4540(a)(2) of the 2002 Addenda when performing system leakage tests after repair and replacement activities performed by welding or brazing, the NRC staff finds the licensees request acceptable.

4.0 CONCLUSION

Pursuant to 10 CFR 50.55a(g)(4)(iv), the licensees request to use the 2001 Edition through 2003 Addenda of the ASME Code,Section XI, Article IWA-4000 along with all related ASME Code requirements as well as the applicable restrictions listed in 10 CFR 50.55a(b)(2) and the use of NDE in support of system leakage tests, in lieu of the 1995 Edition, 1996 Addenda of the Code,Section XI, Article IWA-4000, provides an acceptable level of quality and safety.

Therefore, the licensees use of the later Code edition and addenda is approved in accordance with 10 CFR 50.55a(a)(3)(i) for the first 10-year ISI interval for Unit 1, provided all related requirements of the 2001 Edition through 2003 Addenda are met for the Repair and Replacement program under IWA-4000, as modified by 10 CFR 50.55a, and NDE under IWA-4540(a)(2) of the 2002 Addenda are completed when performing system leakage tests after repair and replacement activities using the 2003 Addenda.

Principal Contributor: Jay Collins Date: August 28, 2007

Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT cc:

Mr. Ashok S. Bhatnagar Ms. Beth A. Wetzel, Manager Senior Vice President Corporate Nuclear Licensing Nuclear Generation Development and Industry Affairs and Construction Tennessee Valley Authority Tennessee Valley Authority 4X Blue Ridge 6A Lookout Place 1101 Market Street 1101 Market Street Chattanooga, TN 37402-2801 Chattanooga, TN 37402-2801 Mr. David T. Langley, Manager Mr. James R. Douet Licensing and Industry Affairs Vice President Browns Ferry Nuclear Plant Nuclear Support Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 3R Lookout Place Decatur, AL 35609 1101 Market Street Chattanooga, TN 37402-2801 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. Walter M. Justice II Browns Ferry Nuclear Plant Interim Vice President 10833 Shaw Road Nuclear Engineering & Technical Services Athens, AL 35611-6970 Tennessee Valley Authority 3R Lookout Place State Health Officer 1101 Market Street Alabama Dept. of Public Health Chattanooga, TN 37402-2801 RSA Tower - Administration Suite 1552 Brian J. OGrady, Site Vice President P.O. Box 303017 Browns Ferry Nuclear Plant Montgomery, AL 36130-3017 Tennessee Valley Authority P.O. Box 2000 Chairman Decatur, AL 35609 Limestone County Commission 310 West Washington Street General Counsel Athens, AL 35611 Tennessee Valley Authority 6A West Tower Mr. Robert H. Bryan, Jr., General Manager 400 West Summit Hill Drive Licensing and Industry Affairs Knoxville, TN 37902 Tennessee Valley Authority 4X Blue Ridge Mr. John C. Fornicola, General Manager 1101 Market Street Nuclear Assurance Chattanooga, TN 37402-2801 Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Robert G. Jones, General Manager Browns Ferry Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609