| issue date = 05/27/2010
| issue date = 05/27/2010
| title = Submittal of Revision 17 to Physical Security Plan
| title = Submittal of Revision 17 to Physical Security Plan
| author name = Goodell J R
| author name = Goodell J
| author affiliation = Omaha Public Power District
| author affiliation = Omaha Public Power District
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:S AFEGUARDS INFORMATION Omaha Public Power Oistnct Fort Calhoun Station 9610 Power Lane Blair, NE 68008 May 27, 2010 LIC-10-0036U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
{{#Wiki_filter:~~                                        S AFEGUARDS INFORMATION SAFEGUARDS        INFORMATION iiililii Omaha Public Omaha        --
PublicPower District PowerOistnct Fort Calhoun Fort   Calhoun Station Station 9610 Power 9610   Power Lane Blair, Blair,NE 68008 68008 May 27, 2010 May            2010 '
LI C-1 0-0036 LIC-10-0036 U. S. Nuclear U.        Nuclear Regulatory Regulatory Commission Commission ATTN: Document Document Control Desk Washington, DC 20555-0001 Washington,


==References:==
==References:==
: 1.                  50-285 Docket No. 50-285
: 2. NEI 03-12, "Security Plan, Plan, Training and Qualification                Safeguards Qualification Plan, and Safeguards Contingency Plan," Revision 6, dated June 2004 Contingency                                      2004
: 3. Federal  Register Notice, Federal Register    Notice, "Power Reactor                Requirements; Final Reactor Security Requirements; Rule," dated March 27, 2009 (74 FR 13926)13926)
: 4. Letter from OPPD (J. A. Reinhart) to NRC (Document Control Desk),
                                        "Request for Exemption Exemption from Physical Security Security Requirements," date December December 31,    2009 (LIC-09-0071) 31,2009  (L1C-09-0071)


==SUBJECT:==
==SUBJECT:==
: 1. Docket No. 50-285 2. NEI 03-12, "Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan," Revision 6, dated June 2004 3. Federal Register Notice, "Power Reactor Security Requirements; Final Rule," dated March 27, 2009 (74 FR 13926)4. Letter from OPPD (J. A. Reinhart) to NRC (Document Control Desk),"Request for Exemption from Physical Security Requirements," date December 31, 2009 (LIC-09-0071)
Submittal of Revision 17 to the Fort Calhoun Station                 (FCS), Unit No.1, Station (FCS),            No. 1, Physical Physical    Security   Plan (PSP)
Submittal of Revision 17 to the Fort Calhoun Station (FCS), Unit No. 1, Physical Security Plan (PSP)The Omaha Public Power District (OPPD) hereby provides the U. S. Nuclear Regulatory Commission (NRC) with a copy of Revision 17 to the FCS PSP issued in May 2010. These changes were necessary due to the new Rule (Reference  
The OmahaOmaha Public Power        Power District (OPPD) hereby hereby provides the U. U. S. Nuclear Nuclear Regulatory Commission (NRC)        (NRC) with a copy of Revision 17 to the FCS PSP issued in May 2010. These            These changes were necessary    necessary due to the new Rule (Reference (Reference 3) being issued, which resulted in OPPD utilizing the NRC endorsed NEI 03-12, Revision 6, template (Reference 2).
: 3) being issued, which resulted in OPPD utilizing the NRC endorsed NEI 03-12, Revision 6, template (Reference 2).Revision 17 of the PSP incorporates changes to Section 4, Establishment of Security Organization; Section 4.1.2, Security Chain of Command/Delegation of Authority, Section 11.2.3, Waterborne Threat Measures; Section 11.3, Protected Area Barriers; Section 15.1, Illumination; Section 15.2, Surveillance Systems; Section 18, Response Requirements; and, Section 23, Digital System Security.
Revision 17 of the PSP incorporates      incorporates changes to Section 4, Establishment Establishment of Security Organization;Section 4.1.2, Security Organization;                              Security Chain Chain of Command Command/Delegation         Authority, Section 11.2.3, IDe legation of Authority,           11.2.3, Waterborne Threat Waterborne            Threat Measures; Measures;' Section   11.3, Section 11    ProtectedArea Barriers;
These changes were made to reflect site specific clarifications, utilizing the NEI 03-12, Revision 6 template, and following NRC guidance.
                                                              .3, Protected       Barriers; Section   15.1, Illumination; Section' 15.1,   Illumination; Section 15.2,             Surveillance Systems; Section 15.2, Swveillance                            18, Response Section 18, Response Requirements; Requirements; and, Section Section 23, Digital Digital    System         Security.
These changes do not degrade or impact the defensive strategy. Also, included with this submittal is Enclosure 2, a deviation table delineating the changes to the FCS PSP which deviate from the NEI 03-12, Revision 6, template as well as the reasons for the deviations.
Security. These   changes   were made made  to reflect site specific clarifications, utilizing utilizing the NEI 03-12, Revision    Revision 6 template, and following NRC guidance. These changes do not degrade degrade          or   impact   the defensive defensive strategy. Also, included included with this submittal is Enclosure 2, aa deviation deviation table delineating delineating the changes to the FCS PSP which deviate from the NEI 03-12, Revision 6, template  template as well as the reasons for the deviations.
The Revision 17 changes were evaluated in accordance with 10 CFR 50.54(p) and do not reduce the effectiveness of the FCS PSP.SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information.
The Revision 17 changes were evaluated in accordance with 10 CFR 50.54(p) and do not The Revision 17 changes were evaluated in accordance with 10 CFR 50.54(p) and do not effectiveness of the FCS PSP.
Decontrolled When Separated From Enclosure Employment with Equal Opportunity 4171iiililii --Omaha Public Power District Fort Calhoun Station 9610 Power Lane Blair, NE 68008 May 27, 2010 ' LI C-1 0-0036 SAFEGUARDS INFORMATION U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
reduce the effectiveness SAFEGUARDS        INFORMATION SAFEGUARDS INFORMATION Enclosure Contains Safeguards Enclosure                        Safeguards Information.
Information. Decontrolled Decontrolled When Separated Separated From Enclosure Enclosure                                                SeD I' Employment Employment with  with Equal    Opportunity Equal Opportunity                                                                                   4171 4171


==References:==
SAFEGUARDS SAFEGUARDS INFORMATION INFORMATION U. S. Nuclear U. Nuclear Regulatory Commission LlC-10-0036 LIC-1 0-0036 Page 2 enclosed compact The enclosed     compact disk (CD) contains    safeguards information contains safeguards     information and must be controlled    in controlled in accordance accordance      with 10 10 CFR   73.21. Please 73.21. Please   return the attached  Safeguards attached Safeguards Information Receipt Acknowledgement Acknowledgement (Form SDF-62) at your earliest convenience.
: 1. 2. 3. 4. Docket No. 50-285 NEI 03-12, "Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan," Revision 6, dated June 2004 Federal Register Notice, "Power Reactor Security Requirements; Final Rule," dated March 27, 2009 (74 FR 13926) Letter from OPPD (J. A. Reinhart) to NRC (Document Control Desk), "Request for Exemption from Physical Security Requirements," date December 31,2009 (L1C-09-0071)
 
==SUBJECT:==
Submittal of Revision 17 to the Fort Calhoun Station (FCS), Unit No.1, Physical Security Plan (PSP) The Omaha Public Power District (OPPD) hereby provides the U. S. Nuclear Regulatory Commission (NRC) with a copy of Revision 17 to the FCS PSP issued in May 2010. These changes were necessary due to the new Rule (Reference
: 3) being issued, which resulted in OPPD utilizing the NRC endorsed NEI 03-12, Revision 6, template (Reference 2). Revision 17 of the PSP incorporates changes to Section 4, Establishment of Security Organization; Section 4.1.2, Security Chain of Command IDe legation of Authority, Section 11.2.3, Waterborne Threat Measures;'
Section 11 .3, Protected Area Barriers; Section' 15.1, Illumination; Section 15.2, Swveillance Systems; Section 18, Response Requirements; and, Section 23, Digital System Security.
These changes were made to reflect site specific clarifications, utilizing the NEI 03-12, Revision 6 template, and following NRC guidance.
These changes do not degrade or impact the defensive strategy.
Also, included with this submittal is Enclosure 2, a deviation table delineating the changes to the FCS PSP which deviate from the NEI 03-12, Revision 6, template as well as the reasons for the deviations.
The Revision 17 changes were evaluated in accordance with 10 CFR 50.54(p) and do not reduce the effectiveness of the FCS PSP. SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information.
Decontrolled When Separated From Enclosure SeD I' Employment with Equal Opportunity 4171 SAFEGUARDS INFORMATIONU. S. Nuclear Regulatory Commission LIC-1 0-0036 Page 2 The enclosed compact disk (CD) contains safeguards information and must be controlled in accordance with 10 CFR 73.21. Please return the attached Safeguards Information Receipt Acknowledgement (Form SDF-62) at your earliest convenience.
This letter contains no NRC commitments.
This letter contains no NRC commitments.
If you should have any questions or require additional information regarding this submittal, please contact Mr. Ronald Undajon at (402) 533-6584.Sincerely,.R. Goodell Division Manager -Nuclear Performance Improvement  
If you should have any questions If                          questions or require additional additional information information regarding regarding this submittal, please contact Mr. Ronald Undajon Undajon at (402) 533-6584.
& Support JRG/dll  
533-6584.
Sincerely,
  . R. Goodell Division Manager - Nuclear Performance         Improvement & Support Performance Improvement JRG/dll JRG/dli


==Attachment:==
==Attachment:==
Form SDF-62
==Enclosures:==
: 1. FCS Physical Security Plan (CD -Safeguards Information)
: 2. Deviation Table (Security Related Information-Withhold under 10 CFR 2.390;Table Included on Enclosure 1 CD)c: E. E. Collins, NRC Regional Administrator, Region IV L. E. Wilkins, NRC Project Manager (w/o attachment or enclosures)
J. C. Kirkland, NRC Senior Resident Inspector (w/o attachment or enclosures)
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information.
Decontrolled When Separated From Enclosure SAFEGUARDS INFORMATION U. S. Nuclear Regulatory Commission LlC-10-0036 Page 2 The enclosed compact disk (CD) contains safeguards information and must be controlled in accordance with 1 0 CFR 73.21. Please return the attached Safeguards Information Receipt Acknowledgement (Form SDF-62) at your earliest convenience.
This letter contains no NRC commitments.
If you should have any questions or require additional information regarding this submittal, please contact Mr. Ronald Undajon at (402) 533-6584.
Sincerely, Division Manager -Nuclear Performance Improvement
& Support JRG/dli


==Attachment:==
==Attachment:==
 
Form SDF-62 SDF-62
Form SDF-62  


==Enclosures:==
==Enclosures:==
: 1. FCS Physical Security Plan (CD -Safeguards Information)  
: 1. FCS Physical Security Plan (CD - Safeguards Safeguards Information)
: 2. Deviation Table (Security Related Information-Withhold under 10 CFR 2.390; Table Included on Enclosure 1 CD) c: E. E. Collins, NRC Regional Administrator, Region IV L. E. Wilkins, NRC Project Manager (w/o attachment or enclosures)
Information)
J. C. Kirkland, NRC Senior Resident Inspector (w/o attachment or enclosures)
: 2. Deviation Table (Security Related   Information-Withhold under 10 CFR 2.390; Related Information-Withhold Included on Enclosure Table Included     Enclosure 1 CD) c:     E. E. Collins, NRC Regional Administrator, Region Region IVIV L. E. Wilkins, NRC Project Manager (w/o attachment L.                                          attachment or enclosures)
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information.
J. C. Kirkland, Kirkland, NRC Senior Resident Resident Inspector Inspector (w/o attachment attachment or enclosures)
Decontrolled When Separated From Enclosure}}
SAFEGUARDS SAFEGUARDS INFORMATION INFORMATION Enclosure Contains Safeguards Safeguards Information.
Information. Decontrolled Decontrolled When Separated Separated From Enclosure Enclosure}}

Latest revision as of 23:03, 11 March 2020

Submittal of Revision 17 to Physical Security Plan
ML101670452
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/27/2010
From: Goodell J
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-10-0036
Download: ML101670452 (2)


Text

~~ S AFEGUARDS INFORMATION SAFEGUARDS INFORMATION iiililii Omaha Public Omaha --

PublicPower District PowerOistnct Fort Calhoun Fort Calhoun Station Station 9610 Power 9610 Power Lane Blair, Blair,NE 68008 68008 May 27, 2010 May 2010 '

LI C-1 0-0036 LIC-10-0036 U. S. Nuclear U. Nuclear Regulatory Regulatory Commission Commission ATTN: Document Document Control Desk Washington, DC 20555-0001 Washington,

References:

1. 50-285 Docket No. 50-285
2. NEI 03-12, "Security Plan, Plan, Training and Qualification Safeguards Qualification Plan, and Safeguards Contingency Plan," Revision 6, dated June 2004 Contingency 2004
3. Federal Register Notice, Federal Register Notice, "Power Reactor Requirements; Final Reactor Security Requirements; Rule," dated March 27, 2009 (74 FR 13926)13926)
4. Letter from OPPD (J. A. Reinhart) to NRC (Document Control Desk),

"Request for Exemption Exemption from Physical Security Security Requirements," date December December 31, 2009 (LIC-09-0071) 31,2009 (L1C-09-0071)

SUBJECT:

Submittal of Revision 17 to the Fort Calhoun Station (FCS), Unit No.1, Station (FCS), No. 1, Physical Physical Security Plan (PSP)

The OmahaOmaha Public Power Power District (OPPD) hereby hereby provides the U. U. S. Nuclear Nuclear Regulatory Commission (NRC) (NRC) with a copy of Revision 17 to the FCS PSP issued in May 2010. These These changes were necessary necessary due to the new Rule (Reference (Reference 3) being issued, which resulted in OPPD utilizing the NRC endorsed NEI 03-12, Revision 6, template (Reference 2).

Revision 17 of the PSP incorporates incorporates changes to Section 4, Establishment Establishment of Security Organization;Section 4.1.2, Security Organization; Security Chain Chain of Command Command/Delegation Authority, Section 11.2.3, IDe legation of Authority, 11.2.3, Waterborne Threat Waterborne Threat Measures; Measures;' Section 11.3, Section 11 ProtectedArea Barriers;

.3, Protected Barriers; Section 15.1, Illumination; Section' 15.1, Illumination; Section 15.2, Surveillance Systems; Section 15.2, Swveillance 18, Response Section 18, Response Requirements; Requirements; and, Section Section 23, Digital Digital System Security.

Security. These changes were made made to reflect site specific clarifications, utilizing utilizing the NEI 03-12, Revision Revision 6 template, and following NRC guidance. These changes do not degrade degrade or impact the defensive defensive strategy. Also, included included with this submittal is Enclosure 2, aa deviation deviation table delineating delineating the changes to the FCS PSP which deviate from the NEI 03-12, Revision 6, template template as well as the reasons for the deviations.

The Revision 17 changes were evaluated in accordance with 10 CFR 50.54(p) and do not The Revision 17 changes were evaluated in accordance with 10 CFR 50.54(p) and do not effectiveness of the FCS PSP.

reduce the effectiveness SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION Enclosure Contains Safeguards Enclosure Safeguards Information.

Information. Decontrolled Decontrolled When Separated Separated From Enclosure Enclosure SeD I' Employment Employment with with Equal Opportunity Equal Opportunity 4171 4171

SAFEGUARDS SAFEGUARDS INFORMATION INFORMATION U. S. Nuclear U. Nuclear Regulatory Commission LlC-10-0036 LIC-1 0-0036 Page 2 enclosed compact The enclosed compact disk (CD) contains safeguards information contains safeguards information and must be controlled in controlled in accordance accordance with 10 10 CFR 73.21. Please 73.21. Please return the attached Safeguards attached Safeguards Information Receipt Acknowledgement Acknowledgement (Form SDF-62) at your earliest convenience.

This letter contains no NRC commitments.

If you should have any questions If questions or require additional additional information information regarding regarding this submittal, please contact Mr. Ronald Undajon Undajon at (402) 533-6584.

533-6584.

Sincerely,

. R. Goodell Division Manager - Nuclear Performance Improvement & Support Performance Improvement JRG/dll JRG/dli

Attachment:

Attachment:

Form SDF-62 SDF-62

Enclosures:

1. FCS Physical Security Plan (CD - Safeguards Safeguards Information)

Information)

2. Deviation Table (Security Related Information-Withhold under 10 CFR 2.390; Related Information-Withhold Included on Enclosure Table Included Enclosure 1 CD) c: E. E. Collins, NRC Regional Administrator, Region Region IVIV L. E. Wilkins, NRC Project Manager (w/o attachment L. attachment or enclosures)

J. C. Kirkland, Kirkland, NRC Senior Resident Resident Inspector Inspector (w/o attachment attachment or enclosures)

SAFEGUARDS SAFEGUARDS INFORMATION INFORMATION Enclosure Contains Safeguards Safeguards Information.

Information. Decontrolled Decontrolled When Separated Separated From Enclosure Enclosure