ENS 54272: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 20: | Line 20: | ||
Radiation monitor RU-140 (#2 Steam Generator Main Steam Line radiation monitor) experienced a communication failure on both ports A and B. The RU-140 monitor is off line and non-functional at this time. | Radiation monitor RU-140 (#2 Steam Generator Main Steam Line radiation monitor) experienced a communication failure on both ports A and B. The RU-140 monitor is off line and non-functional at this time. | ||
At least one channel of RU-140 is required to perform a Steam Generator Tube Rupture (SGTR) dose assessment. This represents an unplanned loss of radiological assessment capability for the inability to perform dose assessments that require the radiation monitor. The ability to make emergency classifications from other radiological data collection methods such as field sampling remains available. Actions have been initiated to restore the radiation monitor. | At least one channel of RU-140 is required to perform a Steam Generator Tube Rupture (SGTR) dose assessment. This represents an unplanned loss of radiological assessment capability for the inability to perform dose assessments that require the radiation monitor. The ability to make emergency classifications from other radiological data collection methods such as field sampling remains available. Actions have been initiated to restore the radiation monitor. | ||
The NRC Resident Inspector has been informed. | The NRC Resident Inspector has been informed. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190913en.html#en54272 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 3 | | Unit = 3 |
Latest revision as of 23:43, 23 February 2020
Where | |
---|---|
Palo Verde Arizona (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+2.02 h0.0842 days <br />0.012 weeks <br />0.00277 months <br />) | |
Opened: | Jason Hill 03:25 Sep 12, 2019 |
NRC Officer: | Jeff Herrera |
Last Updated: | Sep 12, 2019 |
54272 - NRC Website
| |