ML18016A311: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML18016A313
| number = ML18016A313
| issue date = 02/09/1998
| issue date = 02/09/1998
| title = Forwards LER 98-001-00,describing Potential Failure Scenario That Could Render SG pre-heater Bypass Isolation Valves Inoperable & Result in Operation of Plant Outside Design Basis
| title = LER 98-001-00:on 980109,potential Condition Outside Design Basis Related to Instrument Air Sys Leak Causing SG pre- Heater Bypass Isolation Valves to Be Inoperable Was Noted. Caused by Inadequate Design Control.Generated Jco 98-01
| author name = Verrilli M
| author name = Verrilli M
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 16:29, 6 March 2020

Forwards LER 98-001-00,describing Potential Failure Scenario That Could Render SG pre-heater Bypass Isolation Valves Inoperable & Result in Operation of Plant Outside Design Basis
Date released: 08/31/2018 Download: ML18016A311


LER 98-001-00:on 980109,potential Condition Outside Design Basis Related to Instrument Air Sys Leak Causing SG pre- Heater Bypass Isolation Valves to Be Inoperable Was Noted. Caused by Inadequate Design Control.Generated Jco 98-01
ML18016A313
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/09/1998
From: Verrilli M
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18016A313 (4)
Forwards LER 98-001-00,describing Potential Failure Scenario That Could Render SG pre-heater Bypass Isolation Valves Inoperable & Result in Operation of Plant Outside Design Basis
ML18016A310
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/09/1998
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18016A310 (2)