ML14094A397: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14094A397
| number = ML14094A397
| issue date = 03/20/2014
| issue date = 03/20/2014
| title = Draft Requests for Additional Information Request RR-003
| title = NRR E-mail Capture - Monticello Nuclear Generating Plant - Draft Requests for Additional Information Request RR-003
| author name = Beltz T
| author name = Beltz T
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Beltz, Terry Sent: Thursday, March 20, 2014 10:35 AM To: 'Rippy, L. Randal' Cc: 'Eckholt, Gene F. (Eugene.Eckholt@xenuclear.c om)'; 'Kissinger, Peter W.'; Audrain, Margaret; Carlson, Robert; Reisif ard, Mehdi; 'Loeffler, Richard A.'
{{#Wiki_filter:NRR-PMDAPEm Resource From:                             Beltz, Terry Sent:                             Thursday, March 20, 2014 10:35 AM To:                               'Rippy, L. Randal' Cc:                               'Eckholt, Gene F. (Eugene.Eckholt@xenuclear.com)'; 'Kissinger, Peter W.'; Audrain, Margaret; Carlson, Robert; Reisifard, Mehdi; 'Loeffler, Richard A.'


==Subject:==
==Subject:==
Monticello Nuclear Generating Plant - Draft R equests for Additional Information re: Request RR-003 (TAC No. MF3050)
Monticello Nuclear Generating Plant - Draft Requests for Additional Information re: Request RR-003 (TAC No. MF3050)


==Dear Mr. Rippy:==
==Dear Mr. Rippy:==


By letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 31, 2013 (Agencywide Documents Access and Management System Accession No. ML13308A390), Northern States Power Company - a Minnesota corporation (NSPM), doing business as Xc el Energy, submitted Request RR-003. In RR-003, NSPM requests authorization to implement a risk-informed/safety-based inservice inspection (ISI) program based on American Society of Mechanical Engineers (ASME) Boiler and Pressure Code Case N-716, "Alternative Piping Classification and Examination Requirements, Section XI, Division 1," for ASME Class 1 and 2 piping welds for the fifth 10-year ISI interv al at the Monticello Nuclear Generating Plant.
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 31, 2013 (Agencywide Documents Access and Management System Accession No. ML13308A390), Northern States Power Company - a Minnesota corporation (NSPM), doing business as Xcel Energy, submitted Request RR-003. In RR-003, NSPM requests authorization to implement a risk-informed/safety-based inservice inspection (ISI) program based on American Society of Mechanical Engineers (ASME) Boiler and Pressure Code Case N-716, "Alternative Piping Classification and Examination Requirements, Section XI, Division 1," for ASME Class 1 and 2 piping welds for the fifth 10-year ISI interval at the Monticello Nuclear Generating Plant.
The NRC staff in the Component Performance, NDE, and Te sting Branch of the Office of Nuclear Reactor Regulatory has identified areas where additional information is needed to complete its review. Draft requests for additional information (RAI) are provided below.
The NRC staff in the Component Performance, NDE, and Testing Branch of the Office of Nuclear Reactor Regulatory has identified areas where additional information is needed to complete its review. Draft requests for additional information (RAI) are provided below.
You may accept these draft RAIs as formal Requests for Additional Information and provide a response by May 9, 2014. You may also request to discuss the contents of these draft RAIs with the NRC staff in a conference call.
Please let me know if you have any questions or concerns.
Sincerely, TERRY A. BELTZ, SENIOR PROJECT MANAGER U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mail Stop: O-8D15 REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST RR-003 IMPLEMENTATION OF A RISK-INFORMED/SAFETY-BASED INSERVICE INSPECTION PROGRAM BASED ON ASME BOILER AND PRESSURE CODE CASE N-716 FOR ASME CLASS 1 AND 2 PIPING WELDS FOR THE FIFTH TEN-YEAR INSERVICE INSPECTION INTERVAL MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263 1


You may accept these draft RAIs as formal Requests for Additional Information and provide a response by May 9, 2014. You may also request to discuss the contents of these draft RAIs with the NRC staff in a conference call.
(TAC NO. MF3050)
 
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 31, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML13308A390), Northern States Power Company - Minnesota corporation (NSPM), doing business as Xcel Energy, submitted Request RR-003 for NRC review and approval. RR-003 requests authorization to implement a risk-informed/safety-based (RIS_B) inservice inspection (ISI) program based on American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-716 for ASME Class 1 and 2 piping welds for the fifth 10-year ISI interval at the Monticello Nuclear Generating Plant, Unit 1.
Please let me know if you have any questions or concerns.
The NRC staff in the Component Performance, NDE, and Testing Branch (EPNB) of the Office of Nuclear Reactor Regulation has reviewed the October 31, 2013, submittal, and identified that the following requests for additional information (RAI) are needed to complete its review:
 
RAI EPNB-1 Section 3.3.4 of Enclosure 1, states that relief requests for cases where less than 90 percent coverage is obtained will be submitted.
Sincerely,    TERRY A. BELTZ, SENIOR PROJECT MANAGER U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD  20852-2738 Mail Stop:  O-8D15
Please describe the efforts in weld selection such that greater than 90 percent coverage is attainable in the RIS_B inservice inspection program.
  ******************************************************************************************************************************
RAI EPNB-2 Section 4 of Enclosure 1, states that welds were selected for examination in the 1st period that met the requirements of both ASME Section XI and Code Case N-716, and that credit will be taken for these welds.
***********************************
 
REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST RR-003 IMPLEMENTATION OF A RISK-INFORMED/SAFETY-BASED INSERVICE INSPECTION PROGRAM BASED ON ASME BOILER AND PRESSURE CODE CASE N-716 FOR ASME CLASS 1 AND 2 PIPING WELDS  FOR THE FIFTH TEN-YEAR INSERVICE INSPECTION INTERVAL MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263
 
2 (TAC NO. MF3050)
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 31, 2013 (Agencywide Documents Access and Management System (A DAMS) Accession Number ML13308A390), Northern States Power Company - Minnesota corporation (NSPM), doing business as Xcel Energy, submitted Request RR-003 for NRC review and approval. RR-003 requests authorization to implement a risk-informed/safety-based (RIS_B) inservice inspection (ISI) program based on American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-716 for ASME Class 1 and 2 piping welds for the fifth 10-year ISI interval at the Monticello Nuclear Generating Plant, Unit 1.  
 
The NRC staff in the Component Performance, NDE, and Testing Branch (EPNB) of the Office of Nuclear Reactor Regulation has reviewed the October 31, 2013, submittal, and identified that the following requests for additional information (RAI) are needed to complete its review:  
 
RAI EPNB-1 Section 3.3.4 of Enclosure 1, states that relief requests for cases where less than 90 percent coverage is  
 
obtained will be submitted.  
 
Please describe the efforts in weld selection such that greater than 90 percent coverage is attainable in the  
 
RIS_B inservice inspection program.  
 
RAI EPNB-2
 
Section 4 of Enclosure 1, states that welds were selected for examination in the 1 st period that met the requirements of both ASME Section XI and Code Case N-716, and that credit will be taken for these welds.
: a. What were the results of the examinations?
: a. What were the results of the examinations?
: b. Was greater than 90 percent coverage attained?  
: b. Was greater than 90 percent coverage attained?
2


Hearing Identifier: NRR_PMDA Email Number: 1203   Mail Envelope Properties   (87B1F1BDFE5A554CA9DC5 EAA75EB6D0D014 FE64F0857)
Hearing Identifier:       NRR_PMDA Email Number:             1203 Mail Envelope Properties       (87B1F1BDFE5A554CA9DC5EAA75EB6D0D014FE64F0857)


==Subject:==
==Subject:==
Monticello Nuclear Generating Plant - Draft Requests for Additional Information re: Request RR-003 (TAC No. MF3050) Sent Date:   3/20/2014 10:34:55 AM Received Date: 3/20/2014 10:34:00 AM From:   Beltz, Terry Created By:   Terry.Beltz@nrc.gov Recipients:     "'Eckholt, Gene F. (Eugene.Eckholt@xenuclear.com)'" <Eugene.Eckholt@xenuclear.com> Tracking Status: None
Monticello Nuclear Generating Plant - Draft Requests for Additional Information re: Request RR-003 (TAC No. MF3050)
"'Kissinger, Peter W.'" <Peter.Kissinger@xenuclear.com> Tracking Status: None "Audrain, Margaret" <Margaret.Audrain@nrc.gov>
Sent Date:               3/20/2014 10:34:55 AM Received Date:           3/20/2014 10:34:00 AM From:                     Beltz, Terry Created By:               Terry.Beltz@nrc.gov Recipients:
Tracking Status: None "Carlson, Robert" <Robert.Carlson@nrc.gov> Tracking Status: None "Reisifard, Mehdi" <Mehdi.Reisifard@nrc.gov> Tracking Status: None "'Loeffler, Richard A.'" <Richard.Loeffler@xenuclear.com> Tracking Status: None "'Rippy, L. Randal'" <Randal.Rippy@xenuclear.com> Tracking Status: None  
"'Eckholt, Gene F. (Eugene.Eckholt@xenuclear.com)'" <Eugene.Eckholt@xenuclear.com>
 
Tracking Status: None
Post Office:   HQCLSTR01.nrc.gov
"'Kissinger, Peter W.'" <Peter.Kissinger@xenuclear.com>
 
Tracking Status: None "Audrain, Margaret" <Margaret.Audrain@nrc.gov>
Files     Size     Date & Time MESSAGE   3638     3/20/2014 10:34:00 AM
Tracking Status: None "Carlson, Robert" <Robert.Carlson@nrc.gov>
 
Tracking Status: None "Reisifard, Mehdi" <Mehdi.Reisifard@nrc.gov>
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None
"'Loeffler, Richard A.'" <Richard.Loeffler@xenuclear.com>
Tracking Status: None
"'Rippy, L. Randal'" <Randal.Rippy@xenuclear.com>
Tracking Status: None Post Office:             HQCLSTR01.nrc.gov Files                             Size                     Date & Time MESSAGE                           3638                     3/20/2014 10:34:00 AM Options Priority:                         Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:}}

Latest revision as of 22:08, 5 February 2020

NRR E-mail Capture - Monticello Nuclear Generating Plant - Draft Requests for Additional Information Request RR-003
ML14094A397
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/20/2014
From: Beltz T
Plant Licensing Branch III
To: Rippy L
Northern States Power Co
References
MF3050
Download: ML14094A397 (3)


Text

NRR-PMDAPEm Resource From: Beltz, Terry Sent: Thursday, March 20, 2014 10:35 AM To: 'Rippy, L. Randal' Cc: 'Eckholt, Gene F. (Eugene.Eckholt@xenuclear.com)'; 'Kissinger, Peter W.'; Audrain, Margaret; Carlson, Robert; Reisifard, Mehdi; 'Loeffler, Richard A.'

Subject:

Monticello Nuclear Generating Plant - Draft Requests for Additional Information re: Request RR-003 (TAC No. MF3050)

Dear Mr. Rippy:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 31, 2013 (Agencywide Documents Access and Management System Accession No. ML13308A390), Northern States Power Company - a Minnesota corporation (NSPM), doing business as Xcel Energy, submitted Request RR-003. In RR-003, NSPM requests authorization to implement a risk-informed/safety-based inservice inspection (ISI) program based on American Society of Mechanical Engineers (ASME) Boiler and Pressure Code Case N-716, "Alternative Piping Classification and Examination Requirements,Section XI, Division 1," for ASME Class 1 and 2 piping welds for the fifth 10-year ISI interval at the Monticello Nuclear Generating Plant.

The NRC staff in the Component Performance, NDE, and Testing Branch of the Office of Nuclear Reactor Regulatory has identified areas where additional information is needed to complete its review. Draft requests for additional information (RAI) are provided below.

You may accept these draft RAIs as formal Requests for Additional Information and provide a response by May 9, 2014. You may also request to discuss the contents of these draft RAIs with the NRC staff in a conference call.

Please let me know if you have any questions or concerns.

Sincerely, TERRY A. BELTZ, SENIOR PROJECT MANAGER U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mail Stop: O-8D15 REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST RR-003 IMPLEMENTATION OF A RISK-INFORMED/SAFETY-BASED INSERVICE INSPECTION PROGRAM BASED ON ASME BOILER AND PRESSURE CODE CASE N-716 FOR ASME CLASS 1 AND 2 PIPING WELDS FOR THE FIFTH TEN-YEAR INSERVICE INSPECTION INTERVAL MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263 1

(TAC NO. MF3050)

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 31, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML13308A390), Northern States Power Company - Minnesota corporation (NSPM), doing business as Xcel Energy, submitted Request RR-003 for NRC review and approval. RR-003 requests authorization to implement a risk-informed/safety-based (RIS_B) inservice inspection (ISI) program based on American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-716 for ASME Class 1 and 2 piping welds for the fifth 10-year ISI interval at the Monticello Nuclear Generating Plant, Unit 1.

The NRC staff in the Component Performance, NDE, and Testing Branch (EPNB) of the Office of Nuclear Reactor Regulation has reviewed the October 31, 2013, submittal, and identified that the following requests for additional information (RAI) are needed to complete its review:

RAI EPNB-1 Section 3.3.4 of Enclosure 1, states that relief requests for cases where less than 90 percent coverage is obtained will be submitted.

Please describe the efforts in weld selection such that greater than 90 percent coverage is attainable in the RIS_B inservice inspection program.

RAI EPNB-2 Section 4 of Enclosure 1, states that welds were selected for examination in the 1st period that met the requirements of both ASME Section XI and Code Case N-716, and that credit will be taken for these welds.

a. What were the results of the examinations?
b. Was greater than 90 percent coverage attained?

2

Hearing Identifier: NRR_PMDA Email Number: 1203 Mail Envelope Properties (87B1F1BDFE5A554CA9DC5EAA75EB6D0D014FE64F0857)

Subject:

Monticello Nuclear Generating Plant - Draft Requests for Additional Information re: Request RR-003 (TAC No. MF3050)

Sent Date: 3/20/2014 10:34:55 AM Received Date: 3/20/2014 10:34:00 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:

"'Eckholt, Gene F. (Eugene.Eckholt@xenuclear.com)'" <Eugene.Eckholt@xenuclear.com>

Tracking Status: None

"'Kissinger, Peter W.'" <Peter.Kissinger@xenuclear.com>

Tracking Status: None "Audrain, Margaret" <Margaret.Audrain@nrc.gov>

Tracking Status: None "Carlson, Robert" <Robert.Carlson@nrc.gov>

Tracking Status: None "Reisifard, Mehdi" <Mehdi.Reisifard@nrc.gov>

Tracking Status: None

"'Loeffler, Richard A.'" <Richard.Loeffler@xenuclear.com>

Tracking Status: None

"'Rippy, L. Randal'" <Randal.Rippy@xenuclear.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 3638 3/20/2014 10:34:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: