ML16183A023: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16183A023 | | number = ML16183A023 | ||
| issue date = 07/01/2016 | | issue date = 07/01/2016 | ||
| title = | | title = Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations | ||
| author name = Bono S | | author name = Bono S | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| addressee name = | | addressee name = | ||
Line 14: | Line 14: | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 | {{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 July 1, 2016 10 CFR 50.4 ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPRD-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 | ||
July 1, 2016 10 CFR 50.4 ATTN: Document | |||
Control Desk U.S. Nuclear Regulatory | ==Subject:== | ||
Commission | Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations | ||
Washington | |||
, D.C. 20555-0001 | ==Reference:== | ||
Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating | : 1. Nuclear Regulatory Commission, Regulatory Issue Summary 2016-09, "Preparation and Scheduling of Operator Licensing Examinations," dated June 16, 2016 | ||
License Nos. DPR-33, DPRD-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Subject: | : 2. Letter from the Tennessee Valley Authority to the Nuclear Regulatory Commission, "Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations," dated May 22, 2015. | ||
Response | The Nuclear Regulatory Commission (NRC) Regulatory Issues Summary (RIS) 2016-09 (Reference 1) requested specific information regarding the Browns Ferry Nuclear Plant (BFN) projected operator licensing examination schedules and the estimated number of applicants. By letter dated May 22, 2015 (Reference 2), the Tennessee Valley Authority provided an estimate of the examination requirements for BFN on NRC Form 536, "Operator Licensing Examination Data." This letter revises the estimates previously provided by Reference 2, and provides applicant estimates through 2021 . | ||
to NRC Regulatory | |||
Issue Summary 2016-09, | US Nuclear Regulatory Commission Page 2 July 1, 2016 There are no new regulatory commitments associated with this submittal. Should you have any questions concerning this response , please contact Christopher L. Vaughn at (256) 729-3439. | ||
Preparation | |||
and Scheduling | ==Enclosure:== | ||
of Operator | Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations cc (w/ Enclosure) : | ||
Licensing | NRC Regional Administrator - Region II | ||
Reference | ENCLOSURE Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1, 2, and 3 Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations See Enclosed | ||
: 1. Nuclear Regulatory | |||
Commission | NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 | ||
, Regulatory | '¥'* . | ||
Issue Summary 2016-09, "Preparation | (01 -2015) | ||
and Scheduling | J'.~fl FIEG(I< Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator | ||
of Operator | ; .., CZ, examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information | ||
Licensing | ; . **; OPERATOR LICENSING Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC | ||
Examinations | ,,..,.~., | ||
," dated June 16, 2016 2. Letter from the Tennessee | ....... +o~ EXAMINATION DATA 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | ||
Valley Authority | FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 201 6 CY 2017 CY 2018 CY 2019 NUMBER OF REACTOR OPERATORS 0 0 6 4 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 5 8 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 7 2 6 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NIA 041101201 7 06/1012018 0410812019 ALTERNATE DATE NIA SCHEDULED 0711512018 05/1312019 | ||
to the Nuclear Regulatory | : c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 10 CANDIDATES NRG FORM 536 (01 -2015) | ||
Commission | |||
, "Response | NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150-0131 EXPIRES: 10/31/2017 (01-2015) c,"t.,.P. Fl£G(l( "f Estimated burden per response to comply with this voluntary information collection request: 1 | ||
to NRC Regulatory | 'W' hour. This information collection is used to plan budgets and resources for operator | ||
Issue Summary 2015-05, Preparation | /;' n | ||
and Scheduling | ~* . !" | ||
of Operator | 0 OPERATOR LICENSING examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington , DC | ||
Licensing | ~ | ||
Examinations | ...... .. o~ | ||
," dated May 22, 2015. The Nuclear Regulatory | EXAMINATION DATA 20555-0001 , or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-01 31), Office of Management and Budget, Washington , DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | ||
Commission | FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2020 CY2021 CY CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 EXAM INATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2020 CY2021 CY CY NUMBER OF REACTOR OPERATORS 5 5 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 PROPOSED DATES PRIMARY DATE 04/ 13/2020 04/ 12/2021 ALTERNATE DATE 05111 /2020 05/ 10/2021 | ||
(NRC) Regulatory | : c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2018 CY 2019 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 11 CANDIDATES NRC FORM 536 (01 -2015)}} | ||
Issues Summary (RIS) 2016-09 (Reference | |||
1) requested | |||
specific | |||
information | |||
regarding | |||
the Browns Ferry Nuclear Plant (BFN) projected | |||
operator | |||
licensing | |||
examination | |||
schedules | |||
and the estimated | |||
number of applicants. | |||
By letter dated May 22, 2015 (Reference | |||
2), the Tennessee | |||
Valley Authority | |||
provided | |||
an estimate | |||
of the examination | |||
requirements | |||
for BFN on NRC Form 536, "Operator | |||
Licensing | |||
Examination | |||
Data." This letter revises the estimates | |||
previously | |||
provided | |||
by Reference | |||
2, and provides | |||
applicant | |||
estimates | |||
through 2021. | |||
US Nuclear Regulatory | |||
Commission | |||
Page 2 July 1, 2016 There are no new regulatory | |||
commitments | |||
associated | |||
with this submittal. | |||
Should you have any questions | |||
concerning | |||
this response, please contact Christopher | |||
L. Vaughn at (256) 729-3439. Enclosure | |||
to NRC Regulatory | |||
Issue Summary 2016-09, Preparation | |||
and Scheduling | |||
of Operator | |||
Licensing | |||
Examinations | |||
cc (w/ Enclosure) | |||
Administrator | |||
-Region II | |||
ENCLOSURE | |||
Tennessee | |||
Valley Authority | |||
Browns Ferry Nuclear Plant Units 1, 2, and 3 Response | |||
to NRC Regulatory | |||
Issue Summary 2016-09, | |||
Preparation | |||
and Scheduling | |||
of Operator | |||
Licensing | |||
Examinations | |||
See Enclosed | |||
NRC FORM 536 U.S. NUCLEAR REGULATORY | |||
COMMISSION | |||
APPROVED | |||
BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 | |||
(01-2015) | |||
FIEG(I< Estimated burden per response | |||
to comply with this voluntary | |||
information | |||
collection | |||
request: | |||
1 | |||
collection is used to plan budgets and resources for operator ; .., CZ, | |||
examinations | |||
. Send comments | |||
regarding burden estimate to the FOIA, Privacy, and Information | |||
; . **; Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission | |||
, Washington, DC EXAMINATION | |||
DATA 20555-0001, | |||
or by internet | |||
e-mail to | |||
.gov, and to the Desk Officer, | |||
and Regulatory | |||
Affairs, | |||
NEOB-10202 | |||
, (3150-0131), Office of Management | |||
and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information | |||
collection. FACILITY NRC REGION A. PROPOSED | |||
EXAMINATION | |||
PREPARATION | |||
SCHEDULE | |||
PROPOSED | |||
NUMBER | |||
0 1 1 1 EXAMINATIONS | |||
ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR | |||
LICENSE EXAMINATIONS | |||
PROPOSED | |||
NUMBER | |||
DATES PRIMARY DATE NIA | |||
0711512018 05/1312019 c. PROPOSED | |||
GENERIC FUNDAMENTALS | |||
EXAMINATION | |||
(GFE) SCHEDULE | |||
CY 2016 CY 2017 PROPOSED | |||
DECEMBER ESTIMATED | |||
NUMBER OF 14 10 CANDIDATES NRG FORM 536 (01-2015) | |||
NRC FORM 536 U.S. NUCLEAR REGULATORY | |||
COMMISSION | |||
APPROVED | |||
BY OMB: NO. 3150-0131 | |||
EXPIRES: 10/31/2017 | |||
(01-2015) | |||
c,"t.,.P. | |||
Fl£G(l("f Estimated | |||
burden per response | |||
to comply with this voluntary | |||
information | |||
collection | |||
request: | |||
collection | |||
is used to plan budgets and resources | |||
for operator | |||
/;' n | |||
examinations | |||
. Send comments | |||
regarding | |||
burden estimate | |||
to the FOIA, Privacy, and Information | |||
Branch (T-5 F53), U.S. Nuclear Regulatory | |||
Commission, | |||
Washington | |||
, DC | |||
DATA 20555-0001 | |||
, or by internet | |||
e-mail to lnfocollects.Resource@nrc.gov | |||
, and to the Desk Officer, | |||
and Regulatory | |||
Affairs, NEOB-10202 | |||
, ( | |||
, DC 20503. If a means used to impose an information | |||
collection | |||
does not display a currently | |||
valid OMB control number, the NRC may not conduct or sponsor, and a person is not required | |||
to respond to, the information | |||
collection. | |||
FACILITY NRC REGION A. PROPOSED | |||
EXAMINATION | |||
PREPARATION | |||
SCHEDULE | |||
PROPOSED | |||
NUMBER CY2020 CY2021 CY CY | |||
NUMBER OF LICENSEE-PREPARED | |||
1 1 EXAMINATIONS | |||
ESTIMATED | |||
NUMBER OF NRG-PREPARED | |||
0 0 | |||
B. INITIAL OPERATOR | |||
LICENSE EXAMINATIONS | |||
PROPOSED | |||
NUMBER CY2020 CY2021 CY CY | |||
NUMBER OF SENIOR REACTOR | |||
-INSTANT NUMBER OF SENIOR REACTOR | |||
NUMBER OF SENIOR REACTOR | |||
-LIMITED PROPOSED | |||
DATES PRIMARY DATE 04/13/2020 04/12/2021 ALTERNATE | |||
DATE 05111/2020 05/10/2021 c. PROPOSED | |||
GENERIC FUNDAMENTALS | |||
EXAMINATION | |||
(GFE) SCHEDULE | |||
CY 2018 CY 2019 PROPOSED | |||
DECEMBER | |||
MARCH JUNE SEPTEMBER | |||
DECEMBER | |||
ESTIMATED | |||
NUMBER OF 11 11 CANDIDATES | |||
NRC FORM 536 (01-2015) | |||
}} |
Latest revision as of 20:16, 24 February 2020
ML16183A023 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 07/01/2016 |
From: | Bono S Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation, NRC/RGN-II |
References | |
RIS-16-009 | |
Download: ML16183A023 (5) | |
Text
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 July 1, 2016 10 CFR 50.4 ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPRD-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations
Reference:
- 1. Nuclear Regulatory Commission, Regulatory Issue Summary 2016-09, "Preparation and Scheduling of Operator Licensing Examinations," dated June 16, 2016
- 2. Letter from the Tennessee Valley Authority to the Nuclear Regulatory Commission, "Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations," dated May 22, 2015.
The Nuclear Regulatory Commission (NRC) Regulatory Issues Summary (RIS) 2016-09 (Reference 1) requested specific information regarding the Browns Ferry Nuclear Plant (BFN) projected operator licensing examination schedules and the estimated number of applicants. By letter dated May 22, 2015 (Reference 2), the Tennessee Valley Authority provided an estimate of the examination requirements for BFN on NRC Form 536, "Operator Licensing Examination Data." This letter revises the estimates previously provided by Reference 2, and provides applicant estimates through 2021 .
US Nuclear Regulatory Commission Page 2 July 1, 2016 There are no new regulatory commitments associated with this submittal. Should you have any questions concerning this response , please contact Christopher L. Vaughn at (256) 729-3439.
Enclosure:
Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations cc (w/ Enclosure) :
NRC Regional Administrator - Region II
ENCLOSURE Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1, 2, and 3 Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations See Enclosed
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017
'¥'* .
(01 -2015)
J'.~fl FIEG(I< Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator
- .., CZ, examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information
- . **; OPERATOR LICENSING Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC
,,..,.~.,
....... +o~ EXAMINATION DATA 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 201 6 CY 2017 CY 2018 CY 2019 NUMBER OF REACTOR OPERATORS 0 0 6 4 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 5 8 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 7 2 6 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NIA 041101201 7 06/1012018 0410812019 ALTERNATE DATE NIA SCHEDULED 0711512018 05/1312019
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 10 CANDIDATES NRG FORM 536 (01 -2015)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150-0131 EXPIRES: 10/31/2017 (01-2015) c,"t.,.P. Fl£G(l( "f Estimated burden per response to comply with this voluntary information collection request: 1
'W' hour. This information collection is used to plan budgets and resources for operator
/;' n
~* . !"
0 OPERATOR LICENSING examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington , DC
~
...... .. o~
EXAMINATION DATA 20555-0001 , or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-01 31), Office of Management and Budget, Washington , DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2020 CY2021 CY CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 EXAM INATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2020 CY2021 CY CY NUMBER OF REACTOR OPERATORS 5 5 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 PROPOSED DATES PRIMARY DATE 04/ 13/2020 04/ 12/2021 ALTERNATE DATE 05111 /2020 05/ 10/2021
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2018 CY 2019 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 11 CANDIDATES NRC FORM 536 (01 -2015)