ML18017B124: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML18017B125
| number = ML18017B125
| issue date = 06/24/1980
| issue date = 06/24/1980
| title = Forwards Final Deficiency Rept Re Omission of Addl Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall Adjacent to Const Opening for Equipment Hatch
| title = Final Deficiency Rept Re Omission of Addl Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall Adjacent to Const Opening for Equipment Hatch.Design Review & Mod to Steel Completed.Craft Work & Insp Procedures Revised
| author name =  
| author name =  
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 14:45, 6 March 2020

Forwards Final Deficiency Rept Re Omission of Addl Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall Adjacent to Const Opening for Equipment Hatch
Date released: 08/31/2018 Download: ML18017B124


Final Deficiency Rept Re Omission of Addl Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall Adjacent to Const Opening for Equipment Hatch.Design Review & Mod to Steel Completed.Craft Work & Insp Procedures Revised
ML18017B125
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/24/1980
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18017B125 (3)
Forwards Final Deficiency Rept Re Omission of Addl Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall Adjacent to Const Opening for Equipment Hatch
ML18017B123
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/30/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18017B123 (3)