ML17352B043: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
| number = ML17352B044
| number = ML17352B044
| issue date = 02/20/1995
| issue date = 02/20/1995
| title = Forwards Engineering Evaluation of Turkey Point Units 3 & 4 Containment Structure. Rept Summarizes re-analysis of Turkey Point Units 3 & 4 Containment Structures,Per Commitment Made by 941123 Ltr
| title = Engineering Evaluation of Turkey Point Units 3 & 4 Containment Structures.
| author name =  
| author name =  
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
Line 22: Line 22:
| issue date = 02/20/1995
| issue date = 02/20/1995
| title = Forwards Engineering Evaluation of Turkey Point Units 3 & 4 Containment Structure. Rept Summarizes re-analysis of Turkey Point Units 3 & 4 Containment Structures,Per Commitment Made by 941123 Ltr
| title = Forwards Engineering Evaluation of Turkey Point Units 3 & 4 Containment Structure. Rept Summarizes re-analysis of Turkey Point Units 3 & 4 Containment Structures,Per Commitment Made by 941123 Ltr
| author name = PLUNKETT T F
| author name = Plunkett T
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Latest revision as of 20:10, 6 March 2020

Forwards Engineering Evaluation of Turkey Point Units 3 & 4 Containment Structure. Rept Summarizes re-analysis of Turkey Point Units 3 & 4 Containment Structures,Per Commitment Made by 941123 Ltr
Date released: 07/31/2018 Download: ML17352B043


Engineering Evaluation of Turkey Point Units 3 & 4 Containment Structures.
ML17352B044
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 02/20/1995
From:
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17352B044 (68)
Forwards Engineering Evaluation of Turkey Point Units 3 & 4 Containment Structure. Rept Summarizes re-analysis of Turkey Point Units 3 & 4 Containment Structures,Per Commitment Made by 941123 Ltr
ML17352B042
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 02/20/1995
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17352B042 (4)