No emergency diesel generators started as per design.  Train A and B motor driven and the turbine driven AFW pumps have been returned to automatic.  All other safety systems functioned per design.  
No emergency diesel generators started as per design.  Train A and B motor driven and the turbine driven AFW pumps have been returned to automatic.  All other safety systems functioned per design.  
The loss of power to 138 KV transformer XST1 resulted in loss of power to both safeguards busses on Unit 2.  The busses performed a load-shed and slow transfer to power supplied from 345 KV transformer XST2A as designed and were re-energized and loads sequenced back onto the busses.  The emergency diesel generators are not required to start unless the busses are not re-energized by the alternate offsite transformer. All electrical power related actuations functioned as designed. There was no impact on Unit 1.
The loss of power to 138 KV transformer XST1 resulted in loss of power to both safeguards busses on Unit 2.  The busses performed a load-shed and slow transfer to power supplied from 345 KV transformer XST2A as designed and were re-energized and loads sequenced back onto the busses.  The emergency diesel generators are not required to start unless the busses are not re-energized by the alternate offsite transformer. All electrical power related actuations functioned as designed. There was no impact on Unit 1.
The licensee has notified the NRC Resident Inspector."
The licensee has notified the NRC Resident Inspector.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20181204en.html#en53767
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20181204en.html#en53767
}}{{unit info
}}{{unit info

Latest revision as of 23:58, 23 February 2020

ENS 53767 +/-
Where
Comanche Peak Luminant icon.png
Texas (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+5.25 h0.219 days <br />0.0312 weeks <br />0.00719 months <br />)
Opened: Brian Mitchell
11:15 Dec 3, 2018
NRC Officer: Karen Cotton
Last Updated: Dec 3, 2018