ML17059B678: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 7: | Line 7: | ||
| issue date = 08/14/1997 | | issue date = 08/14/1997 | ||
| title = Forwards Results of Evaluation Which Indicate That Weld Overlay Repair of RWCU Weld 33-FW-22 Meets Requirements of ASME Code Case N-504,Sections (g)(2) & (g)(3) | | title = Forwards Results of Evaluation Which Indicate That Weld Overlay Repair of RWCU Weld 33-FW-22 Meets Requirements of ASME Code Case N-504,Sections (g)(2) & (g)(3) | ||
| author name = | | author name = Conway J | ||
| author affiliation = NIAGARA MOHAWK POWER CORP. | | author affiliation = NIAGARA MOHAWK POWER CORP. | ||
| addressee name = | | addressee name = | ||
| Line 21: | Line 21: | ||
| number = ML17059B677 | | number = ML17059B677 | ||
| issue date = 08/11/1997 | | issue date = 08/11/1997 | ||
| title = | | title = Rev 0 to Evaluation of Overlay for RWCU Weld 33-FW-22. | ||
| author name = | | author name = Mcgowan D, Schaseman C | ||
| author affiliation = MPR ASSOCIATES, INC. | | author affiliation = MPR ASSOCIATES, INC. | ||
| addressee name = | | addressee name = | ||
Latest revision as of 14:50, 8 March 2020
| Date released: 06/30/2017 | Download: ML17059B678 |
|---|---|
| ML18040A316 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/14/1997 |
| From: | Conway J NIAGARA MOHAWK POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| Download: ML18040A316 (7) | |
| ML17059B677 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/11/1997 |
| From: | Mcgowan D, Schaseman C MPR ASSOCIATES, INC. |
| To: | |
| References | |
| Download: ML17059B677 (186) | |