ML17318A376: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
| number = ML17326A296
| number = ML17326A296
| issue date = 10/26/1979
| issue date = 10/26/1979
| title = Forwards LER 79-034/03L-0
| title = LER 79-034/03L-0:on 790926,sample Pump for Radiation Monitors R-11 & R-12 Tripped at Frequent Intervals on Two Occasions.Cause Unknown.Pumps Replaced & Tested Satisfactorily.Pumps Scheduled for Periodic Replacement
| author name = WIZNER D G
| author name = Wizner D
| author affiliation = INDIANA MICHIGAN POWER CO.
| author affiliation = INDIANA MICHIGAN POWER CO.
| addressee name =  
| addressee name =  
Line 22: Line 22:
| issue date = 10/26/1979
| issue date = 10/26/1979
| title = Forwards LER 79-034/03L-0
| title = Forwards LER 79-034/03L-0
| author name = SHALLER D V
| author name = Shaller D
| author affiliation = INDIANA MICHIGAN POWER CO.
| author affiliation = INDIANA MICHIGAN POWER CO.
| addressee name = KEPPLER J G
| addressee name = KEPPLER J G

Latest revision as of 08:21, 7 March 2020

Forwards LER 79-034/03L-0
Date released: 05/31/2018 Download: ML17318A376


LER 79-034/03L-0:on 790926,sample Pump for Radiation Monitors R-11 & R-12 Tripped at Frequent Intervals on Two Occasions.Cause Unknown.Pumps Replaced & Tested Satisfactorily.Pumps Scheduled for Periodic Replacement
ML17326A296
Person / Time
Site: Cook 
Issue date: 10/26/1979
From: Wizner D
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A296 (2)
Forwards LER 79-034/03L-0
ML17318A375
Person / Time
Site: Cook 
Issue date: 10/26/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17318A375 (2)