(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 10/19/2007 | | | issue date = 10/19/2007 |
| | title = Draft RAI RA: Response to GL 2007-01 | | | title = Draft RAI RA: Response to GL 2007-01 |
| | author name = Tam P S | | | author name = Tam P |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1 |
| | addressee name = Arias J, Loeffler R, Weinkam E J | | | addressee name = Arias J, Loeffler R, Weinkam E |
| | addressee affiliation = Nuclear Management Co, LLC | | | addressee affiliation = Nuclear Management Co, LLC |
| | docket = 05000263 | | | docket = 05000263 |
| | license number = DPR-022 | | | license number = DPR-022 |
| | contact person = tam P S, NRR/ADRO/DORL, 415-1451 | | | contact person = tam P, NRR/ADRO/DORL, 415-1451 |
| | case reference number = IR-98-009, TAC MD4348 | | | case reference number = IR-98-009, TAC MD4348 |
| | document type = E-Mail | | | document type = E-Mail |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: Peter Tam To: Edward J. Weinkam; Jesus Arias; Rick Loeffler Date: 10/19/2007 3:11:22 PM | | {{#Wiki_filter:From: Peter Tam To: Edward J. Weinkam; Jesus Arias; Rick Loeffler Date: 10/19/2007 3:11:22 PM |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Monticello: Draft RAI re. response to GL 2007-01 (TAC MD4348) | | Monticello: Draft RAI re. response to GL 2007-01 (TAC MD4348) |
| Jay: | | Jay: |
| | The NRC staff has reviewed your 5/7/07 response to GL2007-01 re. inaccessible or underground power cable failures that disable accident mitigation systems or cause plant transients. The NRC staff has determined that the following additional information is necessary to clarify the information that you provided in the response. Please contact me to set up a conference call to discuss the following draft RAI questions: |
| | (1) The NRC staff has received the cable failure history for Monticello in response to GL 2007 01, "Inaccessible or Underground Power Cable Failures that Disable Accident Mitigation Systems or Cause Plant Transients." The licensee found a power cable failure within the scope of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.65, Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants (Maintenance Rule (MR)). Specifically, the licensee found a power cable failure that occurred in 1997 in the 480V feeders to off-gas storage Motor Control Centers. In addition, NRC Inspection Report 50-263/98-09 discussed a previous failure of the cables feeding the off-gas storage building that occurred in 1994. Please provide the information requested in GL 2007-01 for the 1994 cable failure, or justify why it is not within the scope of the GL. |
| | (2) In Corrective Action Program document CAP037776 and Condition Evaluation CE12033 for Monticello, the licensee discussed the testing failure of a recirculation motor generator set cable that was routed below the turbine building. Please provide the information requested in GL 2007 01 if the cable failure is within the scope of the GL, or justify why the failure is not within the scope of the GL. |
| | Note that the NRC provided additional guidance on how licensees should determine which cable failures are within the scope of GL 2007 01 in the NRC letter dated April 13, 2007, from Michael J. Case (NRC) to James H. Riley of the Nuclear Energy Institute (NRC Accession No. ML070940311). |
| | The sole purpose of this e-mail is to prepare you and others for the proposed conference call. |
| | This e-mail does not convey a formal NRC staff position, and does not formally request for additional information. During the conference call, we will discuss disposition options of the above draft questions, e.g., whether to issue them formally or not. |
| | Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation e-mail: pst@nrc.gov Tel.: 301-415-1451 CC: Audrey Klett; Jay Robinson |
|
| |
|
| The NRC staff has reviewed your 5/7/07 response to GL2007-01 re. inaccessible or underground power cable failures that disable accident mitigation systems or cause plant transients. The NRC staff has determined that the following additional information is necessary to clarify the information that you provided in the response. Please contact me to set up a conference call to discuss the following draft RAI questions:
| | Mail Envelope Properties (4719015A.D6A : 12 : 35330) |
| | |
| (1) The NRC staff has received the cable failure history for Monticello in response to GL 2007 01, "Inaccessible or Underground Power Cable Failures that Disable Accident Mitigation Systems or Cause Plant Transients." The licensee found a power cable failure within the scope of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.65, Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants (Maintenance Rule (MR)). Specifically, the licensee found a power cable failure that occurred in 1997 in the 480V feeders to off-gas storage Motor Control Centers. In addition, NRC Inspection Report 50-263/98-09 discussed a previous failure of the cables feeding the off-gas storage building that occurred in 1994. Please provide the information requested in GL 2007-01 for the 1994 cable failure, or justify why it is not within the scope of the GL.
| |
| | |
| (2) In Corrective Action Program document CAP037776 and Condition Evaluation CE12033 for Monticello, the licensee discussed the testing failure of a recirculation motor generator set cable that was routed below the turbine building. Please provide the information requested in GL 2007 01 if the cable failure is within the scope of the GL, or justify why the failure is not within the scope of the GL.
| |
| | |
| Note that the NRC provided additional guidance on how licensees should determine which cable failures are within the scope of GL 2007 01 in the NRC letter dated April 13, 2007, from Michael J. Case (NRC) to James H. Riley of the Nuclear Energy Institute (NRC Accession No.
| |
| ML070940311).
| |
| | |
| The sole purpose of this e-mail is to prepare you and others for the proposed conference call. This e-mail does not convey a formal NRC staff position, and does not formally request for additional information. During the conference call, we will discuss disposition options of the above draft questions, e.g., whether to issue them formally or not.
| |
| | |
| Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
| |
| | |
| e-mail: pst@nrc.gov Tel.: 301-415-1451
| |
| | |
| CC: Audrey Klett; Jay Robinson Mail Envelope Properties (4719015A.D6A : 12 : 35330)
| |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Monticello: Draft RAI re. response to GL 2007-01 (TAC MD4348) | | Monticello: Draft RAI re. response to GL 2007-01 (TAC MD4348) |
| Creation Date 10/19/2007 3:11:22 PM From: Peter Tam Created By: PST@nrc.gov Recipients Action Date & Time nmcco.com Transferred 10/19/2007 3:11:46 PM Edward.Weinkam (Edward J. Weinkam) | | Creation Date 10/19/2007 3:11:22 PM From: Peter Tam Created By: PST@nrc.gov Recipients Action Date & Time nmcco.com Transferred 10/19/2007 3:11:46 PM Edward.Weinkam (Edward J. Weinkam) |
| | |
| Jesus.Arias (Jesus Arias) | | Jesus.Arias (Jesus Arias) |
| Richard.Loeffler (Rick Loeffler) | | Richard.Loeffler (Rick Loeffler) nrc.gov OWGWPO04.HQGWDO01 Delivered 10/19/2007 3:11:27 PM ALK1 CC (Audrey Klett) Opened 10/19/2007 3:28:35 PM nrc.gov TWGWPO03.HQGWDO01 Delivered 10/19/2007 3:11:27 PM JER8 CC (Jay Robinson) Opened 10/19/2007 3:11:53 PM Post Office Delivered Route nmcco.com OWGWPO04.HQGWDO01 10/19/2007 3:11:27 PM nrc.gov TWGWPO03.HQGWDO01 10/19/2007 3:11:27 PM nrc.gov Files Size Date & Time MESSAGE 4143 10/19/2007 3:11:22 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed |
| | |
| nrc.gov OWGWPO04.HQGWDO01 Delivered 10/19/2007 3:11:27 PM ALK1 CC (Audrey Klett) Opened 10/19/2007 3:28:35 PM | |
| | |
| nrc.gov TWGWPO03.HQGWDO01 Delivered 10/19/2007 3:11:27 PM JER8 CC (Jay Robinson) Opened 10/19/2007 3:11:53 PM Post Office Delivered Route nmcco.com OWGWPO04.HQGWDO01 10/19/2007 3:11:27 PM nrc.gov TWGWPO03.HQGWDO01 10/19/2007 3:11:27 PM nrc.gov | |
| | |
| Files Size Date & Time MESSAGE 4143 10/19/2007 3:11:22 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened}} | | No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened}} |
Letter Sequence Draft RAI |
---|
|
|
|
|
---|
Category:E-Mail
MONTHYEARML24022A0212024-01-20020 January 2024 NRR E-mail Capture - Monticello - Request for Additional Information ISI RR-002 Alternative to Use IWB-2500(f) ML23353A0742023-12-19019 December 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Proposed Alternative VR-09, Modifications to OMN-17 ML23348A3462023-12-14014 December 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of License Amendment Request to Revise TS 3.8.6, Battery Parameters, SR 3.8.6.6 ML23268A0292023-09-20020 September 2023 SLRA - Requests for Confirmation of Information - Set 2 - Email from Marieliz Johnson to Shawn Hafen ML23249A2092023-09-0606 September 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23237A4822023-08-25025 August 2023 SLRA - Request for Additional Information - Set 3 - Email from Marieliz Johnson to Shawn Hafen ML23228A1212023-08-16016 August 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Alternative Request VR-11 for MO-2397 ML23227A2182023-08-15015 August 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Alternative Request RR-002 to Use IWB-2500(f) ML23219A1072023-08-0707 August 2023 SLRA - Requests for Additional Information - Set 2 - Email from Marieliz Johnson to Shawn Hafen ML23200A3502023-07-19019 July 2023 SLRA - Requests for Additional Information - Set 1 - Email from Marieliz Johnson to Christopher Domingos ML23172A1122023-06-21021 June 2023 SLRA - Requests for Confirmation of Information - Set 1 - Email from Marieliz Johnson to Christopher Domingos ML23054A3322023-02-23023 February 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Relief Request to Use Later Edition of ASME BPV Code, Section XI, for ISI Program Code of Record ML23053A1362023-02-13013 February 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Relief Request to Use Later Edition of ASME BPV Code, Section XI, for Cisi Program ML23017A2222023-01-13013 January 2023 Verbal Authorization of Proposed Alternative PR-08 Regarding Inservice Testing Requirements of Certain High Pressure Coolant Injection System Components (EPID L-2022-LLR-0088) (Email) ML23004A1982023-01-0404 January 2023 NRR E-mail Capture - Draft Request for Additional Information Monticello Nuclear Generating Plant Request Pr 08, HPCI Pump Quarterly Testing ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package ML22181A1962022-06-24024 June 2022 NRR E-mail Capture - Draft RAI Monticello Alternative VR-08 ML22175A1602022-06-24024 June 2022 NRR E-mail Capture - RAI Monticello Fuel Oil Storage Tank Inspection ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML22123A2822022-05-0303 May 2022 NRR E-mail Capture - Request for Additional Information Monticello Alternative VR-10, EFCV Testing Frequency ML22101A0712022-04-11011 April 2022 NRR E-mail Capture - Monticello - Acceptance of Requested Licensing Action License Amendment Request to Revise TS 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency ML22089A1302022-03-30030 March 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Alternative Related Excess Flow Check Valve Testing Frequency ML22082A1812022-03-23023 March 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of VR-08 Alternative to Adopt ASME OM Code Case OMN-28 ML22075A2612022-03-16016 March 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of VR-07 Alternative Related to MOV Testing Per ASME OM Code Case OMN-26 ML22067A2032022-03-0808 March 2022 Audit Plan to Support Review of an Amendment to Transition to Atrium 11 Fuel (Redacted) ML22011A0642022-01-11011 January 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action License Amendment Request to Support Diesel Generator Fuel Oil Storage Tank Inspection ML22005A3612022-01-0505 January 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Pump Vibration Testing Per ASME OM Code Case OMN-22 ML21347A0082021-12-10010 December 2021 NRR E-mail Capture - Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested License Amendment Standard Emergency Plan and Consolidated Emergency Operations Facility ML21330A0382021-11-18018 November 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related RHR and RHRSW Pump Testing ML21286A7882021-10-0606 October 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Residual Heat Removal Heat Exchanger Flow Control Valve Stroke Timing ML21256A1892021-09-13013 September 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Testing the Control Rod Drive Scram Discharge Header Check Valves ML21256A1862021-09-13013 September 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to HPCI and RCIC Pump Testing ML21256A1882021-09-13013 September 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Vibration Testing Range for the Sblc Pumps ML21253A2002021-09-10010 September 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Pressure Isolation Valve Testing ML21252A0132021-08-31031 August 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action License Amendment Request to Adopt Advanced Framatome Methodologies ML21130A3022021-05-0707 May 2021 Initial and Final Written 10 CFR 21 Notification for GE Hitachi Numac Prnm System ML21110A7042021-04-20020 April 2021 Response: Monticello Nuclear Plant Outage - Covid Risk to On-Site Employees ML21084A2522021-03-24024 March 2021 NRR E-mail Capture - Revised Review Schedule for Monticello TSTF-505 (EPID L-20200LLA-0062) ML21068A2772021-03-0909 March 2021 NRR E-mail Capture - Monticello TSTF-505, Request for Additional Information ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20342A1782020-12-0707 December 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-564 Safety Limit MCPR ML20302A1972020-10-26026 October 2020 NRR E-mail Capture - Monticello Request for Additional Information TSTF-505 License Amendment Request ML20289A1072020-10-0606 October 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-582 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements (EPID L-2020-LLA-0209 ML20191A0252020-07-0101 July 2020 NRR E-mail Capture - Draft Request for Additional Information Monticello Alternative Request RR-016 Related to H8, H9, and H 10 Weld Examinations ML20120A0272020-04-28028 April 2020 NRR E-mail Capture - Request for Additional Information Monticello Long Term Steam Dryer Inspection Plan ML20099F1292020-04-0606 April 2020 E-mail to Licensee for Monticello Lr Phase 4 RFI ML20077L4632020-03-17017 March 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 -Acceptance of Requested Licensing Action Request to Adopt TSTF-529 ML20064C5352020-03-0404 March 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Revise the Previously Authorized Alternative in RR-008 for the H8 and H9 Welds 2024-01-20
[Table view] |
Text
From: Peter Tam To: Edward J. Weinkam; Jesus Arias; Rick Loeffler Date: 10/19/2007 3:11:22 PM
Subject:
Monticello: Draft RAI re. response to GL 2007-01 (TAC MD4348)
Jay:
The NRC staff has reviewed your 5/7/07 response to GL2007-01 re. inaccessible or underground power cable failures that disable accident mitigation systems or cause plant transients. The NRC staff has determined that the following additional information is necessary to clarify the information that you provided in the response. Please contact me to set up a conference call to discuss the following draft RAI questions:
(1) The NRC staff has received the cable failure history for Monticello in response to GL 2007 01, "Inaccessible or Underground Power Cable Failures that Disable Accident Mitigation Systems or Cause Plant Transients." The licensee found a power cable failure within the scope of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.65, Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants (Maintenance Rule (MR)). Specifically, the licensee found a power cable failure that occurred in 1997 in the 480V feeders to off-gas storage Motor Control Centers. In addition, NRC Inspection Report 50-263/98-09 discussed a previous failure of the cables feeding the off-gas storage building that occurred in 1994. Please provide the information requested in GL 2007-01 for the 1994 cable failure, or justify why it is not within the scope of the GL.
(2) In Corrective Action Program document CAP037776 and Condition Evaluation CE12033 for Monticello, the licensee discussed the testing failure of a recirculation motor generator set cable that was routed below the turbine building. Please provide the information requested in GL 2007 01 if the cable failure is within the scope of the GL, or justify why the failure is not within the scope of the GL.
Note that the NRC provided additional guidance on how licensees should determine which cable failures are within the scope of GL 2007 01 in the NRC letter dated April 13, 2007, from Michael J. Case (NRC) to James H. Riley of the Nuclear Energy Institute (NRC Accession No. ML070940311).
The sole purpose of this e-mail is to prepare you and others for the proposed conference call.
This e-mail does not convey a formal NRC staff position, and does not formally request for additional information. During the conference call, we will discuss disposition options of the above draft questions, e.g., whether to issue them formally or not.
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation e-mail: pst@nrc.gov Tel.: 301-415-1451 CC: Audrey Klett; Jay Robinson
Mail Envelope Properties (4719015A.D6A : 12 : 35330)
Subject:
Monticello: Draft RAI re. response to GL 2007-01 (TAC MD4348)
Creation Date 10/19/2007 3:11:22 PM From: Peter Tam Created By: PST@nrc.gov Recipients Action Date & Time nmcco.com Transferred 10/19/2007 3:11:46 PM Edward.Weinkam (Edward J. Weinkam)
Jesus.Arias (Jesus Arias)
Richard.Loeffler (Rick Loeffler) nrc.gov OWGWPO04.HQGWDO01 Delivered 10/19/2007 3:11:27 PM ALK1 CC (Audrey Klett) Opened 10/19/2007 3:28:35 PM nrc.gov TWGWPO03.HQGWDO01 Delivered 10/19/2007 3:11:27 PM JER8 CC (Jay Robinson) Opened 10/19/2007 3:11:53 PM Post Office Delivered Route nmcco.com OWGWPO04.HQGWDO01 10/19/2007 3:11:27 PM nrc.gov TWGWPO03.HQGWDO01 10/19/2007 3:11:27 PM nrc.gov Files Size Date & Time MESSAGE 4143 10/19/2007 3:11:22 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened