ML18005B087: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
| number = ML18005B088
| number = ML18005B088
| issue date = 10/02/1989
| issue date = 10/02/1989
| title = Forwards Response to NRC 890831 Questions Re Suppl to Cycle 3 Reload Amend Request.Util Currently Performing Addl Steam Generator Tube Rupture Analyses,Based on Revised Operator Action Times Described in Util 890519 Ltr
| title = Proposed Tech Specs Re Cycle 3 Reload & Rev to Min Containment Backpressure Calculation
| author name =  
| author name =  
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 22: Line 22:
| issue date = 10/02/1989
| issue date = 10/02/1989
| title = Forwards Response to NRC 890831 Questions Re Suppl to Cycle 3 Reload Amend Request.Util Currently Performing Addl Steam Generator Tube Rupture Analyses,Based on Revised Operator Action Times Described in Util 890519 Ltr
| title = Forwards Response to NRC 890831 Questions Re Suppl to Cycle 3 Reload Amend Request.Util Currently Performing Addl Steam Generator Tube Rupture Analyses,Based on Revised Operator Action Times Described in Util 890519 Ltr
| author name = CUTTER A B
| author name = Cutter A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Latest revision as of 18:02, 6 March 2020

Forwards Response to NRC 890831 Questions Re Suppl to Cycle 3 Reload Amend Request.Util Currently Performing Addl Steam Generator Tube Rupture Analyses,Based on Revised Operator Action Times Described in Util 890519 Ltr
Date released: 08/31/2018 Download: ML18005B087


Proposed Tech Specs Re Cycle 3 Reload & Rev to Min Containment Backpressure Calculation
ML18005B088
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/02/1989
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18005B088 (10)
Forwards Response to NRC 890831 Questions Re Suppl to Cycle 3 Reload Amend Request.Util Currently Performing Addl Steam Generator Tube Rupture Analyses,Based on Revised Operator Action Times Described in Util 890519 Ltr
ML18005B086
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/02/1989
From: Cutter A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18005B086 (22)