ML14237A175: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14237A175
| number = ML14237A175
| issue date = 07/31/2014
| issue date = 07/31/2014
| title = Arkansas Nuclear One, Unit 2-2014-07 Final Licensing Operating Test
| title = 2014-07 Final Licensing Operating Test
| author name = Gaddy V
| author name = Gaddy V
| author affiliation = NRC/RGN-IV
| author affiliation = NRC/RGN-IV
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Revision 0ES-301Administrative Topics OutlineForm ES-301-1Facility: Arkansas Nuclear One Unit 2Date of Examination: July 2014Examination Level:   RO       SRO XOperating Test Number:   2014-2Administrative Topic (see Note)Type Code*Describe activity to be performedA1. Conduct of Operations2.1.25 SRO (4.2)D/RDetermine if COLR DNBR limit is being met during aloss of COLSS and what action is required.ANO-2-JPM-NRC-ADMIN-DNBRLA2. Conduct of Operations2.1.34 SRO (3.5)N/RApply Steam Generator Chemistry limitsANO-2-JPM-NRC-ADMIN-SGCHEMA3. Equipment Control2.2.37 SRO (4.6)D/RApply Tech Specs.ANO-2-JPM-NRC-ADMIN-EDGTSA4. Radiation Control2.3.14 SRO (3.8)
{{#Wiki_filter:ES-301                              Administrative Topics Outline                            Form ES-301-1 Facility: Arkansas Nuclear One Unit 2                              Date of Examination: July 2014 Examination Level: RO             SRO X                          Operating Test Number: 2014-2 Administrative Topic           Type                   Describe activity to be performed (see Note)               Code*
M/RAdministration of Potassium Iodide.ANO-2-JPM-NRC-ADMIN-KI2A5. EmergencyProcedures/Plan2.4.41 SRO (4.6)
Determine if COLR DNBR limit is being met during a loss of COLSS and what action is required.
M/RDetermine Emergency Action LevelANO-2-JPM-NRC-ADMIN- EAL13NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they areretaking only the administrative topics, when all 5 are required.* Type Codes & Criteria:(C)ontrol room, (S)imulator, or Class(R)oom(D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)(N)ew or (M)odified from bank ( 1)(P)revious 2 exams ( 1; randomly selected)
A1. Conduct of Operations              D/R ANO-2-JPM-NRC-ADMIN-DNBRL 2.1.25 SRO (4.2)
ANO-2-JPM-NRC-ADMIN-DNBRL A1     Page 1 of 5ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2REV#: 002DATE:SYSTEM/DUTY AREA:   Conduct of OperationsTASK: Determine if COLR DNBR limit is being met during a loss of COLSS.JTA#: ANO-2-SRO-EOPAOP-OFFNORM-233KA VALUE RO:3.9SRO:4.2KA
Apply Steam Generator Chemistry limits A2. Conduct of Operations              N/R      ANO-2-JPM-NRC-ADMIN-SGCHEM 2.1.34 SRO (3.5)
Apply Tech Specs.
A3. Equipment Control                  D/R      ANO-2-JPM-NRC-ADMIN-EDGTS 2.2.37 SRO (4.6)
Administration of Potassium Iodide.
A4. Radiation Control                M/R        ANO-2-JPM-NRC-ADMIN-KI2 2.3.14 SRO (3.8)
Determine Emergency Action Level A5. Emergency                        M/R        ANO-2-JPM-NRC-ADMIN- EAL13 Procedures/Plan 2.4.41 SRO (4.6)
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria:         (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
Revision 0
 
ANO-2-JPM-NRC-ADMIN-DNBRL                       A1                               Page 1 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                      REV #:   002                      DATE:
SYSTEM/DUTY AREA:           Conduct of Operations TASK:     Determine if COLR DNBR limit is being met during a loss of COLSS.
JTA#:     ANO-2-SRO-EOPAOP-OFFNORM-233 KA VALUE       RO:         3.9    SRO:         4.2        KA


==REFERENCE:==
==REFERENCE:==
2.1.25APPROVED FOR ADMINISTRATION TO:
2.1.25 APPROVED FOR ADMINISTRATION TO:           RO:             SRO:   X TASK LOCATION:           INSIDE CR:             OUTSIDE CR:           BOTH:     X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
RO:SRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:BOTH: XSUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformCLASSROOM: PerformPOSITION EVALUATED: RO:SRO:ACTUAL TESTING ENVIRONMENT: SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD:SIMULATE:PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:15 MinutesREFERENCE(S): Unit 2 Tech Specs and Unit 2 COLREXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:Start TimeStop TimeTotal Time ANO-2-JPM-NRC-ADMIN-DNBRL A1     Page 2 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREJPM INITIAL TASK CONDITIONS
PLANT SITE:                       SIMULATOR:           Perform      CLASSROOM:   Perform POSITION EVALUATED:         RO:                   SRO:
: The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out ofservice for maintenance COLSS has been declared inoperable due to failed power supplies The CPC average DNBR is 2.35 The CPC average ASI is -0.0001 The CPC average LPD is 12.9 KW/FT #1 CEAC is inoperable for Surveillance testing #2 CEAC is operableTASK STANDARD: Determine that Technical Specifications LCO 3.2.4 action b isapplicable.TASK PERFORMANCE AIDS: Unit 2 Tech Specs and Unit 2 COLR ANO-2-JPM-NRC-ADMIN-DNBRL A1     Page 3 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIATING CUE:Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.
ACTUAL TESTING ENVIRONMENT:         SIMULATOR:             PLANT SITE:       CLASSROOM:
START TIME:PERFORMANCE CHECKLIST STANDARD(Circle One)1. Using Tech Spec 3.2.4determines that the COLRmust be referenced todetermine if TS are satisfied.Examinee correctly derivedfrom Tech Spec 3.2.4 thatsince COLSS is inoperable,the COLR graph must bereferenced to determine ifTech Spec 3.2.4 is met.N/A SAT UNSAT (C)2. Using COLR figuredetermines DNBR is not inthe acceptable region foroperation and that Tech SpecLCO 3.2.4.c should beentered.Examinee correctly derivedfrom graph based on givenvalues that DNBR is not in theacceptable region of operationand determined that LCO3.2.4.c is applicable for thecurrent condition.N/A  SAT  UNSAT (C)3. Using Tech 3.2.4 determinethat DNBR must meet therequirements of T.S 3.2.4 action bExaminee correctlydetermines the DNBR must berestored to meet therequirements of the COLRgraph within 2 hours to complywith Tech Spec 3.2.4 action b.N/A  SAT  UNSATEXAMINER's NOTE: Examinee may discuss the Tech Spec applicability at this point statingthat Tech Spec 3.2.4 LCO requires power to be lowered so that DNBR isrestored to the acceptable region within 2 hours.
TESTING METHOD:         SIMULATE:             PERFORM:
ENDSTOP TIME:
APPROXIMATE COMPLETION TIME IN MINUTES:                 15 Minutes REFERENCE(S):     Unit 2 Tech Specs and Unit 2 COLR EXAMINEE'S NAME:                                                 Badge #:
ANO-2-JPM-NRC-ADMIN-DNBRL A1     Page 4 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINER'S COPYJPM INITIAL TASK CONDITIONS
EVALUATOR'S NAME:
: The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out ofservice for maintenance COLSS has been declared inoperable due to failed power supplies The CPC average DNBR is 2.35 The CPC average ASI is -0.0001 The CPC average LPD is 12.9 KW/FT #1 CEAC is inoperable for Surveillance testing #2 CEAC is operableINITIATING CUE:Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.Applicable Tech Spec LCOs (if any) _________________________Actions required to comply with Tech Specs (if any) ______________________________Tech Spec 3.2.4 LCO Action b requires power to be lowered so that DNBR is restored tothe acceptable region within 2 hours.T.S. LCO 3.2.4.cT.S. 3.2.4. Action b ANO-2-JPM-NRC-ADMIN-DNBRL A1     Page 5 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINEE'S COPYJPM INITIAL TASK CONDITIONS
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
: The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out ofservice for maintenance COLSS has been declared inoperable due to failed power supplies. The CPC average DNBR is 2.35 The CPC average ASI is -0.0001 The CPC average LPD is 12.9 KW/FT #1 CEAC is inoperable for Surveillance testing #2 CEAC is operableINITIATING CUE:Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.Applicable Tech Spec LCOs (if any) _________________________Actions required to comply with Tech Specs (if any) ______________________________________________________________________________________________________
SATISFACTORY:                     UNSATISFACTORY:
ANO-2-JPM-NRC-ADMIN-SGCHEM A2     Page 1 of 6ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2REV#: 001DATE:SYSTEM/DUTY AREA:   Conduct of OperationsTASK: Apply Steam Generator Chemistry limits.JTA#: ANO-2-SRO-ADMIN-OFFNORM-2KA VALUE RO:2.7SRO:3.5KA
PERFORMANCE CHECKLIST COMMENTS:
Start Time             Stop Time              Total Time
 
ANO-2-JPM-NRC-ADMIN-DNBRL                 A1                           Page 2 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:
The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out of service for maintenance COLSS has been declared inoperable due to failed power supplies The CPC average DNBR is 2.35 The CPC average ASI is -0.0001 The CPC average LPD is 12.9 KW/FT
      #1 CEAC is inoperable for Surveillance testing
      #2 CEAC is operable TASK STANDARD: Determine that Technical Specifications LCO 3.2.4 action b is applicable.
TASK PERFORMANCE AIDS: Unit 2 Tech Specs and Unit 2 COLR
 
ANO-2-JPM-NRC-ADMIN-DNBRL                       A1                                         Page 3 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.
START TIME:
PERFORMANCE CHECKLIST                             STANDARD                           (Circle One)
N/A SAT UNSAT
: 1. Using Tech Spec 3.2.4                Examinee correctly derived determines that the COLR            from Tech Spec 3.2.4 that must be referenced to                since COLSS is inoperable, determine if TS are satisfied.      the COLR graph must be referenced to determine if Tech Spec 3.2.4 is met.
N/A SAT UNSAT (C)   2. Using COLR figure                    Examinee correctly derived determines DNBR is not in            from graph based on given the acceptable region for            values that DNBR is not in the operation and that Tech Spec        acceptable region of operation LCO 3.2.4.c should be                and determined that LCO entered.                            3.2.4.c is applicable for the current condition.
(C)   3. Using Tech 3.2.4 determine          Examinee correctly                          N/A SAT UNSAT that DNBR must meet the              determines the DNBR must be requirements of T.S 3.2.4           restored to meet the action b                            requirements of the COLR graph within 2 hours to comply with Tech Spec 3.2.4 action b.
EXAMINER's NOTE: Examinee may discuss the Tech Spec applicability at this point stating that Tech Spec 3.2.4 LCO requires power to be lowered so that DNBR is restored to the acceptable region within 2 hours.
END STOP TIME:
 
ANO-2-JPM-NRC-ADMIN-DNBRL                   A1                             Page 4 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out of service for maintenance COLSS has been declared inoperable due to failed power supplies The CPC average DNBR is 2.35 The CPC average ASI is -0.0001 The CPC average LPD is 12.9 KW/FT
      #1 CEAC is inoperable for Surveillance testing
      #2 CEAC is operable INITIATING CUE:
Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.
T.S. LCO 3.2.4.c Applicable Tech Spec LCOs (if any) _________________________
T.S. 3.2.4. Action b Actions required to comply with Tech Specs (if any) ______________________________
Tech Spec 3.2.4 LCO Action b requires power to be lowered so that DNBR is restored to the acceptable region within 2 hours.
 
ANO-2-JPM-NRC-ADMIN-DNBRL                 A1                             Page 5 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out of service for maintenance COLSS has been declared inoperable due to failed power supplies.
The CPC average DNBR is 2.35 The CPC average ASI is -0.0001 The CPC average LPD is 12.9 KW/FT
      #1 CEAC is inoperable for Surveillance testing
      #2 CEAC is operable INITIATING CUE:
Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.
Applicable Tech Spec LCOs (if any) _________________________
Actions required to comply with Tech Specs (if any) ______________________________
 
ANO-2-JPM-NRC-ADMIN-SGCHEM                     A2                               Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                    REV #:   001                      DATE:
SYSTEM/DUTY AREA:         Conduct of Operations TASK:     Apply Steam Generator Chemistry limits.
JTA#:     ANO-2-SRO-ADMIN-OFFNORM-2 KA VALUE       RO:       2.7      SRO:       3.5        KA


==REFERENCE:==
==REFERENCE:==
2.1.34APPROVED FOR ADMINISTRATION TO:
2.1.34 APPROVED FOR ADMINISTRATION TO:           RO:             SRO:   X TASK LOCATION:           INSIDE CR:             OUTSIDE CR:           BOTH:     X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
RO:SRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:BOTH: XSUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformCLASSROOM: PerformPOSITION EVALUATED: RO:SRO:ACTUAL TESTING ENVIRONMENT: SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD:SIMULATE:PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:30 MinutesREFERENCE(S): 1000.043 Steam Generator water Chemistry Monitoring Unit 2EXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:Start TimeStop TimeTotal Time ANO-2-JPM-NRC-ADMIN-SGCHEM A2     Page 2 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREJPM INITIAL TASK CONDITIONS
PLANT SITE:                     SIMULATOR:           Perform      CLASSROOM:   Perform POSITION EVALUATED:       RO:                   SRO:
: The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation. The previous shift raised power from 20% to 80%. All normal chemistry sampling equipment is in service. Chemistry reports the following sample results:Steam Generator Blowdown:Cation conductivity: 0.5 µmho/cmSodium: 3 ppbChloride: 15 ppbSulfate: 12 ppbMain Feedwater:Dissolved O2: 12 ppbTotal Iron: 3 ppbTotal Copper: 0.1 ppbHydrazine: 130 ppbETA: 4.2 ppmCondensate:Dissolved O2: 15 ppbTASK STANDARD
ACTUAL TESTING ENVIRONMENT:         SIMULATOR:             PLANT SITE:       CLASSROOM:
:Determined that Attachment 3 of 1000.043 is applicable for operation >50% power.Determined that Chloride and Sulfate within acceptable values due to 24 hour allowance ofexceeding 50% power.Determined that Feedwater Dissolved O 2 is above action level 2.Determined that plant power should be reduced to <50% within 24 hours of initiation of action level2 and return Feedwater Dissolved O 2 below action level 1 value within 300 hours or go to actionlevel 3.Determined that the following action should be initiated: Check residual hydrazine; if below normal, increase feed rate. Institute air inleakage location efforts. Test other available locations in Feedwater train for dissolved oxygen ingress.TASK PERFORMANCE AIDS: 1000.043 Steam Generator Water Chemistry monitoring Unit 2 ANO-2-JPM-NRC-ADMIN-SGCHEM A2     Page 3 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIATING CUE:Determine if Action Levels are applicable (list your basis) and any Action Level requirements and CorrectiveAction requirements based on current plant Steam Generator and Secondary Water Chemistry.
TESTING METHOD:       SIMULATE:             PERFORM:
START TIME:PERFORMANCE CHECKLIST STANDARD(Circle One)1. Review 1000.043, SteamGenerator Water ChemistryMonitoring Unit 2.Determined that 1000.043,Steam Generator WaterChemistry Monitoring Unit 2should be reviewed forapplicability.N/A  SAT  UNSAT 2.(C)Determine which attachmentshould be used based on currentplant conditions.Determined that 1000.043attachment 3 should be usedto compare value versus limit.N/A  SAT  UNSAT 3.(C)Review provided values toattachment 3 of 1000.043 forSteam Generator Blowdownsamples.Determined that Chloride andSulfate are NOT above theaction level 1 value due tonote 'J' of attachment 3.N/A  SAT  UNSAT 4.(C)Review provided values toattachment 3 of 1000.043 forMain Feedwater samples.Determined that Dissolved O 2is above the action level 2value.N/A SAT UNSAT 5.Review provided values toattachment 3 of 1000.043 forCondensate samples.Determined that CondensateDissolved O 2 is not used as acontrol parameter due to note "G"N/A  SAT  UNSAT ANO-2-JPM-NRC-ADMIN-SGCHEM A2     Page 4 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREPERFORMANCE CHECKLIST STANDARD(Circle One) 6.(C)Review action level 2 forrequirements.Determined action level 2requirements as follows:Reduce power to <50% within24 hours of initiation of actionlevel 2.(Critical portion ofstep)Consider performing hot soak.(Not critical)Return Feedwater Dissolved O 2 below action level 1 valuewithin 300 hours or go toaction level 3.(Criticalportion of step)Perform technical reviewassessing the abnormal waterchemistry condition.(Not critical)N/A  SAT  UNSAT 7.(C)Review 1000.043, Attachment 6to determine action requiredbased on plant conditions.Determined the followingactions:Check residual hydrazine; ifbelow normal, increase feed rate.Institute air inleakage location efforts.Test other available locationsin Feedwater train fordissolved oxygen ingress.N/A  SAT  UNSAT ENDSTOP TIME:
APPROXIMATE COMPLETION TIME IN MINUTES:                 30 Minutes REFERENCE(S):     1000.043 Steam Generator water Chemistry Monitoring Unit 2 EXAMINEE'S NAME:                                               Badge #:
ANO-2-JPM-NRC-ADMIN-SGCHEM A2     Page 5 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINER'S COPYINITIAL CONDITIONS
EVALUATOR'S NAME:
: The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation. The previous shift raised power from 20% to 80%. All normal chemistry sampling equipment is in service. Chemistry reports the following sample results:Steam Generator Blowdown:Cation conductivity: 0.5 &#xb5;mho/cmSodium: 3 ppbChloride: 15 ppbSulfate: 12 ppbMain Feedwater:Dissolved O2: 12 ppb Total Iron: 3 ppbTotal Copper: 0.1 ppbHydrazine: 130 ppbETA: 4.2 ppm Condensate:Dissolved O2: 15 ppbINITIATING CUE:Determine if Action Levels are applicable (list your basis) and any Action Levelrequirements and Corrective Action requirements based on current plant Steam Generatorand Secondary Water Chemistry.
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
ANO-2-JPM-NRC-ADMIN-SGCHEM A2     Page 6 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINEE'S COPYINITIAL CONDITIONS
SATISFACTORY:                     UNSATISFACTORY:
: The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation. The previous shift raised power from 20% to 80%. All normal chemistry sampling equipment is in service. Chemistry reports the following sample results:Steam Generator Blowdown:Cation conductivity: 0.5 &#xb5;mho/cmSodium: 3 ppbChloride: 15 ppbSulfate: 12 ppbMain Feedwater:Dissolved O2: 12 ppb Total Iron: 3 ppbTotal Copper: 0.1 ppbHydrazine: 130 ppbETA: 4.2 ppm Condensate:Dissolved O2: 15 ppbINITIATING CUE:Determine if Action Levels are applicable (list your basis) and any Action Levelrequirements and Corrective Action requirements based on current plant Steam Generatorand Secondary Water Chemistry.
PERFORMANCE CHECKLIST COMMENTS:
ANO-2-JPM-NRC-ADMIN-EDGTS A3     Page 1 of 5ADMINISTRATIVE JOB PERFORMANCE MEASURE 2REV#: 2DATE:SYSTEM/DUTY AREA:   Equipment controlsTASK:   Determine EDG and PZR TS applicability and any required actions.JTA#: ANO-SRO-ADMIN-NORM-103KA VALUE RO:3.6SRO:4.6KA
Start Time           Stop Time              Total Time
 
ANO-2-JPM-NRC-ADMIN-SGCHEM                         A2                                 Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:
The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation.
The previous shift raised power from 20% to 80%.
All normal chemistry sampling equipment is in service.
Chemistry reports the following sample results:
Steam Generator Blowdown:
Cation conductivity: 0.5 &#xb5;mho/cm Sodium: 3 ppb Chloride: 15 ppb Sulfate: 12 ppb Main Feedwater:
Dissolved O2: 12 ppb Total Iron: 3 ppb Total Copper: 0.1 ppb Hydrazine: 130 ppb ETA: 4.2 ppm Condensate:
Dissolved O2: 15 ppb TASK STANDARD:
Determined that Attachment 3 of 1000.043 is applicable for operation >50% power.
Determined that Chloride and Sulfate within acceptable values due to 24 hour allowance of exceeding 50% power.
Determined that Feedwater Dissolved O2 is above action level 2.
Determined that plant power should be reduced to <50% within 24 hours of initiation of action level 2 and return Feedwater Dissolved O2 below action level 1 value within 300 hours or go to action level 3.
Determined that the following action should be initiated:
Check residual hydrazine; if below normal, increase feed rate.
Institute air inleakage location efforts.
Test other available locations in Feedwater train for dissolved oxygen ingress.
TASK PERFORMANCE AIDS: 1000.043 Steam Generator Water Chemistry monitoring Unit 2
 
ANO-2-JPM-NRC-ADMIN-SGCHEM                           A2                                     Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
Determine if Action Levels are applicable (list your basis) and any Action Level requirements and Corrective Action requirements based on current plant Steam Generator and Secondary Water Chemistry.
START TIME:
PERFORMANCE CHECKLIST                                 STANDARD                       (Circle One)
: 1. Review 1000.043, Steam                      Determined that 1000.043, Generator Water Chemistry                  Steam Generator Water                  N/A SAT UNSAT Monitoring Unit 2.                          Chemistry Monitoring Unit 2 should be reviewed for applicability.
: 2. Determine which attachment                  Determined that 1000.043 (C)   should be used based on current            attachment 3 should be used            N/A SAT UNSAT plant conditions.                          to compare value versus limit.
: 3. Review provided values to                  Determined that Chloride and (C)   attachment 3 of 1000.043 for                Sulfate are NOT above the              N/A SAT UNSAT Steam Generator Blowdown                    action level 1 value due to samples.                                    note J of attachment 3.
: 4. Review provided values to                  Determined that Dissolved O2 (C)   attachment 3 of 1000.043 for                is above the action level 2            N/A SAT UNSAT Main Feedwater samples.                    value.
: 5. Review provided values to                  Determined that Condensate attachment 3 of 1000.043 for                Dissolved O2 is not used as a          N/A SAT UNSAT Condensate samples.                        control parameter due to note G
 
ANO-2-JPM-NRC-ADMIN-SGCHEM           A2                               Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                 STANDARD                 (Circle One)
: 6. Review action level 2 for    Determined action level 2 (C)  requirements.                requirements as follows:         N/A SAT UNSAT Reduce power to <50% within 24 hours of initiation of action level 2. (Critical portion of step)
Consider performing hot soak.
(Not critical)
Return Feedwater Dissolved O2 below action level 1 value within 300 hours or go to action level 3. (Critical portion of step)
Perform technical review assessing the abnormal water chemistry condition. (Not critical)
: 7. Review 1000.043, Attachment 6 Determined the following (C)  to determine action required  actions:                        N/A SAT UNSAT based on plant conditions.
Check residual hydrazine; if below normal, increase feed rate.
Institute air inleakage location efforts.
Test other available locations in Feedwater train for dissolved oxygen ingress.
END STOP TIME:
 
ANO-2-JPM-NRC-ADMIN-SGCHEM                   A2                               Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:
The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation.
The previous shift raised power from 20% to 80%.
All normal chemistry sampling equipment is in service.
Chemistry reports the following sample results:
Steam Generator Blowdown:
Cation conductivity: 0.5 &#xb5;mho/cm Sodium: 3 ppb Chloride: 15 ppb Sulfate: 12 ppb Main Feedwater:
Dissolved O2: 12 ppb Total Iron: 3 ppb Total Copper: 0.1 ppb Hydrazine: 130 ppb ETA: 4.2 ppm Condensate:
Dissolved O2: 15 ppb INITIATING CUE:
Determine if Action Levels are applicable (list your basis) and any Action Level requirements and Corrective Action requirements based on current plant Steam Generator and Secondary Water Chemistry.
 
ANO-2-JPM-NRC-ADMIN-SGCHEM                   A2                               Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL CONDITIONS:
The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation.
The previous shift raised power from 20% to 80%.
All normal chemistry sampling equipment is in service.
Chemistry reports the following sample results:
Steam Generator Blowdown:
Cation conductivity: 0.5 &#xb5;mho/cm Sodium: 3 ppb Chloride: 15 ppb Sulfate: 12 ppb Main Feedwater:
Dissolved O2: 12 ppb Total Iron: 3 ppb Total Copper: 0.1 ppb Hydrazine: 130 ppb ETA: 4.2 ppm Condensate:
Dissolved O2: 15 ppb INITIATING CUE:
Determine if Action Levels are applicable (list your basis) and any Action Level requirements and Corrective Action requirements based on current plant Steam Generator and Secondary Water Chemistry.
 
ANO-2-JPM-NRC-ADMIN-EDGTS                   A3                                     Page 1 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE 2                      REV #:     2                      DATE:
SYSTEM/DUTY AREA:         Equipment controls TASK:       Determine EDG and PZR TS applicability and any required actions.
JTA#:     ANO-SRO-ADMIN-NORM-103 KA VALUE       RO:       3.6      SRO:         4.6        KA


==REFERENCE:==
==REFERENCE:==
2.2.37APPROVED FOR ADMINISTRATION TO:
2.2.37 APPROVED FOR ADMINISTRATION TO:             RO:             SRO:   X TASK LOCATION:           INSIDE CR:               OUTSIDE CR:             BOTH:       X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
RO:SRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:BOTH: XSUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformCLASSROOM: PerformPOSITION EVALUATED: RO:SRO:ACTUAL TESTING ENVIRONMENT: SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD:SIMULATE:PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:15 MinutesREFERENCE(S): 2203.012-H, Annunciator 2K08 Corrective Actions, 2203.012-U, Annunciator 2E12Corrective Action, Unit 2 Tech Specs.EXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:Start TimeStop TimeTotal Time ANO-2-JPM-NRC-ADMIN-EDGTS A3     Page 2 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIAL CONDITIONS: Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 "Fuel x-fer pump inoperable", there isno light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.TASK STANDARD
PLANT SITE:                       SIMULATOR:           Perform      CLASSROOM:     Perform POSITION EVALUATED:         RO:                     SRO:
:Determined the current applicable Tech Specs: T.S. 3.8.1.1.b T.S. 3.4.4Determined the most restrictive Required Action: 3.8.1.1 Action b.1Demonstrate the OPERABILITY of both the A.C. circuits by performing Surveillance Requirement4.8.1.1.1.a within 1 hour and at least once per 8 hours thereafterTASK PERFORMANCE AIDS
ACTUAL TESTING ENVIRONMENT:         SIMULATOR:             PLANT SITE:         CLASSROOM:
:2203.012-H, Annunciator 2K08 Corrective Actions, 2203.012-U, Annunciator 2E12 Corrective Action, Unit 2Tech Specs.SIMULATOR SETUPN/AEXAMINER NOTES:
TESTING METHOD:       SIMULATE:                 PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                   15 Minutes REFERENCE(S):     2203.012-H, Annunciator 2K08 Corrective Actions, 2203.012-U, Annunciator 2E12 Corrective Action, Unit 2 Tech Specs.
EXAMINEE'S NAME:                                                 Badge #:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                     UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time           Stop Time                Total Time
 
ANO-2-JPM-NRC-ADMIN-EDGTS                       A3                                           Page 2 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 Fuel x-fer pump inoperable, there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.
TASK STANDARD:
Determined the current applicable Tech Specs:
T.S. 3.8.1.1.b T.S. 3.4.4 Determined the most restrictive Required Action:
3.8.1.1 Action b.1 Demonstrate the OPERABILITY of both the A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour and at least once per 8 hours thereafter TASK PERFORMANCE AIDS:
2203.012-H, Annunciator 2K08 Corrective Actions, 2203.012-U, Annunciator 2E12 Corrective Action, Unit 2 Tech Specs.
SIMULATOR SETUP N/A EXAMINER NOTES:
None.
None.
ANO-2-JPM-NRC-ADMIN-EDGTS A3     Page 3 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIATING CUE: Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 "Fuel x-fer pump inoperable", there isno light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.Determine ALL current applicable Unit 2 Tech Specs associated with this condition ANDIdentify the most restrictive Required Action.
 
START TIME:PERFORMANCE CHECKLIST STANDARD(Circle One) 1.Review Annunciator corrective actionfor applicabilityReferenced 2K-08 and 2E-12Annunciator corrective actionsdetermined need to review TechSpecsN/A  SAT  UNSAT 2.(C)Review 3.8.1.1 Tech Spec forapplicabilityExaminee reviewed T.S. 3.8.1.1.band determined that the #1 EDG isinoperable and determines action bis applicable.N/A  SAT  UNSATReview for additional Tech Specs.Using Tech Specs or 2104.036 EDGprocedure, determined that Tech3.4.4 should also be reviewed.N/A  SAT  UNSAT 3.(C)Review 3.4.4 Tech Spec for applicabilityExaminee reviewed T.S. 3.4.4 anddetermined that the Pressurizer isinoperable and determines action bis applicable.N/A SAT UNSAT 4.(C)Review applicable actions anddetermine most limiting requirement.Examinee reviewed the applicableTech Specs and determined thatT.S. 3.8.1.1 action b.1 is the mostlimiting action requirement.N/A  SAT  UNSAT ENDSTOP TIME:
ANO-2-JPM-NRC-ADMIN-EDGTS                       A3                                           Page 3 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
ANO-2-JPM-NRC-ADMIN-EDGTS A3     Page 4 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINER'S COPYINITIAL CONDITIONS
Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 Fuel x-fer pump inoperable, there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.
: Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 "Fuel x-fer pumpinoperable", there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker2B53-K3 is tripped.INITIATING CUE:Determine ALL current applicable Unit 2 Tech Specs associated with this condition ANDIdentify the most restrictive Required Action.Current applicable Tech Specs: T.S. 3.8.1.1.b T.S. 3.4.4Most restrictive Required Action: 3.8.1.1 Action b.1Demonstrate the OPERABILITY of both the A.C. circuits by performing SurveillanceRequirement 4.8.1.1.1.a within 1 hour and at least once per 8 hours thereafter ANO-2-JPM-NRC-ADMIN-EDGTS A3     Page 5 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINEE'S COPYINITIAL CONDITIONS
Determine ALL current applicable Unit 2 Tech Specs associated with this condition AND Identify the most restrictive Required Action.
: Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 "Fuel x-fer pumpinoperable", there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker2B53-K3 is tripped.INITIATING CUE:Determine ALL current applicable Unit 2 Tech Specs associated with this condition ANDIdentify the most restrictive Required Action.Current applicable Tech Specs:________________________________________________________________________________________________________________________________________________Most restrictive Required Action:_____________________________________________________________________________________________________________________________________________________________________________________________________________________
START TIME:
ANO-2-JPM-NRC-ADMIN-KI2 A4     Page 1 of 6ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2REV#: 0DATE:SYSTEM/DUTY AREA:   Radiation ControlsTASK:   Approve administration of Potassium Iodide.JTA#: ANO-SRO-EPLAN-EMERG-292KA VALUE RO:3.4SRO:3.8KA
PERFORMANCE CHECKLIST                                 STANDARD                     (Circle One)
: 1. Review Annunciator corrective action        Referenced 2K-08 and 2E-12                N/A SAT UNSAT for applicability                            Annunciator corrective actions determined need to review Tech Specs
: 2. Review 3.8.1.1 Tech Spec for                Examinee reviewed T.S. 3.8.1.1.b          N/A SAT UNSAT (C)    applicability                                and determined that the #1 EDG is inoperable and determines action b is applicable.
Review for additional Tech Specs.           Using Tech Specs or 2104.036 EDG          N/A SAT UNSAT procedure, determined that Tech 3.4.4 should also be reviewed.
: 3. Review 3.4.4 Tech Spec for applicability    Examinee reviewed T.S. 3.4.4 and          N/A SAT UNSAT (C)                                                determined that the Pressurizer is inoperable and determines action b is applicable.
: 4. Review applicable actions and                Examinee reviewed the applicable          N/A SAT UNSAT (C)   determine most limiting requirement.         Tech Specs and determined that T.S. 3.8.1.1 action b.1 is the most limiting action requirement.
END STOP TIME:
 
ANO-2-JPM-NRC-ADMIN-EDGTS                 A3                                 Page 4 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:
Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 Fuel x-fer pump inoperable, there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.
INITIATING CUE:
Determine ALL current applicable Unit 2 Tech Specs associated with this condition AND Identify the most restrictive Required Action.
Current applicable Tech Specs:
T.S. 3.8.1.1.b T.S. 3.4.4 Most restrictive Required Action:
3.8.1.1 Action b.1 Demonstrate the OPERABILITY of both the A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour and at least once per 8 hours thereafter
 
ANO-2-JPM-NRC-ADMIN-EDGTS                 A3                                 Page 5 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL CONDITIONS:
Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 Fuel x-fer pump inoperable, there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.
INITIATING CUE:
Determine ALL current applicable Unit 2 Tech Specs associated with this condition AND Identify the most restrictive Required Action.
Current applicable Tech Specs:
Most restrictive Required Action:
 
ANO-2-JPM-NRC-ADMIN-KI2                   A4                                     Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                      REV #:     0                      DATE:
SYSTEM/DUTY AREA:         Radiation Controls TASK:       Approve administration of Potassium Iodide.
JTA#:     ANO-SRO-EPLAN-EMERG-292 KA VALUE       RO:       3.4      SRO:         3.8        KA


==REFERENCE:==
==REFERENCE:==
2.3.14APPROVED FOR ADMINISTRATION TO:
2.3.14 APPROVED FOR ADMINISTRATION TO:           RO:             SRO:   X TASK LOCATION:           INSIDE CR:               OUTSIDE CR:             BOTH:       X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
RO:SRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:BOTH: XSUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformCLASSROOM: PerformPOSITION EVALUATED: RO:SRO:ACTUAL TESTING ENVIRONMENT: SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD:SIMULATE:PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:20 MinutesREFERENCE(S): 1903.035, Administration of Potassium IodideEXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:Start TimeStop TimeTotal Time ANO-2-JPM-NRC-ADMIN-KI2 A4     Page 2 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIAL CONDITIONS
PLANT SITE:                       SIMULATOR:           Perform      CLASSROOM:     Perform POSITION EVALUATED:       RO:                     SRO:
: The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05ci/cc in area of work in Upper SouthPiping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actionsand stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodideif required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will beused in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operationalTASK STANDARD
ACTUAL TESTING ENVIRONMENT:         SIMULATOR:             PLANT SITE:         CLASSROOM:
:Correctly completed Potassium Iodide (KI) Administration Form 1903.035A ANDDid not approve the administration of KI to Joe Mechanic.TASK PERFORMANCE AIDS: 1903.0035, Potassium Iodide Administration, Form1903.035C (Completed), ANO Medical Questionnaire-Iodine Sensitivity and Form1903.035A, Potassium Iodide Administration.
TESTING METHOD:       SIMULATE:               PERFORM:
ANO-2-JPM-NRC-ADMIN-KI2 A4     Page 3 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIATING CUE: Determine if KI, Potassium Iodide, should be issued and completenecessary paperwork, using OP 1903.035.
APPROXIMATE COMPLETION TIME IN MINUTES:                 20 Minutes REFERENCE(S):     1903.035, Administration of Potassium Iodide EXAMINEE'S NAME:                                                 Badge #:
START TIME:Examiner Note: Provide the examinee a KI Administration Form 1903.035A and a MedicalQuestionnaire-Iodine Sensitivity Form 1903.035C that has been completed by JoeMechanicPERFORMANCE CHECKLIST STANDARD(Circle One)1. Review 1903.035,Administration of PotassiumIodide to determine criteria foradministering KI.(Step 6.1.1 and Step 6.2.3.C.1)Examinee determined thecriteria for administration of KIis 10 REM exposure to thyroidcommitted dose equivalent orif concentration is unknown,the possibility exists forreceiving large amounts ofradioactive airborne iodine.N/A SAT UNSAT (C)2. Using graph on 1903.035Attachment 1 and informationprovided in initial conditions,determine that Joe Mechanicwill exceed 10 REM duringthe maintenance evolution.(Step 6.2.3.B)Determined that expectedexposure will exceed 10 REMthreshold.N/A SAT UNSAT3. Complete form 1903.035A.(Step 6.3)Completed all areas of form1903.035A, Potassium IodideAdministration, from initial conditions: Estimated Thyroid dosecommitment. Date. Respiratory Protection Factor.N/A  SAT  UNSAT ANO-2-JPM-NRC-ADMIN-KI2 A4     Page 4 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREExaminer Note: Provide the examinee a KI Administration Form 1903.035A and a MedicalQuestionnaire-Iodine Sensitivity Form 1903.035C that has been completed by JoeMechanicPERFORMANCE CHECKLIST STANDARD(Circle One)(C)4. Determine that Joe Mechanicis sensitive to and hasexperienced an allergicreaction to Iodide.Reviewed 1903.035C formand determined that JoeMechanic was sensitive toiodine and has experienced anallergic reaction to iodine in the past.N/A SAT UNSAT (C)5. Determine that KI shouldbe NOT approved fordistribution to JoeMechanic during theUpper South Pipingpenetration work.Examinee did NOT approvedistribution of KI to Joe Mechanic.N/A  SAT  UNSAT ENDSTOP TIME:
EVALUATOR'S NAME:
ANO-2-JPM-NRC-ADMIN-KI2 A4     Page 5 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINER'S COPYINITIAL CONDITIONS
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
: The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05ci/cc in area of work in Upper SouthPiping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actionsand stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodideif required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will beused in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operationalINITIATING CUE:Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork,using OP 1903.035.
SATISFACTORY:                     UNSATISFACTORY:
ANO-2-JPM-NRC-ADMIN-KI2 A4     Page 6 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINEE'S COPYINITIAL CONDITIONS
PERFORMANCE CHECKLIST COMMENTS:
: The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05ci/cc in area of work in Upper SouthPiping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actionsand stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodideif required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will beused in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operationalINITIATING CUE:Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork,using OP 1903.035.
Start Time           Stop Time              Total Time
ANO-2-JPM-NRC-ADMIN-EAL13 A5     Page 1 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREUNIT: 2 REV#: 004DATE:SYSTEM/DUTY AREA: Emergency PlanTASK: Determine Emergency Action Level/Protective Action Recommendation (Time Critical JPM)JTA#: ANO-SRO-EPLAN-EMERG-278KA VALUERO:2.9SRO:4.6KA
 
ANO-2-JPM-NRC-ADMIN-KI2                 A4                                     Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05 ci/cc in area of work in Upper South Piping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actions and stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodide if required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will be used in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operational TASK STANDARD:
Correctly completed Potassium Iodide (KI) Administration Form 1903.035A AND Did not approve the administration of KI to Joe Mechanic.
TASK PERFORMANCE AIDS: 1903.0035, Potassium Iodide Administration, Form 1903.035C (Completed), ANO Medical Questionnaire-Iodine Sensitivity and Form 1903.035A, Potassium Iodide Administration.
 
ANO-2-JPM-NRC-ADMIN-KI2                 A4                                   Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE: Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork, using OP 1903.035.
START TIME:
Examiner Note: Provide the examinee a KI Administration Form 1903.035A and a Medical Questionnaire-Iodine Sensitivity Form 1903.035C that has been completed by Joe Mechanic PERFORMANCE CHECKLIST                         STANDARD                 (Circle One)
N/A SAT UNSAT
: 1. Review 1903.035,                 Examinee determined the Administration of Potassium      criteria for administration of KI Iodide to determine criteria for  is 10 REM exposure to thyroid administering KI.                 committed dose equivalent or if concentration is unknown, (Step 6.1.1 and Step 6.2.3.C.1)     the possibility exists for receiving large amounts of radioactive airborne iodine.
N/A SAT UNSAT (C) 2. Using graph on 1903.035          Determined that expected Attachment 1 and information      exposure will exceed 10 REM provided in initial conditions,   threshold.
determine that Joe Mechanic will exceed 10 REM during the maintenance evolution.
(Step 6.2.3.B)
N/A SAT UNSAT
: 3. Complete form 1903.035A.         Completed all areas of form 1903.035A, Potassium Iodide (Step 6.3)                          Administration, from initial conditions:
Estimated Thyroid dose commitment.
Date.
Respiratory Protection Factor.
 
ANO-2-JPM-NRC-ADMIN-KI2             A4                               Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Examiner Note: Provide the examinee a KI Administration Form 1903.035A and a Medical Questionnaire-Iodine Sensitivity Form 1903.035C that has been completed by Joe Mechanic PERFORMANCE CHECKLIST                     STANDARD               (Circle One)
N/A SAT UNSAT (C)   4. Determine that Joe Mechanic  Reviewed 1903.035C form is sensitive to and has      and determined that Joe experienced an allergic      Mechanic was sensitive to reaction to Iodide.          iodine and has experienced an allergic reaction to iodine in the past.
N/A SAT UNSAT (C)     5. Determine that KI should  Examinee did NOT approve be NOT approved for      distribution of KI to Joe distribution to Joe      Mechanic.
Mechanic during the Upper South Piping penetration work.
END STOP TIME:
 
ANO-2-JPM-NRC-ADMIN-KI2                 A4                                     Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:
The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05 ci/cc in area of work in Upper South Piping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actions and stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodide if required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will be used in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operational INITIATING CUE:
Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork, using OP 1903.035.
 
ANO-2-JPM-NRC-ADMIN-KI2                 A4                                     Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL CONDITIONS:
The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05 ci/cc in area of work in Upper South Piping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actions and stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodide if required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will be used in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operational INITIATING CUE:
Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork, using OP 1903.035.
 
ANO-2-JPM-NRC-ADMIN-EAL13             A5                                       Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:   2                     REV #:   004                      DATE:
SYSTEM/DUTY AREA:     Emergency Plan TASK:   Determine Emergency Action Level/Protective Action Recommendation (Time Critical JPM)
JTA#:   ANO-SRO-EPLAN-EMERG-278 KA VALUE    RO:       2.9      SRO:       4.6      KA


==REFERENCE:==
==REFERENCE:==
2.4.41APPROVED FOR ADMINISTRATION TO: RO:
2.4.41 APPROVED FOR ADMINISTRATION TO:       RO:             SRO:     X TASK LOCATION:         INSIDE CR:             OUTSIDE CR:               BOTH:   X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:BOTH: XSUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:Classroom:PerformPOSITION EVALUATED: RO:SRO:ACTUAL TESTING ENVIRONMENT: SIMULATOR:PLANT SITE:LAB:TESTING METHOD: SIMULATE:
PLANT SITE:                 SIMULATOR:                 Classroom:       Perform POSITION EVALUATED:     RO:                   SRO:
PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:15 Minutes - EAL Classification,5 Minutes - BoundarydeterminationREFERENCE(S): 1903.010 Emergency Action Level ClassificationEXAMINEE'S NAME:BADGE:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED INTHIS JPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:StartTime StopTimeTotal Time ANO-2-JPM-NRC-ADMIN-EAL13 A5     Page 2 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIAL CONDITIONS
ACTUAL TESTING ENVIRONMENT:       SIMULATOR:             PLANT SITE:             LAB:
: (Time Critical JPM)A plant trip has occurred due to a loss of offsite power with a concurrent SteamGenerator tube rupture on the "B" Steam Generator estimated to be 200 gpm.One Main Steam Safety Valve on the "B" header has stuck open.1 hour following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19per chemistry sampling procedureRCS T-cold is 355&deg;FPZR pressure is 1170 psiaTASK STANDARD: Determined the following (Time Critical - 15 minutes to classify event):Determined SAE (FS-1) is the appropriate EAL. (Time Critical)Determined two or the three fission product barriers are failed or potentially failed. (NotTime Critical) RCB1: RCS leakage > 44 GPM or RCB2: SGTR results in ECCS actuation CNB3: Primary to secondary leak in steam generator > 10 gpm with stuck openmain steam safety valveDetermined that Fuel boundary is not failed. (Time Critical)TASK PERFORMANCE AIDS: 1903.010, Emergency Action Level Classification ANO-2-JPM-NRC-ADMIN-EAL13 A5     Page 3 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIATING CUE:Determine the status of thefission product boundaries and the highest EAL classification from the given initialconditions (list EAL classification and event number).START:PERFORMANCECHECKLISTSTANDARD(Circle One)(C)1.Determined "SAE" EALclassification.Using OP 1903.010, determined"SAE" EAL classification FS1, Lossor potential loss of ANY twobarriers.Stop Time:__________
TESTING METHOD:     SIMULATE:             PERFORM:
N/A  SAT  UNSAT (C)2.EAL determination made in15 minutes.EAL determined within 15 minutes.
15 Minutes - EAL Classification, APPROXIMATE COMPLETION TIME IN MINUTES:           5 Minutes - Boundary determination REFERENCE(S):   1903.010 Emergency Action Level Classification EXAMINEE'S NAME:                                             BADGE:
N/A SAT UNSAT (C)3.Determined RCS barrierstatus.Determined RCS barrier Lost orPotentially Lost using given 200 gpmPri-Sec leak per OP 1903.010,Attachment 2, RCB1. RCS leak > 44gpm with letdown isolated and/orRCB2 SGTR results in ECCSactuation.
EVALUATOR'S NAME:
N/A  SAT  UNSAT (C)4.Determined Containmentfission product barrierstatus.Determined Containment barrier lostusing given stuck open main steamsafety valve on Steam Generatorwith pri-sec leak per 1903.010,Attachment 2 CNB3.
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
N/A  SAT  UNSAT (C)5.Determined Fuel Cladbarrier status.Determined Fuel Clad barrierNOTLost IAW per 1903.010, Attachment 2.N/A  SAT  UNSAT ENDSTOP:
SATISFACTORY:                   UNSATISFACTORY:
ANO-2-JPM-NRC-ADMIN-EAL13 A5     Page 4 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREExaminer's CopyThis JPM (Cue #1) is time criticalINITIAL CONDITIONS
PERFORMANCE CHECKLIST COMMENTS:
:A plant trip has occurred due to a loss of offsite power with a concurrent SteamGenerator tube rupture on the "B" Steam Generator estimated to be 200 gpm.One Main Steam Safety Valve on the "B" header has stuck open.1 hour following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19per chemistry sampling procedureRCS T-cold is 355&deg;FPZR pressure is 1170 psiaINITIATING CUE #1:Determine the status of the EAL classification and Event number/code from the given initialconditions.EAL ClassEvent number/code SAE FS-1INITIATING CUE #2:Determine the status of the fission product boundaries:Fission product boundary status:(Failed or Intact)Barrier EAL number, code, etc. ifapplicable.ContainmentFailed CNB3 RCSFailedRCB1 and/or RCB2FuelIntactN/A ANO-2-JPM-NRC-ADMIN-EAL13 A5     Page 5 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREExaminee's CopyThis JPM is time criticalINITIAL CONDITIONS
Start              Stop                  Total Time Time                Time
:A plant trip has occurred due to a loss of offsite power with a concurrent SteamGenerator tube rupture on the "B" Steam Generator estimated to be 200 gpm.One Main Steam Safety Valve on the "B" header has stuck open.1 hour following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19per chemistry sampling procedureRCS T-cold is 355&deg;FPZR pressure is 1170 psiaINITIATING CUE #1:Determine the status of the EAL classification from the given initial conditionsEAL ClassificationEvent number/code ANO-2-JPM-NRC-ADMIN-EAL13 A5     Page 6 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREExaminee's CopyINITIAL CONDITIONS
 
:A plant trip has occurred due to a loss of offsite power with a concurrent SteamGenerator tube rupture on the "B" Steam Generator estimated to be 200 gpm.One Main Steam Safety Valve on the "B" header has stuck open.1 hour following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19per chemistry sampling procedureRCS T-cold is 355&deg;FPZR pressure is 1170 psiaINITIATING CUE #2:Determine the status of the fission product boundaries:Fission product boundary status:(Failed or Intact)Barrier EAL number, code, etc. ifapplicable.Containment RCSFuel Revision 1ES-301Control Room/In-Plant Systems OutlineForm ES-301-2Facility: Arkansas Nuclear One Unit 2                                         Date of Examination: July 2014Exam Level: RO     SRO-I     SRO-U XOperating Test No.:   2014-2Control Room Systems
ANO-2-JPM-NRC-ADMIN-EAL13             A5                                     Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL CONDITIONS: (Time Critical JPM)
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)System / JPM TitleType Code*Safety Function S1.ANO-2-JPM-NRC-AOP2022 A4.04 RO-3.1/SRO-3.2Reset CIAS and restore cooling water to containmentD/EN/S 5Containment S2.ANO-2-JPM-NRC-AOP5027 AA1.01 RO-4.0/SRO-3.9Respond to a failed close PZR spray valveA/N/S 3Pressure Control S3.ANO-2-JPM-NRC-RCP02003 A4.08 RO-3.2/SRO-2.9Restore component cooling water to reactor coolant pumpsA/D/S 4RCS Heat RemovalS4.S5.S6.S7.S8.In-Plant Systems
A plant trip has occurred due to a loss of offsite power with a concurrent Steam Generator tube rupture on the B Steam Generator estimated to be 200 gpm.
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)P1. ANO-2-JPM-AACFO064 K1.03 RO-3.6/SRO-4.0Control AAC diesel fuel oil day tank level manually.A/D/E/L 6ElectricalP2.ANO-2-JPM-NRC-FPEM1033 A2.03 RO-3.1/SRO-3.5Perform emergency SW make up to SFPE/L/P/R 8Plant servicesystemsP3.@All RO and SRO-I control room (and in-plant) systems must be different and serve different safetyfunctions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions mayoverlap those tested in the control room.* Type CodesCriteria for RO / SRO-I / SRO-U(A)lternate path(C)ontrol room(D)irect from bank(E)mergency or abnormal in-plant(EN)gineered safety feature(L)ow-Power / Shutdown(N)ew or (M)odified from bank including 1(A)(P)revious 2 exams(R)CA(S)imulator4-6 / 4-6 / 2-3 9 /  8 /  4 1 / 1 /  1  -  /  -  /  1 (control room system) 1 /  1 /  1 2 /  2 /  1 3 /  3 /  2 (randomly selected) 1 /  1 /  1 ANO-2-JPM-NRC-AOP02 S1PAGE  1  OF 7JOB PERFORMANCE MEASUREUNIT: 2 REV#: 002DATE:SYSTEM/DUTY AREA:Containment Cooling Water SystemTASK:Reset CIAS and establish cooling water to containmentJTA#: ANO2-RO-EOPAOP-OFFNORM-219Alternate Path Yes:No: XTime Critical:
One Main Steam Safety Valve on the B header has stuck open.
Yes:No: XKA VALUERO:3.1SRO:3.2KA
1 hour following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19 per chemistry sampling procedure RCS T-cold is 355&deg;F PZR pressure is 1170 psia TASK STANDARD: Determined the following (Time Critical - 15 minutes to classify event):
Determined SAE (FS-1) is the appropriate EAL. (Time Critical)
Determined two or the three fission product barriers are failed or potentially failed. (Not Time Critical)
RCB1: RCS leakage > 44 GPM or RCB2: SGTR results in ECCS actuation CNB3: Primary to secondary leak in steam generator > 10 gpm with stuck open main steam safety valve Determined that Fuel boundary is not failed. (Time Critical)
TASK PERFORMANCE AIDS: 1903.010, Emergency Action Level Classification
 
ANO-2-JPM-NRC-ADMIN-EAL13                       A5                                           Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
Determine the status of the fission product boundaries and the highest EAL classification from the given initial conditions (list EAL classification and event number).
START:
PERFORMANCE                            STANDARD                      (Circle One)
CHECKLIST (C)   1.       Determined SAE EAL            Using OP 1903.010, determined           N/A SAT UNSAT classification.                  SAE EAL classification FS1, Loss or potential loss of ANY two barriers.
Stop Time:__________
(C)   2.
EAL determination made in        EAL determined within 15 minutes.       N/A SAT UNSAT 15 minutes.
(C)   3.       Determined RCS barrier        Determined RCS barrier Lost or status.                        Potentially Lost using given 200 gpm      N/A SAT UNSAT Pri-Sec leak per OP 1903.010, Attachment 2, RCB1. RCS leak > 44 gpm with letdown isolated and/or RCB2 SGTR results in ECCS actuation.
Determined Containment        Determined Containment barrier lost (C)   4.       fission product barrier       using given stuck open main steam        N/A SAT UNSAT status.                        safety valve on Steam Generator with pri-sec leak per 1903.010, Attachment 2 CNB3.
Determined Fuel Clad          Determined Fuel Clad barrier NOT (C)   5.                                                                                 N/A SAT UNSAT barrier status.               Lost IAW per 1903.010, Attachment 2.
END STOP:
 
ANO-2-JPM-NRC-ADMIN-EAL13                   A5                                 Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Examiners Copy This JPM (Cue #1) is time critical INITIAL CONDITIONS:
A plant trip has occurred due to a loss of offsite power with a concurrent Steam Generator tube rupture on the B Steam Generator estimated to be 200 gpm.
One Main Steam Safety Valve on the B header has stuck open.
1 hour following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19 per chemistry sampling procedure RCS T-cold is 355&deg;F PZR pressure is 1170 psia INITIATING CUE #1:
Determine the status of the EAL classification and Event number/code from the given initial conditions.
EAL Class                Event number/code SAE                     FS-1 INITIATING CUE #2:
Determine the status of the fission product boundaries:
Fission product boundary status: Barrier EAL number, code, etc. if (Failed or Intact)                applicable.
Containment                    Failed                            CNB3 RCS                            Failed                            RCB1 and/or RCB2 Fuel                          Intact                            N/A
 
ANO-2-JPM-NRC-ADMIN-EAL13             A5                                     Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Examinees Copy This JPM is time critical INITIAL CONDITIONS:
A plant trip has occurred due to a loss of offsite power with a concurrent Steam Generator tube rupture on the B Steam Generator estimated to be 200 gpm.
One Main Steam Safety Valve on the B header has stuck open.
1 hour following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19 per chemistry sampling procedure RCS T-cold is 355&deg;F PZR pressure is 1170 psia INITIATING CUE #1:
Determine the status of the EAL classification from the given initial conditions EAL Classification      Event number/code
 
ANO-2-JPM-NRC-ADMIN-EAL13                   A5                                 Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Examinees Copy INITIAL CONDITIONS:
A plant trip has occurred due to a loss of offsite power with a concurrent Steam Generator tube rupture on the B Steam Generator estimated to be 200 gpm.
One Main Steam Safety Valve on the B header has stuck open.
1 hour following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19 per chemistry sampling procedure RCS T-cold is 355&deg;F PZR pressure is 1170 psia INITIATING CUE #2:
Determine the status of the fission product boundaries:
Fission product boundary status: Barrier EAL number, code, etc. if (Failed or Intact)                applicable.
Containment RCS Fuel
 
ES-301                                Control Room/In-Plant Systems Outline                        Form ES-301-2 Facility: Arkansas Nuclear One Unit 2                                   Date of Examination: July 2014 Exam Level: RO                   SRO-I           SRO-U X                Operating Test No.: 2014-2 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title                                Type Code*           Safety Function S1. ANO-2-JPM-NRC-AOP2                                                                                    5 022 A4.04 RO-3.1/SRO-3.2                                                        D/EN/S          Containment Reset CIAS and restore cooling water to containment S2. ANO-2-JPM-NRC-AOP5                                                                                    3 027 AA1.01 RO-4.0/SRO-3.9                                                        A/N/S         Pressure Control Respond to a failed close PZR spray valve S3. ANO-2-JPM-NRC-RCP02                                                                                    4 003 A4.08 RO-3.2/SRO-2.9                                                        A/D/S        RCS Heat Removal Restore component cooling water to reactor coolant pumps S4.
S5.
S6.
S7.
S8.
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1. ANO-2-JPM-AACFO                                                                                        6 064 K1.03 RO-3.6/SRO-4.0                                                        A/D/E/L Control AAC diesel fuel oil day tank level manually.                                               Electrical P2. ANO-2-JPM-NRC-FPEM1                                                                                    8 033 A2.03 RO-3.1/SRO-3.5                                                        E/L/P/R         Plant service Perform emergency SW make up to SFP                                                                systems P3.
@           All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                  Criteria for RO / SRO-I / SRO-U (A)lternate path                                                               4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                 9/ 8/ 4 (E)mergency or abnormal in-plant                                                   1/ 1/ 1 (EN)gineered safety feature                                                       - / - / 1 (control room system)
(L)ow-Power / Shutdown                                                             1/ 1/ 1 (N)ew or (M)odified from bank including 1(A)                                       2/ 2/ 1 (P)revious 2 exams                                                                 3 / 3 / 2 (randomly selected)
(R)CA                                                                             1/ 1/ 1 (S)imulator Revision 1
 
ANO-2-JPM-NRC-AOP02                        S1                                  PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT:      2                        REV #:    002                    DATE:
SYSTEM/DUTY AREA:          Containment Cooling Water System TASK:    Reset CIAS and establish cooling water to containment JTA#:    ANO2-RO-EOPAOP-OFFNORM-219 Alternate Path   Yes:           No:       X          Time Critical:     Yes:       No:     X KA VALUE        RO:       3.1      SRO:         3.2      KA


==REFERENCE:==
==REFERENCE:==
022-A4.04 APPROVED FOR ADMINISTRATION TO:              RO:      X    SRO:    X TASK LOCATION:            INSIDE CR:        X      OUTSIDE CR:              BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                          SIMULATOR:          Perform      LAB:
POSITION EVALUATED:          RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:            SIMULATOR:              PLANT SITE:      LAB:
TESTING METHOD:          SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                  15 Minutes REFERENCE(S):        2203.039, Inadvertent CIAS EXAMINEE'S NAME:                                                  BADGE #:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                        UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time              Stop Time              Total Time


022-A4.04APPROVED FOR ADMINISTRATION TO:RO: XSRO: XTASK LOCATION:INSIDE CR:
ANO-2-JPM-NRC-AOP02                           S1                                      PAGE 2 OF 7 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
XOUTSIDE CR:BOTH:SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformLAB:POSITION EVALUATED:RO:SRO:ACTUAL TESTING ENVIRONMENT:SIMULATOR:PLANT SITE:LAB:TESTING METHOD:SIMULATE: PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:15 MinutesREFERENCE(S):2203.039, Inadvertent CIASEXAMINEE'S NAME:BADGE #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:Start TimeStop TimeTotal Time ANO-2-JPM-NRC-AOP02 S1PAGE  2 OF 7JOB PERFORMANCE MEASUREINITIAL CONDITIONS: An inadvertent CIAS has occurred. Steps 1-10 of 2203.039 Inadvertent CIAS AOP have been completed.TASK STANDARD:CIAS has been reset by performing the following: Unlocking the trip path Depressing the CIAS reset pushbutton on 2C-23B Depressing the CIAS reset pushbutton on 2C-40And Containment Chilled water has been realigned to containment by opening the following valves: 2CV-3851-1 2CV-3852-1 2CV-3850-2TASK PERFORMANCE AIDS:OP-2203.039, Inadvertent CIASSIMULATOR SETUP: Inadvertent CIAS present. Containment parameters are below setpoints, Verify CBO to VCT valve, 2CV-4847-2 handswitch is in CLOSE.EXAMINER NOTES:
An inadvertent CIAS has occurred.
Steps 1-10 of 2203.039 Inadvertent CIAS AOP have been completed.
TASK STANDARD:
CIAS has been reset by performing the following:
Unlocking the trip path Depressing the CIAS reset pushbutton on 2C-23B Depressing the CIAS reset pushbutton on 2C-40 And Containment Chilled water has been realigned to containment by opening the following valves:
2CV-3851-1 2CV-3852-1 2CV-3850-2 TASK PERFORMANCE AIDS:
OP-2203.039, Inadvertent CIAS SIMULATOR SETUP:
Inadvertent CIAS present.
Containment parameters are below setpoints, Verify CBO to VCT valve, 2CV-4847-2 handswitch is in CLOSE.
EXAMINER NOTES:
None.
None.
ANO-2-JPM-NRC-AOP02 S1PAGE  3 OF 7JOB PERFORMANCE MEASUREINITIATING CUE:The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.START TIME:PERFORMANCE CHECKLISTSTANDARDS(Circle One)EXAMINER's NOTE:Only one channel of PPS is modeled on simulator completely. Correctly resetting of this channel will resetCIAS trip paths.(C)1.(Step 11.A)Reset actuation trip path byusing key 15 to placeLK/UNLK switch in UNLK.Examinee obtained key 15 fromShift Manager.On panel 2C23B examinee placedkey in trip path key switch to UNLK. N/A  SAT  UNSAT (C)2.(Step 11.B)Depress CIAS pushbutton on 2C23.Examinee depressed CIASpushbutton for trip path. N/A SAT UNSAT 3.(Step 11.C)Place LK/UNLK switch in LKand remove key.Examinee placed trip pathkeyswitch to LK and removed key. N/A  SAT  UNSAT 4.(Step 11.D)Repeat steps as needed toreset remaining trip paths.Examiners Cue:All four PPS trip pathchannels have been reset.Examinee simulated resetting thethree remaining trip paths. N/A  SAT  UNSATEXAMINER's NOTE:Only 2C40 is modeled on simulator completely. 2C39 is not modeled on the simulator. Correctly resetting2C40 will reset CIAS actuation paths.(C)5.(Step 12.A)Depress CIAS Lockout Resetpushbutton on 2C40 andverify Reset light ON.Examinee depressed CIAS LockoutReset pushbutton on 2C40 andverified Reset light ON. N/A  SAT  UNSAT ANO-2-JPM-NRC-AOP02 S1PAGE  4 OF 7JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One) 6.(Step 12.B)Depress CIAS Lockout Resetpushbutton on 2C39 andverify Reset light ON.Examiners Cue:2C39 ESF CIAS actuationhas been reset.Examinee simulated depressingCIAS Lockout Reset pushbutton on2C39 and verified Reset light ON. N/A  SAT  UNSAT 7.(Step 12.C)Go to step 14.Examinee transitioned to step 14. N/A SAT UNSATProcedure Note:Other ESFAS actuations may require resetting before components can be restored.
 
8.(Step 14)Open RCP Bleedoff to VCTvalve, 2CV-4846-1.On panel 2C17, examinee placedhandswitch for RCP bleedoff toVCT valve 2CV-4846-1 to OPEN.Examinee observed RED light ONand GREEN light OFF above handswitch. N/A  SAT  UNSAT 9.(Step 14)Open RCP Bleedoff to VCTvalve, 2CV-4847-2.On panel 2C16, examinee placedhandswitch for RCP bleedoff toVCT valve 2CV-4847-2 to OPEN.Examinee observed RED light ONand GREEN light OFF above handswitch. N/A  SAT  UNSAT (C)10.(Step 15.ABullet 1)Open Chilled water toCNTMT valve 2CV-3851-1.On panel 17, examinee placedhandswitch for Chilled Water toCNTMT Isolation valve2CV-3851-1 to OPEN.Examinee observed RED light ONand GREEN light OFF above handswitch. N/A  SAT  UNSAT (C)11.(Step 15.ABullet 2)Open Chilled water toCNTMT valve 2CV-3852-1.On panel 17, examinee placedhandswitch for Chilled Water toCNTMT Isolation valve2CV-3852-1 to OPEN.Examinee observed RED light ONand GREEN light OFF above handswitch. N/A  SAT  UNSAT ANO-2-JPM-NRC-AOP02 S1PAGE  5 OF 7JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One)(C)12.(Step 15.ABullet 3)Open Chilled water toCNTMT valve 2CV-3850-2.On panel 16, examinee placedhandswitch for Chilled Water toCNTMT Isolation valve2CV-3850-2 to OPEN.Examinee observed RED light ONand GREEN light OFF above handswitch. N/A  SAT  UNSAT 13.(Step 15.B)Verify ONE Main Chiller(2VCH-1A/1B) running.Examiner's note:The red light above handswitch for 2VCH-1Aindicates the chiller isrunning.Examiner's note:The red light for 2HS-3810for 2VCH-1A indicates the2A1 breaker is closed.On panel 2C22, examinee verifiedhandswitch for 2VCH-1A is innormal after start (RED flagged).Examinee observed RED light ONand GREEN light OFF above handswitch for 2VCH-1A.Examinee observed RED light ONand GREEN light OFF above labelfor 2HS-3810.Examinee observed all chilledwater alarms are clear onannunciator 2K13 (Lights slowflashing or clear). N/A  SAT  UNSAT ENDSTOP TIME:
ANO-2-JPM-NRC-AOP02                             S1                                        PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
ANO-2-JPM-NRC-AOP02 S1PAGE  6 OF 7JOB PERFORMANCE MEASUREEXAMINER'S COPYINITIAL CONDITIONS: An Inadvertent CIAS has occurred. Steps 1-10 of 2203.039, Inadvertent CIAS AOP have been completed.INITIATING CUE:The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.
The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.
ANO-2-JPM-NRC-AOP02 S1PAGE  7 OF 7JOB PERFORMANCE MEASUREEXAMINEE'S COPYINITIAL TASK CONDITIONS: An Inadvertent CIAS has occurred. Steps 1-10 of 2203.039, Inadvertent CIAS AOP have been completed.INITIATING CUE:The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.
START TIME:
ANO-2-JPM-NRC-AOP05 S2PAGE  1 OF 7JOB PERFORMANCE MEASUREUNIT: 2 REV#: 000DATE:SYSTEM/DUTY AREA:PZR spray operationTASK:Respond to a failed closed PZR spray valve.JTA#:Alternate Path Yes:
PERFORMANCE CHECKLIST                                  STANDARDS                  (Circle One)
XNo:Time Critical Yes:No: XKA VALUERO:4.0SRO:3.9KA
EXAMINERs NOTE:
Only one channel of PPS is modeled on simulator completely. Correctly resetting of this channel will reset CIAS trip paths.
(C)       1.     Reset actuation trip path by      Examinee obtained key 15 from        N/A SAT UNSAT using key 15 to place            Shift Manager.
(Step 11.A)
LK/UNLK switch in UNLK.           On panel 2C23B examinee placed key in trip path key switch to UNLK.
(C)       2.     Depress CIAS pushbutton on       Examinee depressed CIAS              N/A SAT UNSAT 2C23.                            pushbutton for trip path.
(Step 11.B)
: 3.      Place LK/UNLK switch in LK        Examinee placed trip path            N/A SAT UNSAT and remove key.                   keyswitch to LK and removed key.
(Step 11.C)
: 4.      Repeat steps as needed to        Examinee simulated resetting the      N/A SAT UNSAT reset remaining trip paths.      three remaining trip paths.
(Step 11.D)
Examiners Cue:
All four PPS trip path channels have been reset.
EXAMINERs NOTE:
Only 2C40 is modeled on simulator completely. 2C39 is not modeled on the simulator. Correctly resetting 2C40 will reset CIAS actuation paths.
(C)       5.     Depress CIAS Lockout Reset Examinee depressed CIAS Lockout              N/A SAT UNSAT pushbutton on 2C40 and            Reset pushbutton on 2C40 and (Step 12.A) verify Reset light ON.           verified Reset light ON.
 
ANO-2-JPM-NRC-AOP02                         S1                                        PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                              STANDARDS                    (Circle One)
: 6.       Depress CIAS Lockout Reset    Examinee simulated depressing        N/A SAT UNSAT pushbutton on 2C39 and        CIAS Lockout Reset pushbutton on (Step 12.B) verify Reset light ON.        2C39 and verified Reset light ON.
Examiners Cue:
2C39 ESF CIAS actuation has been reset.
: 7.       Go to step 14.               Examinee transitioned to step 14. N/A SAT UNSAT (Step 12.C)
Procedure Note:
Other ESFAS actuations may require resetting before components can be restored.
: 8.       Open RCP Bleedoff to VCT      On panel 2C17, examinee placed        N/A SAT UNSAT valve, 2CV-4846-1.           handswitch for RCP bleedoff to (Step 14)
VCT valve 2CV-4846-1 to OPEN.
Examinee observed RED light ON and GREEN light OFF above hand switch.
: 9.       Open RCP Bleedoff to VCT      On panel 2C16, examinee placed        N/A SAT UNSAT valve, 2CV-4847-2.           handswitch for RCP bleedoff to (Step 14)
VCT valve 2CV-4847-2 to OPEN.
Examinee observed RED light ON and GREEN light OFF above hand switch.
(C)     10.       Open Chilled water to        On panel 17, examinee placed          N/A SAT UNSAT CNTMT valve 2CV-3851-1.       handswitch for Chilled Water to (Step 15.A CNTMT Isolation valve Bullet 1)                                2CV-3851-1 to OPEN.
Examinee observed RED light ON and GREEN light OFF above hand switch.
(C)     11.       Open Chilled water to        On panel 17, examinee placed          N/A SAT UNSAT CNTMT valve 2CV-3852-1.       handswitch for Chilled Water to (Step 15.A CNTMT Isolation valve Bullet 2)                                2CV-3852-1 to OPEN.
Examinee observed RED light ON and GREEN light OFF above hand switch.
 
ANO-2-JPM-NRC-AOP02                       S1                                  PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                            STANDARDS                (Circle One)
(C)     12. Open Chilled water to      On panel 16, examinee placed      N/A SAT UNSAT CNTMT valve 2CV-3850-2. handswitch for Chilled Water to (Step 15.A CNTMT Isolation valve Bullet 3)                            2CV-3850-2 to OPEN.
Examinee observed RED light ON and GREEN light OFF above hand switch.
: 13. Verify ONE Main Chiller     On panel 2C22, examinee verified  N/A SAT UNSAT (2VCH-1A/1B) running.       handswitch for 2VCH-1A is in (Step 15.B)                            normal after start (RED flagged).
Examiners note:
Examinee observed RED light ON The red light above hand    and GREEN light OFF above hand switch for 2VCH-1A          switch for 2VCH-1A.
indicates the chiller is running.
Examinee observed RED light ON and GREEN light OFF above label Examiners note:            for 2HS-3810.
The red light for 2HS-3810 for 2VCH-1A indicates the  Examinee observed all chilled 2A1 breaker is closed.      water alarms are clear on annunciator 2K13 (Lights slow flashing or clear).
END STOP TIME:
 
ANO-2-JPM-NRC-AOP02                 S1                                PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:
An Inadvertent CIAS has occurred.
Steps 1-10 of 2203.039, Inadvertent CIAS AOP have been completed.
INITIATING CUE:
The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.
 
ANO-2-JPM-NRC-AOP02                 S1                                PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL TASK CONDITIONS:
An Inadvertent CIAS has occurred.
Steps 1-10 of 2203.039, Inadvertent CIAS AOP have been completed.
INITIATING CUE:
The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.
 
ANO-2-JPM-NRC-AOP05                   S2                                  PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT:     2                   REV #:   000                    DATE:
SYSTEM/DUTY AREA:     PZR spray operation TASK:     Respond to a failed closed PZR spray valve.
JTA#:
Alternate Path Yes:       X    No:             Time Critical       Yes:         No: X KA VALUE      RO:       4.0    SRO:     3.9    KA


==REFERENCE:==
==REFERENCE:==
027 AA1.01APPROVED FOR ADMINISTRATION TO: RO:
027 AA1.01 APPROVED FOR ADMINISTRATION TO:       RO:       X      SRO:       X TASK LOCATION:         INSIDE CR:     X      OUTSIDE CR:               BOTH:
XSRO: XTASK LOCATION:INSIDE CR:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
XOUTSIDE CR:BOTH:SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformCLASSROOM:POSITION EVALUATED: RO:SRO:ACTUAL TESTING ENVIRONMENT: SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD: SIMULATE:
PLANT SITE:                     SIMULATOR:     Perform          CLASSROOM:
PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:10 MinutesREFERENCE(S): 2203.028 PZR Systems MalfunctionEXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:StartTime StopTimeTotal Time ANO-2-JPM-NRC-AOP05 S2PAGE  2 OF 7JOB PERFORMANCE MEASUREINITIAL CONDITIONS: Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressure and RCSpressure to rise 2CV-4652 'B' RCP spray valve did not open automaticallyTASK STANDARD:Regen HX to RCP B/C valves closed 2CV-4827-2 2CV-4831-2And Aux spray valve 2CV-4824-2 throttled open to restore RCS pressure 2025 to 2275 psia.TASK PERFORMANCE AIDS:2203.028 PZR System MalfunctionsSIMULATOR SETUP:CV4651, value = 0CV4652, value =0Steam dump emergency off actuated.
POSITION EVALUATED:     RO:                   SRO:
ANO-2-JPM-NRC-AOP05 S2PAGE  3 OF 7JOB PERFORMANCE MEASUREINITIATING CUE:The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.START TIME:PERFORMANCE CHECKLISTSTANDARDS(Circle One)EXAMINER NOTE: Maintain the simulator in Freeze until the applicant is ready to start.
ACTUAL TESTING ENVIRONMENT:       SIMULATOR:             PLANT SITE:       CLASSROOM:
1.(Step 1)Check the following criteria:
TESTING METHOD:     SIMULATE:             PERFORM:
A. IF any PZR spray valvefailed open, THENGO TOStep 2.B. IF any PZR spray valvefailed closed, THEN GO TOStep 4.Determined that the PZR sprayvalve is failed closed andtransitioned to step 4. N/A SAT UNSAT 2.(Step 4.A)IF ANY PZR Spray valve failedclosed, THEN perform thefollowing as needed:Place affected PZR Sprayvalves in MANUAL:2CV-46512CV-4652On panel 2C04, rotatedhandswitch (2HS-4652B) for2CV-4652 to manual. N/A SAT UNSAT (Step 4.B)Throttle PZR Spray valves asnecessary to maintain RCSpressure 2025 psia to 2275psia.On panel 2C04, placedhandswitch for 2CV-4652 to open.Recognized that 2CV-4652 didnot open and pressure iscontinuing to rise. N/A  SAT  UNSAT 3.(Step 4.B.contingency)IF PZR Spray valves will NOTopen, THEN maintain RCSpressure 2025 psia to 2275psia with Aux Spray using2202.010, Attachment 48, RCSPressure Control.Transitioned to 2202.010,Attachment 48, RCS pressurecontrol. N/A  SAT  UNSATProcedure Note:Once method of pressure control is established, this attachment is not required in hand orcontinuous use.A change to the method of pressure control will require in hand or continuous use until the new pressurecontrol method is established.
APPROXIMATE COMPLETION TIME IN MINUTES:           10 Minutes REFERENCE(S):   2203.028 PZR Systems Malfunction EXAMINEE'S NAME:                                             Badge #:
ANO-2-JPM-NRC-AOP05 S2PAGE  4 OF 7JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One) 4.(Step 1.A)*Maintain RCS pressure withheaters and spray using one ormore of the following:IF desired to use PZRPressure controller (2PIC-4626A/B), THEN perform thefollowing:Determined that the PZRpressure controller will notcontrol pressure. N/A  SAT  UNSAT 5.(Step 1.B)IF desired to use PZR Heaters,THEN perform the following:Determined that the PZRheaters will not lower pressure.Examiner note: applicant mayelect to secure heaters but thiswill not maintain pressure in therequired band. N/A  SAT  UNSAT 6.(Step1.C)IF desired to use NORMALSpray, THEN perform thefollowing:Determined that normal spraywill not control pressure. N/A SAT UNSAT 7.(Step1.D.1)IF desired to use AUXILIARYSpray, THEN perform thefollowing:*Verify RCS MTS greater than 30 degrees.Check SPDS or chart recorderand determined that MTS isgreater than 30 degrees. N/A  SAT  UNSAT 8.(Step1.D.2)Verify at least ONE Chargingpump running.Checked at least one chargingpump running by red light on2P-36A, B, or CAlso verified flow on 2FI-4863 orcomputer (not critical) N/A  SAT  UNSAT(C) 9.(Step1.D.3)Close Regen HX to RCP B/Cvalves: 2CV-4827-2 2CV-4831-2On panel 2C09, placedhandswitch for 2CV-4827-2 toclose.On panel 2C09, placedhandswitch for 2CV-4831-2 toclose. N/A  SAT  UNSATProcedure Note:PZR Spray Block valves 2CV-4653 and 2CV-4655 are de-energized due to degraded power supply cables 10.(Step1.D.4)Verify PZR Spray(2CV-4651/2CV-4652) or PZRSpray Isolation valves(2HS-4655/2HS-4653) closed.On panel 2C04, verified 2CV-4651 and 2CV-4652 closed bygreen light on and red light off. N/A  SAT  UNSAT ANO-2-JPM-NRC-AOP05 S2PAGE  5 OF 7JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One)(C) 11.(Step1.D.5)Throttle Aux Spray valve(2CV-4824-2) as necessary.Examiner Cue:If asked CRS will direct aband of 2175 to 2225 psia.On panel 2C09, Throttled 2CV-4824-2 open to restore andcontrol RCS pressure 2025 to2275 psia. N/A  SAT  UNSAT ENDSTOP TIME:
EVALUATOR'S NAME:
ANO-2-JPM-NRC-AOP05 S2PAGE  6 OF 7JOB PERFORMANCE MEASUREEXAMINER's COPYINITIAL CONDITIONS: Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressureand RCS pressure to rise 2CV-4652 'B' RCP spray valve did not open automaticallyINITIATING CUE:The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
ANO-2-JPM-NRC-AOP05 S2PAGE  7 OF 7JOB PERFORMANCE MEASUREEXAMINEE's COPYINITIAL CONDITIONS: Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressureand RCS pressure to rise 2CV-4652 'B' RCP spray valve did not open automaticallyINITIATING CUE:The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.
SATISFACTORY:                   UNSATISFACTORY:
ANO-2-JPM-NRC-RCP02 S3PAGE  1 OF   7JOB PERFORMANCE MEASUREUNIT: 2REV #: 007DATE:SYSTEM/DUTY AREA:Reactor Coolant PumpsTASK:Restore component cooling water to reactor coolant pumpsJTA#:ANO2-RO-EOPAOP-EMERG-32Alternate Path Yes:X No:Time Critical:
PERFORMANCE CHECKLIST COMMENTS:
Yes:No: XKA VALUERO:3.2SRO:2.9KA
Start              Stop                  Total Time Time                Time
 
ANO-2-JPM-NRC-AOP05                         S2                                        PAGE 2 OF 7 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressure and RCS pressure to rise 2CV-4652 B RCP spray valve did not open automatically TASK STANDARD:
Regen HX to RCP B/C valves closed 2CV-4827-2 2CV-4831-2 And Aux spray valve 2CV-4824-2 throttled open to restore RCS pressure 2025 to 2275 psia.
TASK PERFORMANCE AIDS:
2203.028 PZR System Malfunctions SIMULATOR SETUP:
CV4651, value = 0 CV4652, value =0 Steam dump emergency off actuated.
 
ANO-2-JPM-NRC-AOP05                             S2                                          PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.
START TIME:
PERFORMANCE CHECKLIST                              STANDARDS                      (Circle One)
EXAMINER NOTE: Maintain the simulator in Freeze until the applicant is ready to start.
: 1.       Check the following criteria:     Determined that the PZR spray        N/A SAT UNSAT valve is failed closed and (Step 1)    A. IF any PZR spray valve      transitioned to step 4.
failed open, THEN GO TO Step 2.
B. IF any PZR spray valve failed closed, THEN GO TO Step 4.
: 2.      IF ANY PZR Spray valve failed     On panel 2C04, rotated                N/A SAT UNSAT closed, THEN perform the          handswitch (2HS-4652B) for (Step   following as needed:              2CV-4652 to manual.
4.A)
Place affected PZR Spray valves in MANUAL:
* 2CV-4651
* 2CV-4652 (Step  Throttle PZR Spray valves as      On panel 2C04, placed                N/A SAT UNSAT 4.B)     necessary to maintain RCS          handswitch for 2CV-4652 to pressure 2025 psia to 2275        open.
psia.
Recognized that 2CV-4652 did not open and pressure is continuing to rise.
: 3.       IF PZR Spray valves will NOT      Transitioned to 2202.010,            N/A SAT UNSAT open, THEN maintain RCS            Attachment 48, RCS pressure (Step    pressure 2025 psia to 2275        control.
4.B. psia with Aux Spray using continge ncy)    2202.010, Attachment 48, RCS Pressure Control.
Procedure Note:
Once method of pressure control is established, this attachment is not required in hand         or continuous use.
A change to the method of pressure control will require in hand or continuous use until the new pressure control method is established.
 
ANO-2-JPM-NRC-AOP05                       S2                                      PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                              STANDARDS                (Circle One)
: 4.       *Maintain RCS pressure with      Determined that the PZR          N/A SAT UNSAT heaters and spray using one or  pressure controller will not (Step    more of the following:           control pressure.
1.A)
IF desired to use PZR Pressure controller (2PIC-4626A/B), THEN perform the following:
: 5.       IF desired to use PZR Heaters,   Determined that the PZR          N/A SAT UNSAT THEN perform the following:     heaters will not lower pressure.
(Step 1.B)                                      Examiner note: applicant may elect to secure heaters but this will not maintain pressure in the required band.
: 6.       IF desired to use NORMAL        Determined that normal spray      N/A SAT UNSAT Spray, THEN perform the          will not control pressure.
(Step    following:
1.C)
: 7.       IF desired to use AUXILIARY      Check SPDS or chart recorder      N/A SAT UNSAT Spray, THEN perform the          and determined that MTS is (Step    following:                       greater than 30 degrees.
1.D.1)
              *Verify RCS MTS greater than 30 degrees.
: 8.       Verify at least ONE Charging    Checked at least one charging    N/A SAT UNSAT pump running.                    pump running by red light on (Step 1.D.2)                                    2P-36A, B, or C Also verified flow on 2FI-4863 or computer (not critical)
(C) 9.       Close Regen HX to RCP B/C        On panel 2C09, placed            N/A SAT UNSAT valves:                         handswitch for 2CV-4827-2 to (Step        2CV-4827-2 1.D.3)                                    close.
2CV-4831-2 On panel 2C09, placed handswitch for 2CV-4831-2 to close.
Procedure Note:
PZR Spray Block valves 2CV-4653 and 2CV-4655 are de-energized due to degraded power supply cables
: 10.     Verify PZR Spray                 On panel 2C04, verified 2CV-      N/A SAT UNSAT (2CV-4651/2CV-4652) or PZR      4651 and 2CV-4652 closed by (Step    Spray Isolation valves          green light on and red light off.
1.D.4)  (2HS-4655/2HS-4653) closed.
 
ANO-2-JPM-NRC-AOP05                     S2                              PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                      STANDARDS              (Circle One)
(C) 11. Throttle Aux Spray valve     On panel 2C09, Throttled 2CV- N/A SAT UNSAT (2CV-4824-2) as necessary. 4824-2 open to restore and (Step 1.D.5)                              control RCS pressure 2025 to Examiner Cue:                 2275 psia.
If asked CRS will direct a band of 2175 to 2225 psia.
END STOP TIME:
 
ANO-2-JPM-NRC-AOP05                 S2                              PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL CONDITIONS:
Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressure and RCS pressure to rise 2CV-4652 B RCP spray valve did not open automatically INITIATING CUE:
The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.
 
ANO-2-JPM-NRC-AOP05                 S2                              PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL CONDITIONS:
Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressure and RCS pressure to rise 2CV-4652 B RCP spray valve did not open automatically INITIATING CUE:
The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.
 
ANO-2-JPM-NRC-RCP02                       S3                              PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT:     2                      REV #:   007                  DATE:
SYSTEM/DUTY AREA:       Reactor Coolant Pumps TASK:     Restore component cooling water to reactor coolant pumps JTA#:     ANO2-RO-EOPAOP-EMERG-32 Alternate Path   Yes:     X   No:             Time Critical:   Yes:         No:     X KA VALUE      RO:       3.2      SRO:       2.9      KA


==REFERENCE:==
==REFERENCE:==
003 A4.08 APPROVED FOR ADMINISTRATION TO:          RO:      X    SRO:    X TASK LOCATION:          INSIDE CR:      X      OUTSIDE CR:            BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                      SIMULATOR:        Perform    CLASSROOM:
POSITION EVALUATED:        RO:                  SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:          PLANT          CLASSROOM:
SITE:
TESTING METHOD:        SIMULATE:            PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:              15 Minutes REFERENCE(S):      2202.010 Attachment 21 EXAMINEE'S NAME:                                          BADGE# :
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start                Stop                  Total Time Time                  Time
ANO-2-JPM-NRC-RCP02                          S3                                          PAGE 2 OF 7 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:
2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pump has been restored Service water has been aligned to CCW TASK STANDARD:
Controlled bleed off isolated to VCT and CBO relief valve isolated by closing the following valves:
2CV-4846-1 or 2CV-4847-2 and 2CV-4856 TASK PERFORMANCE AIDS:
2202.010 Attachment 21 SIMULATOR SETUP:
Set up CCW valves per EOP 2202.010 Attachment 29 "STARTUP XFM# 2 USAGE" perform actions through step 1.M.6. Close RCP CCW RETURN valve, 2CV-5255-1, 2CV-5254-2 and 2CV-5236-1. NO SIAS actuation and RCP seal temperatures >180.
Set T4 = 2CV 5255 red light. When 2CV 5255-1 is taken to open position, it will trip the breaker T4=DO_HS_5255_R off (override)
T4=DO_HS_5255_G off (override)
T4=CV52551 = 0.0% (component malfunction)
ANO-2-JPM-NRC-RCP02                        S3                                  PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21 starting with step 2.
START TIME:
PERFORMANCE CHECKLIST                            STANDARDS                  (Circle One)
: 1. Align Controlled Bleedoff as    On panel 2C16 verified          N/A SAT UNSAT follows:                        2CV-4847-2 red light on; control (Step                                  switch in OPEN.
2 A)  IF SIAS OR CIAS NOT actuated, THEN verify RCP Bleedoff to    On panel 2C17, verified VCT valves open:                2CV-4846-1 red light on.
* 2CV-4846-1
* 2CV-4847-2
: 2. Verify RCP Bleed-off Relief    On panel 2C09, verified          N/A SAT UNSAT Isolation to Quench Tank open. 2CV-4856 red light on; key-(Step                                  switch in LOCKED OPEN.
2 B)
: 3. IF RCP seal temperatures less  On panel 2C14 or on PMS          N/A SAT UNSAT than 180&deg;F,                    computer determined RCP seal (Step  THEN restore CCW to RCPs        temperatures greater than 1800F
: 3)  by performing the following:
: 4. IF RCP seal temperatures        On panel 2C17, verified          N/A SAT UNSAT 180&deg;F or greater,              2CV-5255-1 closed.
(Step 4 A)  THEN restore CCW to RCPs as follows:                    Observed green light ON; red light OFF above handswitch.
Verify RCP CCW Return valve (2CV-5255-1) CLOSED.
(C)    5. Verify RCP CCW Supply valve    On panel 2C17, placed            N/A SAT UNSAT (2CV-5236-1) open.              handswitch for 2CV-5236-1 in (Step                                  OPEN.
4 B)
Observed green light OFF; red light ON.
ANO-2-JPM-NRC-RCP02                          S3                                      PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                            STANDARDS                      (Circle One)
(C)      6. Verify RCP CCW Return valve    On panel 2C16, Verified              N/A SAT UNSAT (2CV-5254-2) open.              handswitch for 2CV-5254-2 (Step                                  "OPEN".
4 C)
Observed green light OFF; red light ON.
EXAMINERS NOTE:
When 2CV-5255-1 is taken to OPEN, the breaker will trip and cannot be reset. The valve will be bound closed.
(C)      7. Throttle open RCP CCW          On panel 2C17, took handswitch      N/A SAT UNSAT Return valve (2CV-5255-1)      for 2CV-5255-1 to "OPEN" for (Step  with a single 1 second          one (1) second then released.
4 D)  modulation.
Observed red and green lights Examiner Cue:                  OFF.
If WCO sent to the valve report that 2CV-5255-1          EXAMINEE may ask to dispatch indicates closed.              a NLO to the valve and or If asked 2CV-5255-1 cannot      breaker.
be opened.
If AO sent to the breaker, 2B53-G4 report that it is open. If asked the breaker for 2CV-5255-1 cannot be reset.
EXAMINERS NOTE:
The examinee may elect to monitor RCP seal cooldown before making the decision that CCW cannot be restored. This monitoring of RCP seal cooldown may take 10 minutes to validate that 2CV-5255-1 did not open.
The examinee should go to step 5 of Attachment 21.
: 8. IF EITHER of the following      On panel 2C04, observed              N/A SAT UNSAT occur,                          2P32A, B, C, and D RCP (Step                                  handswitches in STOP or PTL.
: 5)        CCW to RCPs can NOT be restored Observed handswitch is green CCW Surge Tank levels      flagged; green light ON and red lower to 13% following    light OFF.
restoration THEN verify ALL RCPs stopped.
ANO-2-JPM-NRC-RCP02                        S3                                PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                            STANDARDS              (Circle One)
: 9. Isolate CCW to RCPs by          On panel 2C16, placed          N/A SAT UNSAT closing the following valves:    handswitch for 2CV-5254-2 to (Step                                  CLOSE 5 A)      Close 2CV-5254-2.
Close 2CV-5236-1.          Observed green light ON; red light OFF.
On panel 2C17, placed handswitch for 2CV-5236-1 to CLOSE Observed green light ON; red light OFF.
(C)    10. Isolate Controlled Bleedoff as  On panel 2C17, placed          N/A SAT UNSAT follows:                        handswitch for 2CV-4846-1 to (Step Verify RCP Bleedoff to VCT      CLOSE.
5 B.1) valves closed:
On panel 2C16, placed handswitch for 2CV-4847-2 to 2CV-4846-1                  CLOSE.
2CV-4847-2 For each valve, observed green Examiner Note: It is critical    light ON; red light OFF.
to close only one valve.
(C)    11. Close RCP bleedoff relief        On panel 2C09, placed          N/A SAT UNSAT isolation to quench tank valve  handswitch for 2CV-4856 to (Step (2CV-4856).                      CLOSE 5
B.2)
Observed green light ON; red light OFF.
END STOP TIME:
ANO-2-JPM-NRC-RCP02                  S3                                PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:
2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pumps have been restored Service water has been aligned to CCW INITIATING CUE:
The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21 starting with step 2.
ANO-2-JPM-NRC-RCP02                  S3                                PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL CONDITIONS:
2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pumps have been restored Service water has been aligned to CCW INITIATING CUE:
The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21 starting with step 2.


003  A4.08APPROVED FOR ADMINISTRATION TO:RO: XSRO: XTASK LOCATION:INSIDE CR:
ANO-2-JPM-NRC-AACFO                      P1                                PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT:       2                     REV #:   002                      DATE:
XOUTSIDE CR:BOTH:SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformCLASSROOM:POSITION EVALUATED:RO:SRO:ACTUAL TESTING ENVIRONMENT:SIMULATOR:PLANTSITE:CLASSROOM:TESTING METHOD:SIMULATE: PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:15 MinutesREFERENCE(S):2202.010 Attachment 21EXAMINEE'S NAME:BADGE# :EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED INTHIS JPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:StartTime StopTimeTotal Time ANO-2-JPM-NRC-RCP02 S3PAGE  2  OF  7JOB PERFORMANCE MEASUREINITIAL CONDITIONS
SYSTEM/DUTY AREA:         Emergency Diesel Generator System TASK:     Control AAC diesel engine fuel oil day tank level manually JTA#:     ANO2-AO-AACDG-OFFNORM-24 Alternate Path Yes:     X    No:               Time Critical:     Yes:         No:       X KA VALUE      RO:       3.1    SRO:         3.5      KA
: 2A1 is re-energized from SU#2 following a degraded power situation2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pump has been restored Service water has been aligned to CCWTASK STANDARD:Controlled bleed off isolated to VCT and CBO relief valve isolated by closing the following valves: 2CV-4846-1 or 2CV-4847-2 and 2CV-4856TASK PERFORMANCE AIDS:2202.010 Attachment 21SIMULATOR SETUP:Set up CCW valves per EOP 2202.010 Attachment 29 "STARTUP XFM# 2 USAGE" perform actions throughstep 1.M.6. Close RCP CCW RETURN valve, 2CV-5255-1, 2CV-5254-2 and2CV-5236-1. NO SIAS actuation and RCP seal temperatures >180.Set T4 = 2CV 5255 red light. When 2CV 5255-1 is taken to open position, it will trip the breakerT4=DO_HS_5255_R off (override)T4=DO_HS_5255_G off (override)T4=CV52551 = 0.0% (component malfunction)
ANO-2-JPM-NRC-RCP02 S3PAGE  3  OF  7JOB PERFORMANCE MEASUREINITIATING CUE:The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21 starting with step 2.START TIME:PERFORMANCE CHECKLISTSTANDARDS(Circle One) 1.(Step 2 A)Align Controlled Bleedoff asfollows:IF SIAS OR CIAS NOTactuated,THEN verify RCP Bleedoff toVCT valves open:2CV-4846-12CV-4847-2On panel 2C16 verified2CV-4847-2 red light on; controlswitch in OPEN.On panel 2C17, verified2CV-4846-1 red light on. N/A  SAT  UNSAT 2.(Step 2 B)Verify RCP Bleed-off ReliefIsolation to Quench Tank open.On panel 2C09, verified2CV-4856 red light on; key-switch in LOCKED OPEN. N/A  SAT  UNSAT 3.(Step 3)IF RCP seal temperatures lessthan 180&deg;F,THEN restore CCW to RCPsby performing the following:On panel 2C14 or on PMScomputer determined RCP sealtemperatures greater than 180 0 F  N/A  SAT  UNSAT 4.(Step 4 A)IF RCP seal temperatures180&deg;F or greater,THEN restore CCW to RCPsas follows:Verify RCP CCW Return valve(2CV-5255-1) CLOSED.On panel 2C17, verified2CV-5255-1 closed.Observed green light ON; redlight OFF above handswitch. N/A  SAT  UNSAT (C)5.(Step 4 B)Verify RCP CCW Supply valve(2CV-5236-1) open.On panel 2C17, placedhandswitch for 2CV-5236-1 in "OPEN".Observed green light OFF; redlight ON. N/A  SAT  UNSAT ANO-2-JPM-NRC-RCP02 S3PAGE  4  OF   7JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One)(C)6.(Step 4 C)Verify RCP CCW Return valve(2CV-5254-2) open.On panel 2C16, Verifiedhandswitch for 2CV-5254-2"OPEN".Observed green light OFF; redlight ON. N/A  SAT  UNSATEXAMINER'S NOTE:When 2CV-5255-1 is taken to OPEN, the breaker will trip and cannot be reset. The valve will be boundclosed.(C)7.(Step 4 D)Throttle open RCP CCWReturn valve (2CV-5255-1)with a single 1 secondmodulation.Examiner Cue:If WCO sent to the valvereport that 2CV-5255-1indicates closed.If asked 2CV-5255-1 cannotbe opened.If AO sent to the breaker,2B53-G4 report that it isopen. If asked the breakerfor 2CV-5255-1 cannot be reset.On panel 2C17, took handswitchfor 2CV-5255-1 to "OPEN" forone (1) second then released.Observed red and green lights OFF.EXAMINEE may ask to dispatcha NLO to the valve and orbreaker. N/A  SAT  UNSATEXAMINER'S NOTE:The examinee may elect to monitor RCP seal cooldown before making the decision that CCW cannot berestored. This monitoring of RCP seal cooldown may take 10 minutes to validate that 2CV-5255-1 did not open.The examinee should go to step 5 of Attachment 21.
8.(Step 5)IF EITHER of the followingoccur, CCW to RCPs can NOTbe restored CCW Surge Tank levelslower to 13% followingrestoration THEN verify ALL RCPsstopped.On panel 2C04, observed2P32A, B, C, and D RCPhandswitches in STOP or PTL.Observed handswitch is greenflagged; green light ON and redlight OFF. N/A  SAT  UNSAT ANO-2-JPM-NRC-RCP02 S3PAGE  5  OF  7JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One) 9.(Step 5 A)Isolate CCW to RCPs byclosing the following valves: Close 2CV-5254-2. Close 2CV-5236-1.On panel 2C16, placedhandswitch for 2CV-5254-2 to"CLOSE"Observed green light ON; redlight OFF.On panel 2C17, placedhandswitch for 2CV-5236-1 to"CLOSE"Observed green light ON; redlight OFF. N/A  SAT  UNSAT (C)10.(Step 5 B.1)Isolate Controlled Bleedoff asfollows:Verify RCP Bleedoff to VCTvalves closed: 2CV-4846-1 2CV-4847-2Examiner Note:  It is criticalto close only one valve.On panel 2C17, placedhandswitch for 2CV-4846-1 to"CLOSE."On panel 2C16, placedhandswitch for 2CV-4847-2 to"CLOSE."For each valve, observed greenlight ON; red light OFF. N/A  SAT  UNSAT (C)11.(Step 5 B.2)Close RCP bleedoff reliefisolation to quench tank valve(2CV-4856).On panel 2C09, placedhandswitch for 2CV-4856 to"CLOSE"Observed green light ON; redlight OFF. N/A  SAT  UNSAT ENDSTOP TIME:
ANO-2-JPM-NRC-RCP02 S3PAGE  6  OF  7JOB PERFORMANCE MEASUREEXAMINER'S COPYINITIAL CONDITIONS: 2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pumps have been restored Service water has been aligned to CCWINITIATING CUE:The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21starting with step 2.
ANO-2-JPM-NRC-RCP02 S3PAGE  7  OF  7JOB PERFORMANCE MEASUREEXAMINEE'S COPYINITIAL CONDITIONS: 2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pumps have been restored Service water has been aligned to CCWINITIATING CUE:The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21starting with step 2.
ANO-2-JPM-NRC-AACFO P1PAGE  1  OF  8JOB PERFORMANCE MEASUREUNIT: 2 REV#: 002DATE:SYSTEM/DUTY AREA:Emergency Diesel Generator SystemTASK:Control AAC diesel engine fuel oil day tank level manuallyJTA#: ANO2-AO-AACDG-OFFNORM-24Alternate Path Yes:
XNo:Time Critical:
Yes:No: XKA VALUERO:3.1SRO:3.5KA


==REFERENCE:==
==REFERENCE:==
064 K1.03APPROVED FOR ADMINISTRATION TO:RO: XSRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:
064 K1.03 APPROVED FOR ADMINISTRATION TO:           RO:     X    SRO:         X TASK LOCATION:           INSIDE CR:             OUTSIDE CR:      X        BOTH:
XBOTH:SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SimulateSIMULATOR:CLASSROOM:POSITION EVALUATED:RO:SRO:ACTUAL TESTING ENVIRONMENT:SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD:SIMULATE: PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:20 MinutesREFERENCE(S):2203.012Z Annunciator 2C435 Corrective ActionEXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:StartTime StopTimeTotal Time ANO-2-JPM-NRC-AACFO P1PAGE  2 OF 8JOB PERFORMANCE MEASUREJPM INITIAL TASK CONDITIONS: The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarmTASK STANDARD:Performed either of the following to restore day tank level:Opened/throttled 2AAC-17 to restore day tank level 40 to 84%, and then closed 2AAC-17.Or, started 2P-235 to restore day tank level to 40% to 84%, and the secured 2P-235.TASK PERFORMANCE AIDS:2203.012Z Annunciator 2C435 Corrective Action SIMULATOR SETUP:N/A ANO-2-JPM-NRC-AACFO P1PAGE  3 OF 8JOB PERFORMANCE MEASUREINITIATING CUE:The SM/CRS directs you to locally identify the cause of the AAC SYSTEM TROUBLE alarm and take correctiveactions.START TIME:PERFORMANCE CHECKLISTSTANDARDS(Circle One)1. Locally identify the cause ofthe AAC System Troublealarm.Examiner Cue:Demonstrate to the applicantthat 2K432-E2 is in alarm.At Panel 2C435, locally checkedannunciator panel to determinecause of alarm to be 2K432-E2,Fuel Oil Day Tank Level Low.
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
N/A  SAT  UNSAT 2.(Step 2.1)Check PLC touchpad and/orFuel Day Tank levelindications: Fuel Oil Day Tanklevel (2LI-7201A) Fuel Oil Day Tanklevel (2LI-7201B) Day Tank Level (L7201)Examiner Cue:The local tank level indicator(2LI-7201B) shows 15%.
PLANT SITE:     Simulate        SIMULATOR:                         CLASSROOM:
OROn panel 2C442, 2LI-7201Ashows 15%.
POSITION EVALUATED:         RO:                   SRO:
OROn the PLC for L7201,observed the fuel oil daytank level shows 15%.On 2LI-7201A at panel 2C442,examinee observed the fuel oilday tank level shows < 20%.
ACTUAL TESTING ENVIRONMENT:           SIMULATOR:             PLANT SITE:       CLASSROOM:
OROn 2LI-7201B in the engineroom, examinee observed thefuel oil day tank level shows< 20%.OROn the Local Computer forL7201, examinee observed thefuel oil day tank level shows< 20%. N/A  SAT  UNSAT 3.(Step 2.2.1)Verify T-25 outlet (FO-37)
TESTING METHOD:         SIMULATE:             PERFORM:
OPEN.Examiner Cue:FO-37, T-25 outlet, is OPEN.Located deck plate for FO-37. N/A  SAT  UNSATEXAMINER'S NOTE:The first path chosen to restore day take level will fail the applicant should then chose the other pathto restore day tank level. If it the first path chosen provide the negative cue, and if it is the secondpath chosen provide the positive cue.
APPROXIMATE COMPLETION TIME IN MINUTES:             20 Minutes REFERENCE(S):       2203.012Z Annunciator 2C435 Corrective Action EXAMINEE'S NAME:                                                 Badge #:
ANO-2-JPM-NRC-AACFO P1PAGE  4 OF 8JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One)(C)4.(Step 2.2.2)If using Fuel Transfer pump(2P-235), then start from eitherof the following: 2HS-7106A on 2C440 2HS-7106B on 2B161-D5Examiner Cue:If asked 2B161-D5 is closedwith green light on, andthere are no problems notedlocally with 2P-235.Negative Examiner Cue:When 2HS-7106A on 2C-440is taken to MANUAL, THENindicate that tank level doesnot increase and 2P-235 fueltransfer pump is notrotating.orWhen 2HS-7106B on 2B116is taken to MANUAL, THENindicate that tank level doesnot increase and 2P-235 fueltransfer pump is notrotating.Positive Examiner Cue:When 2HS-7106A on 2C-440is taken to MANUAL, THENindicate that tank level isrising and indicates 70%
EVALUATOR'S NAME:
orWhen 2HS-7106B on 2B116is taken to MANUAL, THENindicate that tank level isrising and indicates 70%.On 2C-440 rotated 2HS-7106Ato MANUAL.
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
OROn 2B116 rotated 2HS-7106B toMANUAL.This step is critical if it is thesecond path attempted toraise level. N/A  SAT  UNSATTRANSITION NOTE:Go to the AAC diesel generator engine room.
SATISFACTORY:                     UNSATISFACTORY:
ANO-2-JPM-NRC-AACFO P1PAGE  5  OF  8JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One)(C)5.(Step 2.2.3)If using Fuel Oil Header 2T-11Bypass, then open Fuel OilHeader 2T-11 Bypass(2AAC-17).Positive Examiner Cue:When 2AAC-17 is simulatedopening, Then indicate2AAC-17 turns in the CCWdirection and tank level isrising and indicates 70%.Negative Examiner Cue:When 2AAC-17 is simulatedopening, Then indicate that2AAC-17 handwheel isspinning freely and tanklevel does not increase.Turned 2AAC-17 operatinghandle CCW to the full openposition.ORThrottled 2AAC-17 to increaseday tank level.Checked Fuel Oil Day Tank(2T-11) level rising.This step is critical if it is thesecond path attempted toraise level. N/A  SAT  UNSAT (C)6.(Step 2.2.4)When Fuel Day Tank level(2LT-7201) 40 to 84%, THENperform EITHER of thefollowing: Stop Fuel Transferpump (2P-235) fromeither of the following:
PERFORMANCE CHECKLIST COMMENTS:
o 2HS-7106A on 2C440 o 2HS-7106B on2B161-D5 Close Fuel Oil Header2T-11 Bypass(2AAC-17).Examiner Cue:Give either of the followingcues based on method usedto raise tank level.If 2AAC-17 is taken to close,then 2AAC-17 shut seat isfelt and the valve operatinghandle will NOT turn furtherand tank level is stable.
Start                  Stop                  Total Time Time                  Time
OrIf 2P-235 HS is taken to stop,then 2P-235 stops runningwhen the HS is taken tostop.WHEN 2T-11 level is > 40%,examinee rotated 2AAC-17 CWto close. N/A  SAT  UNSAT ANO-2-JPM-NRC-AACFO P1PAGE  6 OF 8JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One) 7.(Step 3.2)Depress Reset PLC touchpad.Examiner Cue:PLC touchpad depressed.Alarm for Low Day TankLevel is clear.At the local computer touchedscreen, depressed the PLCtouchpad or usedacknowledge/reset switch toreset PLC. N/A  SAT  UNSAT ENDSTOP TIME:
 
ANO-2-JPM-NRC-AACFO P1PAGE  7 OF 8JOB PERFORMANCE MEASUREExaminer's CopyINITIAL CONDITIONS: The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarmINITIATING CUE:The SM/CRS directs you to locally identify the cause of the AAC SYSTEMTROUBLE alarm and take corrective actions.
ANO-2-JPM-NRC-AACFO                               P1                                  PAGE 2 OF 8 JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:
ANO-2-JPM-NRC-AACFO P1PAGE  8 OF 8JOB PERFORMANCE MEASUREExaminee's CopyINITIAL CONDITIONS: The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarmINITIATING CUE:The SM/CRS directs you to locally identify the cause of the AAC SYSTEMTROUBLE alarm and take corrective actions.
The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarm TASK STANDARD:
ANO-2-JPM-NRC-FPEM1 P2PAGE  1 OF 8JOB PERFORMANCE MEASUREUNIT: 2 REV#: 013DATE:SYSTEM/DUTY AREA:Spent Fuel Pool Cooling SystemTASK:Perform service water emergency makeup to the SFP (with Loop 1 service water)JTA#: ANO2-WCO-SFP-EMER1Alternate Path Yes:No: XTime Critical:
Performed either of the following to restore day tank level:
Yes:No: XKA VALUERO:3.1SRO:3.5KA
Opened/throttled 2AAC-17 to restore day tank level 40 to 84%, and then closed 2AAC-17.
Or, started 2P-235 to restore day tank level to 40% to 84%, and the secured 2P-235.
TASK PERFORMANCE AIDS:
2203.012Z Annunciator 2C435 Corrective Action SIMULATOR SETUP:
N/A
 
ANO-2-JPM-NRC-AACFO                               P1                                      PAGE 3 OF 8 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs you to locally identify the cause of the AAC SYSTEM TROUBLE alarm and take corrective actions.
START TIME:
PERFORMANCE CHECKLIST                                STANDARDS                  (Circle One)
: 1. Locally identify the cause of      At Panel 2C435, locally checked N/A SAT UNSAT the AAC System Trouble              annunciator panel to determine alarm.                              cause of alarm to be 2K432-E2, Fuel Oil Day Tank Level Low.
Examiner Cue:
Demonstrate to the applicant that 2K432-E2 is in alarm.
: 2. Check PLC touchpad and/or          On 2LI-7201A at panel 2C442,    N/A SAT UNSAT (Step  Fuel Day Tank level                 examinee observed the fuel oil 2.1) indications:                        day tank level shows < 20%.
Fuel Oil Day Tank                          OR level (2LI-7201A)          On 2LI-7201B in the engine Fuel Oil Day Tank          room, examinee observed the level (2LI-7201B)          fuel oil day tank level shows
                                                    < 20%.
Day Tank Level (L7201)                                    OR On the Local Computer for L7201, examinee observed the Examiner Cue:                      fuel oil day tank level shows The local tank level indicator      < 20%.
(2LI-7201B) shows 15%.
OR On panel 2C442, 2LI-7201A shows 15%.
OR On the PLC for L7201, observed the fuel oil day tank level shows 15%.
: 3. Verify T-25 outlet (FO-37)         Located deck plate for FO-37. N/A SAT UNSAT (Step  OPEN.
2.2.1)
Examiner Cue:
FO-37, T-25 outlet, is OPEN.
EXAMINERS NOTE:
The first path chosen to restore day take level will fail the applicant should then chose the other path to restore day tank level. If it the first path chosen provide the negative cue, and if it is the second path chosen provide the positive cue.
 
ANO-2-JPM-NRC-AACFO                             P1                                      PAGE 4 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                              STANDARDS                    (Circle One)
(C)     4. If using Fuel Transfer pump       On 2C-440 rotated 2HS-7106A       N/A SAT UNSAT (Step  (2P-235), then start from either  to MANUAL.
2.2.2) of the following:
OR 2HS-7106A on 2C440          On 2B116 rotated 2HS-7106B to 2HS-7106B on 2B161-D5        MANUAL.
Examiner Cue:                      This step is critical if it is the second path attempted to If asked 2B161-D5 is closed raise level.
with green light on, and there are no problems noted locally with 2P-235.
Negative Examiner Cue:
When 2HS-7106A on 2C-440 is taken to MANUAL, THEN indicate that tank level does not increase and 2P-235 fuel transfer pump is not rotating.
or When 2HS-7106B on 2B116 is taken to MANUAL, THEN indicate that tank level does not increase and 2P-235 fuel transfer pump is not rotating.
Positive Examiner Cue:
When 2HS-7106A on 2C-440 is taken to MANUAL, THEN indicate that tank level is rising and indicates 70%
or When 2HS-7106B on 2B116 is taken to MANUAL, THEN indicate that tank level is rising and indicates 70%.
TRANSITION NOTE:
Go to the AAC diesel generator engine room.
 
ANO-2-JPM-NRC-AACFO                              P1                                      PAGE 5 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                                STANDARDS                  (Circle One)
(C)    5. If using Fuel Oil Header 2T-11     Turned 2AAC-17 operating          N/A SAT UNSAT (Step  Bypass, then open Fuel Oil          handle CCW to the full open 2.2.3) Header 2T-11 Bypass                position.
(2AAC-17).
OR Throttled 2AAC-17 to increase Positive Examiner Cue:              day tank level.
When 2AAC-17 is simulated opening, Then indicate             Checked Fuel Oil Day Tank 2AAC-17 turns in the CCW           (2T-11) level rising.
direction and tank level is rising and indicates 70%.
Negative Examiner Cue:              This step is critical if it is the second path attempted to When 2AAC-17 is simulated          raise level.
opening, Then indicate that 2AAC-17 handwheel is spinning freely and tank level does not increase.
(C)     6. When Fuel Day Tank level           WHEN 2T-11 level is > 40%,        N/A SAT UNSAT (Step  (2LT-7201) 40 to 84%, THEN          examinee rotated 2AAC-17 CW 2.2.4) perform EITHER of the              to close.
following:
Stop Fuel Transfer pump (2P-235) from either of the following:
o   2HS-7106A on 2C440 o   2HS-7106B on 2B161-D5 Close Fuel Oil Header 2T-11 Bypass (2AAC-17).
Examiner Cue:
Give either of the following cues based on method used to raise tank level.
If 2AAC-17 is taken to close, then 2AAC-17 shut seat is felt and the valve operating handle will NOT turn further and tank level is stable.
Or If 2P-235 HS is taken to stop, then 2P-235 stops running when the HS is taken to stop.
 
ANO-2-JPM-NRC-AACFO                       P1                                PAGE 6 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                          STANDARDS              (Circle One)
: 7. Depress Reset PLC touchpad. At the local computer touched N/A SAT UNSAT (Step                               screen, depressed the PLC 3.2)                               touchpad or used Examiner Cue:                 acknowledge/reset switch to reset PLC.
PLC touchpad depressed.
Alarm for Low Day Tank Level is clear.
END STOP TIME:
 
ANO-2-JPM-NRC-AACFO                 P1                          PAGE 7 OF 8 JOB PERFORMANCE MEASURE Examiners Copy INITIAL CONDITIONS:
The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarm INITIATING CUE:
The SM/CRS directs you to locally identify the cause of the AAC SYSTEM TROUBLE alarm and take corrective actions.
 
ANO-2-JPM-NRC-AACFO                 P1                          PAGE 8 OF 8 JOB PERFORMANCE MEASURE Examinees Copy INITIAL CONDITIONS:
The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarm INITIATING CUE:
The SM/CRS directs you to locally identify the cause of the AAC SYSTEM TROUBLE alarm and take corrective actions.
 
ANO-2-JPM-NRC-FPEM1                             P2                            PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT:       2                     REV #:   013                      DATE:
SYSTEM/DUTY AREA:         Spent Fuel Pool Cooling System TASK:     Perform service water emergency makeup to the SFP (with Loop 1 service water)
JTA#:     ANO2-WCO-SFP-EMER1 Alternate Path Yes:           No:       X        Time Critical:     Yes:         No:       X KA VALUE      RO:       3.1      SRO:         3.5      KA


==REFERENCE:==
==REFERENCE:==
033 A2.03APPROVED FOR ADMINISTRATION TO:RO: XSRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:
033 A2.03 APPROVED FOR ADMINISTRATION TO:             RO:     X    SRO:         X TASK LOCATION:           INSIDE CR:             OUTSIDE CR:      X        BOTH:
XBOTH:SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SimulateSIMULATOR:CLASSROOM:POSITION EVALUATED:RO:SRO:ACTUAL TESTING ENVIRONMENT:SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD:SIMULATE: PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:20 MinutesREFERENCE(S):2104.006 Fuel Pool SystemsEXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:StartTime StopTimeTotal Time ANO-2-JPM-NRC-FPEM1 P2PAGE  2 OF 8JOB PERFORMANCE MEASUREJPM INITIAL TASK CONDITIONS:(2K11-K5) "FUEL POOL TEMP HI" is in alarmNeither fuel pool cooling pump is availableAn operator is stationed at the spent fuel pool to monitor spent fuel pool levelFuel pool level is low2P66 is aligned to the RWT and runningYou are the on watch WCO operatorExaminer Note: Approved protected train paperwork will be provided to the examiner to allow entrypast protected equipment postings for completion of this JPM.TASK STANDARD:Aligned Emergency SFP makeup from Loop 1 service water has been commenced by verifying RWTrecirc valves are closed, Fuel Pool makeup valves open (2FP-31, 2FP-46, 2SW-57), Service water drainvalve closed 2SW-8401, and 2SW-138 throttled open to raise SFP level.TASK PERFORMANCE AIDS:2104.006 Fuel Pool Systems Section 14.3.Do not use a cloth lanyard in a Radiologically controlled area.
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SIMULATOR SETUP:N/A ANO-2-JPM-NRC-FPEM1 P2PAGE  3 OF 8JOB PERFORMANCE MEASUREThe CRS directs you to Align Loop 1 service water to provide emergency makeup to the spent fuel pool startingon step 14.3 of 2104.006 Fuel Pool Systems.START TIME:PERFORMANCE CHECKLISTSTANDARDS(Circle One)Examiner Note:Ladders in the aux building are controlled by both Operations and RP. Operations dept. has keys to theladders but if access is needed greater than 8' RP must be contacted.
PLANT SITE:     Simulate          SIMULATOR:                         CLASSROOM:
1.(Step 14.3.1)IF SFP or RWT aligned forPurification, THEN secure FuelPool Purification pump 2P-66(2HS-5411) to prevent rapiddepletion of Fuel Pool DI (2T-5)or addition of Service Water tothe RWT.Examiner Cue:After the pump is simulated tobe stopped Report Green lightON, red light OFF.Locally rotated 2P66 handswitch(2HS-5411) to STOP andreleased.Observed green light ON, red light OFF. N/A  SAT  UNSATTRANSITION NOTE:Go to elevation 354' RAB, just north of the elevator, to the SFP valve gallery.
POSITION EVALUATED:         RO:                     SRO:
2.(Step 14.3.2)Verify the following valvesclosed:Borated MU or RWT to 2P-66(2FP-32)Examiner Cue:2FP-32 stem is fully insertedand resistance is felt.Closed 2FP-32 by turninghandwheel clockwise andobserving valve stem insertionuntil resistance felt.
ACTUAL TESTING ENVIRONMENT:           SIMULATOR:             PLANT SITE:       CLASSROOM:
N/A  SAT  UNSATTRANSITION NOTE:Go to elevation 335' RAB just off elevator 3.(Step 14.3.2)Verify the following valvesclosed:RWT Recirculation Isolation(2CV-5637-1).Examiner Cue:Control room reports 2CV-5637-1 indicates closed.Or locally at the valve, thestem fully down/inserted.Contacted Control Room to close2CV-5637-1. N/A  SAT  UNSAT ANO-2-JPM-NRC-FPEM1 P2PAGE  4 OF 8JOB PERFORMANCE MEASURE 4.(Step 14.3.2)Verify the following valvesclosed:RWT Recirculation Isolation(2CV-5638-2) closed.Examiner Cue:Control room reports 2CV-5638-2 indicates closed.Or locally at the valve, thestem fully down/inserted.Contacted Control Room to close2CV-5638-2. N/A  SAT  UNSATTRANSITION NOTE:Go to elevation 354' RAB, just north of the elevator, to the SFP valve gallery. (C)5.(Step 14.3.3)Open Borated MU, RWT, SW toFuel Pool (2FP-31).Examiner Cue:2FP-31 stem is fully extended.Opened 2FP-31 by turninghandwheel CCW.Observed valve stem fullywithdrawn out of the valve. N/A  SAT  UNSAT (C)6.(Step 14.3.4)Open RWT to Fuel Pool Isolation(2FP-46).Examiner Cue:2FP-46 stem is fully extended.Opened 2FP-46 by turninghandwheel CCW.Observed valve stem fullywithdrawn out of the valve. N/A  SAT  UNSATTRANSITION NOTE:Go to elevation 335' RAB just off elevator.(C)7.(Step 14.3.5)Close SW Header 1 TelltaleDrain (2SW-8401).Examiner Cue:2SW-8401 has stem insertedinto handwheel and resistanceis felt.Closed 2SW-8401 by turninghandwheel CW.Observed valve stem fullyinserted into the valve. N/A SAT UNSAT 8.(Step 14.3.6.A)Record unlocking of SW Hdr 1Emerg Feed Isol (2SW-57)in Cat E log.Examiner Cue:2SW-57 has been recorded inthe Cat E log.Contacted the Control Room torecord 2SW-57 in the Cat E log. N/A SAT UNSAT ANO-2-JPM-NRC-FPEM1 P2PAGE 5  OF  8JOB PERFORMANCE MEASURE (C)9.(Step 14.3.6.B)Unlock andopen SW Header 1Emergency Feed Isolation (2SW-57).Examiner Cue:2SW-57 is unlocked and valvestem is fully extended.Unlocked locking device on2SW-57 using category "E" valve key.Opened 2SW-57 by turninghandwheel CCW.Observed valve stem fullywithdrawn out of the valve. N/A SAT  UNSAT ANO-2-JPM-NRC-FPEM1 P2PAGE  6 OF  8JOB PERFORMANCE MEASUREProcedure Caution: If SFP overfilled, water can spill through SFP Cooling/SFP Purification pipe chase (SFP, ~ 402', SW corner)and contaminate SFP valve gallery (AB 354') and hall near 2F-3A/B (AB 335') If flow introduced with level > 401' 7", some overflow can occur due to wave motion of water.Procedure Note:If CLP (2LI-5400) used as SFP level indication during SFP drain and fill evolutions, SFP and CLP levels willdiffer slightly until water levels equalize through seal area.
TESTING METHOD:         SIMULATE:             PERFORM:
10.(Step 14.3.7.A)IF two Operators available,THEN establish and maintain thefollowing:Operator stationed at SFP tocontinuously monitor level:SFP (2LI-5401)CLP (2LI-5400) if gate removedor deflatedExaminer Cue:Operator is stationed at SFP tomonitor level responds toradio communications.Verified that an Operator wasstationed to monitor SFP level  N/A SAT UNSAT 11.(Step 14.3.7.B)Operator stationed at SFP SWHdr 1 Emerg Feed Isol toSF Pool (2SW-138) for valveadjustment.Examinee positions self at 2SW-138. N/A  SAT  UNSAT 12.(Step 14.3.7.C)Communications betweenstationed Operators.Examiner Cue:Operator that stationed at SFPto monitor level responds toradio communications.Examinee establishescommunication with Operatorstationed at the Spent Fuel Pool  N/A SAT UNSAT 13.(Step 14.3.7.D)*IF level being maintainedwithout frequent valveadjustment,THEN the following may beperformed:Secure Operator at 2SW-138.Reassign remaining Operator tocontinuously monitor SFP levelEXCEPT when 2SW-138adjustment needed.Examiner Cue:Operator at SFP will monitor iflevel can be maintainedwithout frequent adjustmentsExaminee assesses level beingmaintained. N/A SAT UNSATEXAMINERS NOTE:
APPROXIMATE COMPLETION TIME IN MINUTES:               20 Minutes REFERENCE(S):       2104.006 Fuel Pool Systems EXAMINEE'S NAME:                                                 Badge #:
-Final valve position is at discretion of examinee to ensure level is raised/maintained.
EVALUATOR'S NAME:
ANO-2-JPM-NRC-FPEM1 P2PAGE  7  OF  8JOB PERFORMANCE MEASURE 14.(Step 14.3.8)IF two Operators NOT available,THEN perform the following:Obtain SM/CRS concurrence.Station one Operator to align forfill and continuously monitor levelEXCEPT when adjusting valve.Determined that two operators areavailable from initial conditions. N/A  SAT  UNSAT (C)15.(Step 14.3.9)Throttle open SW Header 1Emergency Feed Isolation to SFPool (2SW-138) between 401'4"and 401'7".Examiner Cue:Operator stationed at SFPreports level rising slowly.Throttled open 2SW-138 byturning handwheel CCW.Observed valve stem withdrawnout of the valve commensuratewith valves throttling. N/A SAT  UNSAT ENDSTOP TIME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
ANO-2-JPM-NRC-FPEM1 P2PAGE  8 OF  8JOB PERFORMANCE MEASUREExaminer's CopyExaminer Note:  Approved protected train paperwork will beprovided to the examiner to allow entry past protected equipmentpostings for completion of this JPM.INITIAL CONDITIONS: (2K11-K5) "FUEL POOL TEMP HI" is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool levelFuel pool level is low2P66 is aligned to the RWT and running You are the on watch WCO operatorINITIATING CUE:The CRS directs you to align Loop 1 service water to provide emergency makeup to the spentfuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.
SATISFACTORY:                     UNSATISFACTORY:
ANO-2-JPM-NRC-FPEM1 P2PAGE  9 OF 8JOB PERFORMANCE MEASUREExaminee's CopyINITIAL CONDITIONS: (2K11-K5) "FUEL POOL TEMP HI" is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool levelFuel pool level is low2P66 is aligned to the RWT and running You are the on watch WCO operatorINITIATING CUE:The CRS directs you to align Loop 1 service water to provide emergency makeup to the spentfuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.}}
PERFORMANCE CHECKLIST COMMENTS:
Start                  Stop                  Total Time Time                  Time
 
ANO-2-JPM-NRC-FPEM1                               P2                                PAGE 2 OF 8 JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:
(2K11-K5) FUEL POOL TEMP HI is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool level Fuel pool level is low 2P66 is aligned to the RWT and running You are the on watch WCO operator Examiner Note: Approved protected train paperwork will be provided to the examiner to allow entry past protected equipment postings for completion of this JPM.
TASK STANDARD:
Aligned Emergency SFP makeup from Loop 1 service water has been commenced by verifying RWT recirc valves are closed, Fuel Pool makeup valves open (2FP-31, 2FP-46, 2SW-57), Service water drain valve closed 2SW-8401, and 2SW-138 throttled open to raise SFP level.
TASK PERFORMANCE AIDS:
2104.006 Fuel Pool Systems Section 14.3.
Do not use a cloth lanyard in a Radiologically controlled area.
SIMULATOR SETUP:
N/A
 
ANO-2-JPM-NRC-FPEM1                                   P2                                  PAGE 3 OF 8 JOB PERFORMANCE MEASURE The CRS directs you to Align Loop 1 service water to provide emergency makeup to the spent fuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.
START TIME:
PERFORMANCE CHECKLIST                                  STANDARDS                    (Circle One)
Examiner Note:
Ladders in the aux building are controlled by both Operations and RP. Operations dept. has keys to the ladders but if access is needed greater than 8 RP must be contacted.
: 1. IF SFP or RWT aligned for          Locally rotated 2P66 handswitch    N/A SAT UNSAT (Step  Purification, THEN secure Fuel      (2HS-5411) to STOP and 14.3.1)  Pool Purification pump 2P-66        released.
(2HS-5411) to prevent rapid depletion of Fuel Pool DI (2T-5) or addition of Service Water to    Observed green light ON, red light the RWT.                           OFF.
Examiner Cue:
After the pump is simulated to be stopped Report Green light ON, red light OFF.
TRANSITION NOTE:
Go to elevation 354 RAB, just north of the elevator, to the SFP valve gallery.
: 2. Verify the following valves        Closed 2FP-32 by turning          N/A SAT UNSAT (Step   closed:                            handwheel clockwise and 14.3.2)                                     observing valve stem insertion Borated MU or RWT to 2P-66 until resistance felt.
(2FP-32)
Examiner Cue:
2FP-32 stem is fully inserted and resistance is felt.
TRANSITION NOTE:
Go to elevation 335' RAB just off elevator
: 3. Verify the following valves        Contacted Control Room to close    N/A SAT UNSAT (Step   closed:                            2CV-5637-1.
14.3.2) RWT Recirculation Isolation (2CV-5637-1).
Examiner Cue:
Control room reports 2CV-5637-1 indicates closed.
Or locally at the valve, the stem fully down/inserted.
 
ANO-2-JPM-NRC-FPEM1                               P2                                PAGE 4 OF 8 JOB PERFORMANCE MEASURE
: 4. Verify the following valves          Contacted Control Room to close    N/A SAT UNSAT (Step closed:                              2CV-5638-2.
14.3.2) RWT Recirculation Isolation (2CV-5638-2) closed.
Examiner Cue:
Control room reports 2CV-5638-2 indicates closed.
Or locally at the valve, the stem fully down/inserted.
TRANSITION NOTE:
Go to elevation 354 RAB, just north of the elevator, to the SFP valve gallery.
(C)     5. Open Borated MU, RWT, SW to          Opened 2FP-31 by turning          N/A SAT UNSAT (Step  Fuel Pool (2FP-31).                 handwheel CCW.
14.3.3)
Examiner Cue:                       Observed valve stem fully withdrawn out of the valve.
2FP-31 stem is fully extended.
(C)    6. Open RWT to Fuel Pool Isolation      Opened 2FP-46 by turning          N/A SAT UNSAT (Step (2FP-46).                           handwheel CCW.
14.3.4)
Examiner Cue:                       Observed valve stem fully withdrawn out of the valve.
2FP-46 stem is fully extended.
TRANSITION NOTE:
Go to elevation 335' RAB just off elevator.
(C)     7. Close SW Header 1 Telltale          Closed 2SW-8401 by turning        N/A SAT UNSAT (Step Drain (2SW-8401).                    handwheel CW.
14.3.5)
Examiner Cue:                        Observed valve stem fully inserted into the valve.
2SW-8401 has stem inserted into handwheel and resistance is felt.
: 8. Record unlocking of SW Hdr 1        Contacted the Control Room to      N/A SAT UNSAT (Step Emerg Feed Isol (2SW-57)             record 2SW-57 in the Cat E log.
14.3.6. in Cat E log.
A)
Examiner Cue:
2SW-57 has been recorded in the Cat E log.
 
ANO-2-JPM-NRC-FPEM1                          P2                              PAGE 5 OF 8 JOB PERFORMANCE MEASURE (C)    9. Unlock and open SW Header 1    Unlocked locking device on      N/A SAT UNSAT (Step Emergency Feed Isolation (2SW- 2SW-57 using category "E" valve 14.3.6. 57).                          key.
B)
Opened 2SW-57 by turning handwheel CCW.
Examiner Cue:
Observed valve stem fully 2SW-57 is unlocked and valve withdrawn out of the valve.
stem is fully extended.
 
ANO-2-JPM-NRC-FPEM1                                    P2                                  PAGE 6 OF 8 JOB PERFORMANCE MEASURE Procedure Caution:
If SFP overfilled, water can spill through SFP Cooling/SFP Purification pipe chase (SFP, ~ 402', SW corner) and contaminate SFP valve gallery (AB 354') and hall near 2F-3A/B (AB 335')
If flow introduced with level > 401' 7", some overflow can occur due to wave motion of water.
Procedure Note:
If CLP (2LI-5400) used as SFP level indication during SFP drain and fill evolutions, SFP and CLP levels will differ slightly until water levels equalize through seal area.
: 10. IF two Operators available,        Verified that an Operator was        N/A SAT UNSAT (Step   THEN establish and maintain the stationed to monitor SFP level 14.3.7. following:
A)
Operator stationed at SFP to continuously monitor level:
SFP (2LI-5401)
CLP (2LI-5400) if gate removed or deflated Examiner Cue:
Operator is stationed at SFP to monitor level responds to radio communications.
: 11. Operator stationed at SFP SW        Examinee positions self at 2SW-      N/A SAT UNSAT (Step   Hdr 1 Emerg Feed Isol to            138.
14.3.7. SF Pool (2SW-138) for valve B)    adjustment.
: 12. Communications between              Examinee establishes                N/A SAT UNSAT (Step    stationed Operators.                communication with Operator 14.3.7.                                      stationed at the Spent Fuel Pool Examiner Cue:
C)
Operator that stationed at SFP to monitor level responds to radio communications.
: 13.    *IF level being maintained          Examinee assesses level being        N/A SAT UNSAT (Step   without frequent valve              maintained.
14.3.7. adjustment, D)     THEN the following may be performed:
Secure Operator at 2SW-138.
Reassign remaining Operator to continuously monitor SFP level EXCEPT when 2SW-138 adjustment needed.
Examiner Cue:
Operator at SFP will monitor if level can be maintained without frequent adjustments EXAMINERS NOTE:
          - Final valve position is at discretion of examinee to ensure level is raised/maintained.
 
ANO-2-JPM-NRC-FPEM1                                P2                                PAGE 7 OF 8 JOB PERFORMANCE MEASURE
: 14. IF two Operators NOT available,    Determined that two operators are  N/A SAT UNSAT (Step THEN perform the following:         available from initial conditions.
14.3.8) Obtain SM/CRS concurrence.
Station one Operator to align for fill and continuously monitor level EXCEPT when adjusting valve.
(C)    15. Throttle open SW Header 1          Throttled open 2SW-138 by          N/A SAT UNSAT (Step  Emergency Feed Isolation to SF      turning handwheel CCW.
14.3.9) Pool (2SW-138) between 401'4" and 401'7".
Observed valve stem withdrawn out of the valve commensurate Examiner Cue:                      with valves throttling.
Operator stationed at SFP reports level rising slowly.
END STOP TIME:
 
ANO-2-JPM-NRC-FPEM1                            P2                                PAGE 8 OF 8 JOB PERFORMANCE MEASURE Examiners Copy Examiner Note: Approved protected train paperwork will be provided to the examiner to allow entry past protected equipment postings for completion of this JPM.
INITIAL CONDITIONS:
(2K11-K5) FUEL POOL TEMP HI is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool level Fuel pool level is low 2P66 is aligned to the RWT and running You are the on watch WCO operator INITIATING CUE:
The CRS directs you to align Loop 1 service water to provide emergency makeup to the spent fuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.
 
ANO-2-JPM-NRC-FPEM1                           P2                                PAGE 9 OF 8 JOB PERFORMANCE MEASURE Examinees Copy INITIAL CONDITIONS:
(2K11-K5) FUEL POOL TEMP HI is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool level Fuel pool level is low 2P66 is aligned to the RWT and running You are the on watch WCO operator INITIATING CUE:
The CRS directs you to align Loop 1 service water to provide emergency makeup to the spent fuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.}}

Latest revision as of 18:08, 5 February 2020

2014-07 Final Licensing Operating Test
ML14237A175
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/31/2014
From: Vincent Gaddy
NRC Region 4
To:
Entergy Operations
laura hurley
References
50-368/14-07 50-368/OL-14
Download: ML14237A175 (68)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Arkansas Nuclear One Unit 2 Date of Examination: July 2014 Examination Level: RO SRO X Operating Test Number: 2014-2 Administrative Topic Type Describe activity to be performed (see Note) Code*

Determine if COLR DNBR limit is being met during a loss of COLSS and what action is required.

A1. Conduct of Operations D/R ANO-2-JPM-NRC-ADMIN-DNBRL 2.1.25 SRO (4.2)

Apply Steam Generator Chemistry limits A2. Conduct of Operations N/R ANO-2-JPM-NRC-ADMIN-SGCHEM 2.1.34 SRO (3.5)

Apply Tech Specs.

A3. Equipment Control D/R ANO-2-JPM-NRC-ADMIN-EDGTS 2.2.37 SRO (4.6)

Administration of Potassium Iodide.

A4. Radiation Control M/R ANO-2-JPM-NRC-ADMIN-KI2 2.3.14 SRO (3.8)

Determine Emergency Action Level A5. Emergency M/R ANO-2-JPM-NRC-ADMIN- EAL13 Procedures/Plan 2.4.41 SRO (4.6)

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

Revision 0

ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 1 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:

SYSTEM/DUTY AREA: Conduct of Operations TASK: Determine if COLR DNBR limit is being met during a loss of COLSS.

JTA#: ANO-2-SRO-EOPAOP-OFFNORM-233 KA VALUE RO: 3.9 SRO: 4.2 KA

REFERENCE:

2.1.25 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform CLASSROOM: Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): Unit 2 Tech Specs and Unit 2 COLR EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time

ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 2 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:

The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out of service for maintenance COLSS has been declared inoperable due to failed power supplies The CPC average DNBR is 2.35 The CPC average ASI is -0.0001 The CPC average LPD is 12.9 KW/FT

  1. 1 CEAC is inoperable for Surveillance testing
  1. 2 CEAC is operable TASK STANDARD: Determine that Technical Specifications LCO 3.2.4 action b is applicable.

TASK PERFORMANCE AIDS: Unit 2 Tech Specs and Unit 2 COLR

ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 3 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.

START TIME:

PERFORMANCE CHECKLIST STANDARD (Circle One)

N/A SAT UNSAT

1. Using Tech Spec 3.2.4 Examinee correctly derived determines that the COLR from Tech Spec 3.2.4 that must be referenced to since COLSS is inoperable, determine if TS are satisfied. the COLR graph must be referenced to determine if Tech Spec 3.2.4 is met.

N/A SAT UNSAT (C) 2. Using COLR figure Examinee correctly derived determines DNBR is not in from graph based on given the acceptable region for values that DNBR is not in the operation and that Tech Spec acceptable region of operation LCO 3.2.4.c should be and determined that LCO entered. 3.2.4.c is applicable for the current condition.

(C) 3. Using Tech 3.2.4 determine Examinee correctly N/A SAT UNSAT that DNBR must meet the determines the DNBR must be requirements of T.S 3.2.4 restored to meet the action b requirements of the COLR graph within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to comply with Tech Spec 3.2.4 action b.

EXAMINER's NOTE: Examinee may discuss the Tech Spec applicability at this point stating that Tech Spec 3.2.4 LCO requires power to be lowered so that DNBR is restored to the acceptable region within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

END STOP TIME:

ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 4 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out of service for maintenance COLSS has been declared inoperable due to failed power supplies The CPC average DNBR is 2.35 The CPC average ASI is -0.0001 The CPC average LPD is 12.9 KW/FT

  1. 1 CEAC is inoperable for Surveillance testing
  1. 2 CEAC is operable INITIATING CUE:

Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.

T.S. LCO 3.2.4.c Applicable Tech Spec LCOs (if any) _________________________

T.S. 3.2.4. Action b Actions required to comply with Tech Specs (if any) ______________________________

Tech Spec 3.2.4 LCO Action b requires power to be lowered so that DNBR is restored to the acceptable region within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 5 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out of service for maintenance COLSS has been declared inoperable due to failed power supplies.

The CPC average DNBR is 2.35 The CPC average ASI is -0.0001 The CPC average LPD is 12.9 KW/FT

  1. 1 CEAC is inoperable for Surveillance testing
  1. 2 CEAC is operable INITIATING CUE:

Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.

Applicable Tech Spec LCOs (if any) _________________________

Actions required to comply with Tech Specs (if any) ______________________________

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:

SYSTEM/DUTY AREA: Conduct of Operations TASK: Apply Steam Generator Chemistry limits.

JTA#: ANO-2-SRO-ADMIN-OFFNORM-2 KA VALUE RO: 2.7 SRO: 3.5 KA

REFERENCE:

2.1.34 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform CLASSROOM: Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 30 Minutes REFERENCE(S): 1000.043 Steam Generator water Chemistry Monitoring Unit 2 EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:

The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation.

The previous shift raised power from 20% to 80%.

All normal chemistry sampling equipment is in service.

Chemistry reports the following sample results:

Steam Generator Blowdown:

Cation conductivity: 0.5 µmho/cm Sodium: 3 ppb Chloride: 15 ppb Sulfate: 12 ppb Main Feedwater:

Dissolved O2: 12 ppb Total Iron: 3 ppb Total Copper: 0.1 ppb Hydrazine: 130 ppb ETA: 4.2 ppm Condensate:

Dissolved O2: 15 ppb TASK STANDARD:

Determined that Attachment 3 of 1000.043 is applicable for operation >50% power.

Determined that Chloride and Sulfate within acceptable values due to 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowance of exceeding 50% power.

Determined that Feedwater Dissolved O2 is above action level 2.

Determined that plant power should be reduced to <50% within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of initiation of action level 2 and return Feedwater Dissolved O2 below action level 1 value within 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> or go to action level 3.

Determined that the following action should be initiated:

Check residual hydrazine; if below normal, increase feed rate.

Institute air inleakage location efforts.

Test other available locations in Feedwater train for dissolved oxygen ingress.

TASK PERFORMANCE AIDS: 1000.043 Steam Generator Water Chemistry monitoring Unit 2

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Determine if Action Levels are applicable (list your basis) and any Action Level requirements and Corrective Action requirements based on current plant Steam Generator and Secondary Water Chemistry.

START TIME:

PERFORMANCE CHECKLIST STANDARD (Circle One)

1. Review 1000.043, Steam Determined that 1000.043, Generator Water Chemistry Steam Generator Water N/A SAT UNSAT Monitoring Unit 2. Chemistry Monitoring Unit 2 should be reviewed for applicability.
2. Determine which attachment Determined that 1000.043 (C) should be used based on current attachment 3 should be used N/A SAT UNSAT plant conditions. to compare value versus limit.
3. Review provided values to Determined that Chloride and (C) attachment 3 of 1000.043 for Sulfate are NOT above the N/A SAT UNSAT Steam Generator Blowdown action level 1 value due to samples. note J of attachment 3.
4. Review provided values to Determined that Dissolved O2 (C) attachment 3 of 1000.043 for is above the action level 2 N/A SAT UNSAT Main Feedwater samples. value.
5. Review provided values to Determined that Condensate attachment 3 of 1000.043 for Dissolved O2 is not used as a N/A SAT UNSAT Condensate samples. control parameter due to note G

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

6. Review action level 2 for Determined action level 2 (C) requirements. requirements as follows: N/A SAT UNSAT Reduce power to <50% within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of initiation of action level 2. (Critical portion of step)

Consider performing hot soak.

(Not critical)

Return Feedwater Dissolved O2 below action level 1 value within 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> or go to action level 3. (Critical portion of step)

Perform technical review assessing the abnormal water chemistry condition. (Not critical)

7. Review 1000.043, Attachment 6 Determined the following (C) to determine action required actions: N/A SAT UNSAT based on plant conditions.

Check residual hydrazine; if below normal, increase feed rate.

Institute air inleakage location efforts.

Test other available locations in Feedwater train for dissolved oxygen ingress.

END STOP TIME:

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:

The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation.

The previous shift raised power from 20% to 80%.

All normal chemistry sampling equipment is in service.

Chemistry reports the following sample results:

Steam Generator Blowdown:

Cation conductivity: 0.5 µmho/cm Sodium: 3 ppb Chloride: 15 ppb Sulfate: 12 ppb Main Feedwater:

Dissolved O2: 12 ppb Total Iron: 3 ppb Total Copper: 0.1 ppb Hydrazine: 130 ppb ETA: 4.2 ppm Condensate:

Dissolved O2: 15 ppb INITIATING CUE:

Determine if Action Levels are applicable (list your basis) and any Action Level requirements and Corrective Action requirements based on current plant Steam Generator and Secondary Water Chemistry.

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL CONDITIONS:

The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation.

The previous shift raised power from 20% to 80%.

All normal chemistry sampling equipment is in service.

Chemistry reports the following sample results:

Steam Generator Blowdown:

Cation conductivity: 0.5 µmho/cm Sodium: 3 ppb Chloride: 15 ppb Sulfate: 12 ppb Main Feedwater:

Dissolved O2: 12 ppb Total Iron: 3 ppb Total Copper: 0.1 ppb Hydrazine: 130 ppb ETA: 4.2 ppm Condensate:

Dissolved O2: 15 ppb INITIATING CUE:

Determine if Action Levels are applicable (list your basis) and any Action Level requirements and Corrective Action requirements based on current plant Steam Generator and Secondary Water Chemistry.

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 1 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE 2 REV #: 2 DATE:

SYSTEM/DUTY AREA: Equipment controls TASK: Determine EDG and PZR TS applicability and any required actions.

JTA#: ANO-SRO-ADMIN-NORM-103 KA VALUE RO: 3.6 SRO: 4.6 KA

REFERENCE:

2.2.37 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform CLASSROOM: Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): 2203.012-H, Annunciator 2K08 Corrective Actions, 2203.012-U, Annunciator 2E12 Corrective Action, Unit 2 Tech Specs.

EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 2 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 Fuel x-fer pump inoperable, there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.

TASK STANDARD:

Determined the current applicable Tech Specs:

T.S. 3.8.1.1.b T.S. 3.4.4 Determined the most restrictive Required Action:

3.8.1.1 Action b.1 Demonstrate the OPERABILITY of both the A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter TASK PERFORMANCE AIDS:

2203.012-H, Annunciator 2K08 Corrective Actions, 2203.012-U, Annunciator 2E12 Corrective Action, Unit 2 Tech Specs.

SIMULATOR SETUP N/A EXAMINER NOTES:

None.

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 3 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 Fuel x-fer pump inoperable, there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.

Determine ALL current applicable Unit 2 Tech Specs associated with this condition AND Identify the most restrictive Required Action.

START TIME:

PERFORMANCE CHECKLIST STANDARD (Circle One)

1. Review Annunciator corrective action Referenced 2K-08 and 2E-12 N/A SAT UNSAT for applicability Annunciator corrective actions determined need to review Tech Specs
2. Review 3.8.1.1 Tech Spec for Examinee reviewed T.S. 3.8.1.1.b N/A SAT UNSAT (C) applicability and determined that the #1 EDG is inoperable and determines action b is applicable.

Review for additional Tech Specs. Using Tech Specs or 2104.036 EDG N/A SAT UNSAT procedure, determined that Tech 3.4.4 should also be reviewed.

3. Review 3.4.4 Tech Spec for applicability Examinee reviewed T.S. 3.4.4 and N/A SAT UNSAT (C) determined that the Pressurizer is inoperable and determines action b is applicable.
4. Review applicable actions and Examinee reviewed the applicable N/A SAT UNSAT (C) determine most limiting requirement. Tech Specs and determined that T.S. 3.8.1.1 action b.1 is the most limiting action requirement.

END STOP TIME:

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 4 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:

Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 Fuel x-fer pump inoperable, there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.

INITIATING CUE:

Determine ALL current applicable Unit 2 Tech Specs associated with this condition AND Identify the most restrictive Required Action.

Current applicable Tech Specs:

T.S. 3.8.1.1.b T.S. 3.4.4 Most restrictive Required Action:

3.8.1.1 Action b.1 Demonstrate the OPERABILITY of both the A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 5 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL CONDITIONS:

Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 Fuel x-fer pump inoperable, there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.

INITIATING CUE:

Determine ALL current applicable Unit 2 Tech Specs associated with this condition AND Identify the most restrictive Required Action.

Current applicable Tech Specs:

Most restrictive Required Action:

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 0 DATE:

SYSTEM/DUTY AREA: Radiation Controls TASK: Approve administration of Potassium Iodide.

JTA#: ANO-SRO-EPLAN-EMERG-292 KA VALUE RO: 3.4 SRO: 3.8 KA

REFERENCE:

2.3.14 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform CLASSROOM: Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE(S): 1903.035, Administration of Potassium Iodide EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05 ci/cc in area of work in Upper South Piping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actions and stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodide if required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will be used in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operational TASK STANDARD:

Correctly completed Potassium Iodide (KI) Administration Form 1903.035A AND Did not approve the administration of KI to Joe Mechanic.

TASK PERFORMANCE AIDS: 1903.0035, Potassium Iodide Administration, Form 1903.035C (Completed), ANO Medical Questionnaire-Iodine Sensitivity and Form 1903.035A, Potassium Iodide Administration.

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE: Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork, using OP 1903.035.

START TIME:

Examiner Note: Provide the examinee a KI Administration Form 1903.035A and a Medical Questionnaire-Iodine Sensitivity Form 1903.035C that has been completed by Joe Mechanic PERFORMANCE CHECKLIST STANDARD (Circle One)

N/A SAT UNSAT

1. Review 1903.035, Examinee determined the Administration of Potassium criteria for administration of KI Iodide to determine criteria for is 10 REM exposure to thyroid administering KI. committed dose equivalent or if concentration is unknown, (Step 6.1.1 and Step 6.2.3.C.1) the possibility exists for receiving large amounts of radioactive airborne iodine.

N/A SAT UNSAT (C) 2. Using graph on 1903.035 Determined that expected Attachment 1 and information exposure will exceed 10 REM provided in initial conditions, threshold.

determine that Joe Mechanic will exceed 10 REM during the maintenance evolution.

(Step 6.2.3.B)

N/A SAT UNSAT

3. Complete form 1903.035A. Completed all areas of form 1903.035A, Potassium Iodide (Step 6.3) Administration, from initial conditions:

Estimated Thyroid dose commitment.

Date.

Respiratory Protection Factor.

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Examiner Note: Provide the examinee a KI Administration Form 1903.035A and a Medical Questionnaire-Iodine Sensitivity Form 1903.035C that has been completed by Joe Mechanic PERFORMANCE CHECKLIST STANDARD (Circle One)

N/A SAT UNSAT (C) 4. Determine that Joe Mechanic Reviewed 1903.035C form is sensitive to and has and determined that Joe experienced an allergic Mechanic was sensitive to reaction to Iodide. iodine and has experienced an allergic reaction to iodine in the past.

N/A SAT UNSAT (C) 5. Determine that KI should Examinee did NOT approve be NOT approved for distribution of KI to Joe distribution to Joe Mechanic.

Mechanic during the Upper South Piping penetration work.

END STOP TIME:

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:

The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05 ci/cc in area of work in Upper South Piping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actions and stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodide if required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will be used in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operational INITIATING CUE:

Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork, using OP 1903.035.

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL CONDITIONS:

The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05 ci/cc in area of work in Upper South Piping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actions and stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodide if required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will be used in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operational INITIATING CUE:

Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork, using OP 1903.035.

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 004 DATE:

SYSTEM/DUTY AREA: Emergency Plan TASK: Determine Emergency Action Level/Protective Action Recommendation (Time Critical JPM)

JTA#: ANO-SRO-EPLAN-EMERG-278 KA VALUE RO: 2.9 SRO: 4.6 KA

REFERENCE:

2.4.41 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Classroom: Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

15 Minutes - EAL Classification, APPROXIMATE COMPLETION TIME IN MINUTES: 5 Minutes - Boundary determination REFERENCE(S): 1903.010 Emergency Action Level Classification EXAMINEE'S NAME: BADGE:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Stop Total Time Time Time

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL CONDITIONS: (Time Critical JPM)

A plant trip has occurred due to a loss of offsite power with a concurrent Steam Generator tube rupture on the B Steam Generator estimated to be 200 gpm.

One Main Steam Safety Valve on the B header has stuck open.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19 per chemistry sampling procedure RCS T-cold is 355°F PZR pressure is 1170 psia TASK STANDARD: Determined the following (Time Critical - 15 minutes to classify event):

Determined SAE (FS-1) is the appropriate EAL. (Time Critical)

Determined two or the three fission product barriers are failed or potentially failed. (Not Time Critical)

RCB1: RCS leakage > 44 GPM or RCB2: SGTR results in ECCS actuation CNB3: Primary to secondary leak in steam generator > 10 gpm with stuck open main steam safety valve Determined that Fuel boundary is not failed. (Time Critical)

TASK PERFORMANCE AIDS: 1903.010, Emergency Action Level Classification

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Determine the status of the fission product boundaries and the highest EAL classification from the given initial conditions (list EAL classification and event number).

START:

PERFORMANCE STANDARD (Circle One)

CHECKLIST (C) 1. Determined SAE EAL Using OP 1903.010, determined N/A SAT UNSAT classification. SAE EAL classification FS1, Loss or potential loss of ANY two barriers.

Stop Time:__________

(C) 2.

EAL determination made in EAL determined within 15 minutes. N/A SAT UNSAT 15 minutes.

(C) 3. Determined RCS barrier Determined RCS barrier Lost or status. Potentially Lost using given 200 gpm N/A SAT UNSAT Pri-Sec leak per OP 1903.010, Attachment 2, RCB1. RCS leak > 44 gpm with letdown isolated and/or RCB2 SGTR results in ECCS actuation.

Determined Containment Determined Containment barrier lost (C) 4. fission product barrier using given stuck open main steam N/A SAT UNSAT status. safety valve on Steam Generator with pri-sec leak per 1903.010, Attachment 2 CNB3.

Determined Fuel Clad Determined Fuel Clad barrier NOT (C) 5. N/A SAT UNSAT barrier status. Lost IAW per 1903.010, Attachment 2.

END STOP:

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Examiners Copy This JPM (Cue #1) is time critical INITIAL CONDITIONS:

A plant trip has occurred due to a loss of offsite power with a concurrent Steam Generator tube rupture on the B Steam Generator estimated to be 200 gpm.

One Main Steam Safety Valve on the B header has stuck open.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19 per chemistry sampling procedure RCS T-cold is 355°F PZR pressure is 1170 psia INITIATING CUE #1:

Determine the status of the EAL classification and Event number/code from the given initial conditions.

EAL Class Event number/code SAE FS-1 INITIATING CUE #2:

Determine the status of the fission product boundaries:

Fission product boundary status: Barrier EAL number, code, etc. if (Failed or Intact) applicable.

Containment Failed CNB3 RCS Failed RCB1 and/or RCB2 Fuel Intact N/A

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Examinees Copy This JPM is time critical INITIAL CONDITIONS:

A plant trip has occurred due to a loss of offsite power with a concurrent Steam Generator tube rupture on the B Steam Generator estimated to be 200 gpm.

One Main Steam Safety Valve on the B header has stuck open.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19 per chemistry sampling procedure RCS T-cold is 355°F PZR pressure is 1170 psia INITIATING CUE #1:

Determine the status of the EAL classification from the given initial conditions EAL Classification Event number/code

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Examinees Copy INITIAL CONDITIONS:

A plant trip has occurred due to a loss of offsite power with a concurrent Steam Generator tube rupture on the B Steam Generator estimated to be 200 gpm.

One Main Steam Safety Valve on the B header has stuck open.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19 per chemistry sampling procedure RCS T-cold is 355°F PZR pressure is 1170 psia INITIATING CUE #2:

Determine the status of the fission product boundaries:

Fission product boundary status: Barrier EAL number, code, etc. if (Failed or Intact) applicable.

Containment RCS Fuel

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One Unit 2 Date of Examination: July 2014 Exam Level: RO SRO-I SRO-U X Operating Test No.: 2014-2 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function S1. ANO-2-JPM-NRC-AOP2 5 022 A4.04 RO-3.1/SRO-3.2 D/EN/S Containment Reset CIAS and restore cooling water to containment S2. ANO-2-JPM-NRC-AOP5 3 027 AA1.01 RO-4.0/SRO-3.9 A/N/S Pressure Control Respond to a failed close PZR spray valve S3. ANO-2-JPM-NRC-RCP02 4 003 A4.08 RO-3.2/SRO-2.9 A/D/S RCS Heat Removal Restore component cooling water to reactor coolant pumps S4.

S5.

S6.

S7.

S8.

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1. ANO-2-JPM-AACFO 6 064 K1.03 RO-3.6/SRO-4.0 A/D/E/L Control AAC diesel fuel oil day tank level manually. Electrical P2. ANO-2-JPM-NRC-FPEM1 8 033 A2.03 RO-3.1/SRO-3.5 E/L/P/R Plant service Perform emergency SW make up to SFP systems P3.

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/ 1/ 1 (S)imulator Revision 1

ANO-2-JPM-NRC-AOP02 S1 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:

SYSTEM/DUTY AREA: Containment Cooling Water System TASK: Reset CIAS and establish cooling water to containment JTA#: ANO2-RO-EOPAOP-OFFNORM-219 Alternate Path Yes: No: X Time Critical: Yes: No: X KA VALUE RO: 3.1 SRO: 3.2 KA

REFERENCE:

022-A4.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): 2203.039, Inadvertent CIAS EXAMINEE'S NAME: BADGE #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time

ANO-2-JPM-NRC-AOP02 S1 PAGE 2 OF 7 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

An inadvertent CIAS has occurred.

Steps 1-10 of 2203.039 Inadvertent CIAS AOP have been completed.

TASK STANDARD:

CIAS has been reset by performing the following:

Unlocking the trip path Depressing the CIAS reset pushbutton on 2C-23B Depressing the CIAS reset pushbutton on 2C-40 And Containment Chilled water has been realigned to containment by opening the following valves:

2CV-3851-1 2CV-3852-1 2CV-3850-2 TASK PERFORMANCE AIDS:

OP-2203.039, Inadvertent CIAS SIMULATOR SETUP:

Inadvertent CIAS present.

Containment parameters are below setpoints, Verify CBO to VCT valve, 2CV-4847-2 handswitch is in CLOSE.

EXAMINER NOTES:

None.

ANO-2-JPM-NRC-AOP02 S1 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINERs NOTE:

Only one channel of PPS is modeled on simulator completely. Correctly resetting of this channel will reset CIAS trip paths.

(C) 1. Reset actuation trip path by Examinee obtained key 15 from N/A SAT UNSAT using key 15 to place Shift Manager.

(Step 11.A)

LK/UNLK switch in UNLK. On panel 2C23B examinee placed key in trip path key switch to UNLK.

(C) 2. Depress CIAS pushbutton on Examinee depressed CIAS N/A SAT UNSAT 2C23. pushbutton for trip path.

(Step 11.B)

3. Place LK/UNLK switch in LK Examinee placed trip path N/A SAT UNSAT and remove key. keyswitch to LK and removed key.

(Step 11.C)

4. Repeat steps as needed to Examinee simulated resetting the N/A SAT UNSAT reset remaining trip paths. three remaining trip paths.

(Step 11.D)

Examiners Cue:

All four PPS trip path channels have been reset.

EXAMINERs NOTE:

Only 2C40 is modeled on simulator completely. 2C39 is not modeled on the simulator. Correctly resetting 2C40 will reset CIAS actuation paths.

(C) 5. Depress CIAS Lockout Reset Examinee depressed CIAS Lockout N/A SAT UNSAT pushbutton on 2C40 and Reset pushbutton on 2C40 and (Step 12.A) verify Reset light ON. verified Reset light ON.

ANO-2-JPM-NRC-AOP02 S1 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

6. Depress CIAS Lockout Reset Examinee simulated depressing N/A SAT UNSAT pushbutton on 2C39 and CIAS Lockout Reset pushbutton on (Step 12.B) verify Reset light ON. 2C39 and verified Reset light ON.

Examiners Cue:

2C39 ESF CIAS actuation has been reset.

7. Go to step 14. Examinee transitioned to step 14. N/A SAT UNSAT (Step 12.C)

Procedure Note:

Other ESFAS actuations may require resetting before components can be restored.

8. Open RCP Bleedoff to VCT On panel 2C17, examinee placed N/A SAT UNSAT valve, 2CV-4846-1. handswitch for RCP bleedoff to (Step 14)

VCT valve 2CV-4846-1 to OPEN.

Examinee observed RED light ON and GREEN light OFF above hand switch.

9. Open RCP Bleedoff to VCT On panel 2C16, examinee placed N/A SAT UNSAT valve, 2CV-4847-2. handswitch for RCP bleedoff to (Step 14)

VCT valve 2CV-4847-2 to OPEN.

Examinee observed RED light ON and GREEN light OFF above hand switch.

(C) 10. Open Chilled water to On panel 17, examinee placed N/A SAT UNSAT CNTMT valve 2CV-3851-1. handswitch for Chilled Water to (Step 15.A CNTMT Isolation valve Bullet 1) 2CV-3851-1 to OPEN.

Examinee observed RED light ON and GREEN light OFF above hand switch.

(C) 11. Open Chilled water to On panel 17, examinee placed N/A SAT UNSAT CNTMT valve 2CV-3852-1. handswitch for Chilled Water to (Step 15.A CNTMT Isolation valve Bullet 2) 2CV-3852-1 to OPEN.

Examinee observed RED light ON and GREEN light OFF above hand switch.

ANO-2-JPM-NRC-AOP02 S1 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 12. Open Chilled water to On panel 16, examinee placed N/A SAT UNSAT CNTMT valve 2CV-3850-2. handswitch for Chilled Water to (Step 15.A CNTMT Isolation valve Bullet 3) 2CV-3850-2 to OPEN.

Examinee observed RED light ON and GREEN light OFF above hand switch.

13. Verify ONE Main Chiller On panel 2C22, examinee verified N/A SAT UNSAT (2VCH-1A/1B) running. handswitch for 2VCH-1A is in (Step 15.B) normal after start (RED flagged).

Examiners note:

Examinee observed RED light ON The red light above hand and GREEN light OFF above hand switch for 2VCH-1A switch for 2VCH-1A.

indicates the chiller is running.

Examinee observed RED light ON and GREEN light OFF above label Examiners note: for 2HS-3810.

The red light for 2HS-3810 for 2VCH-1A indicates the Examinee observed all chilled 2A1 breaker is closed. water alarms are clear on annunciator 2K13 (Lights slow flashing or clear).

END STOP TIME:

ANO-2-JPM-NRC-AOP02 S1 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:

An Inadvertent CIAS has occurred.

Steps 1-10 of 2203.039, Inadvertent CIAS AOP have been completed.

INITIATING CUE:

The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.

ANO-2-JPM-NRC-AOP02 S1 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL TASK CONDITIONS:

An Inadvertent CIAS has occurred.

Steps 1-10 of 2203.039, Inadvertent CIAS AOP have been completed.

INITIATING CUE:

The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.

ANO-2-JPM-NRC-AOP05 S2 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: PZR spray operation TASK: Respond to a failed closed PZR spray valve.

JTA#:

Alternate Path Yes: X No: Time Critical Yes: No: X KA VALUE RO: 4.0 SRO: 3.9 KA

REFERENCE:

027 AA1.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform CLASSROOM:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 2203.028 PZR Systems Malfunction EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Stop Total Time Time Time

ANO-2-JPM-NRC-AOP05 S2 PAGE 2 OF 7 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressure and RCS pressure to rise 2CV-4652 B RCP spray valve did not open automatically TASK STANDARD:

Regen HX to RCP B/C valves closed 2CV-4827-2 2CV-4831-2 And Aux spray valve 2CV-4824-2 throttled open to restore RCS pressure 2025 to 2275 psia.

TASK PERFORMANCE AIDS:

2203.028 PZR System Malfunctions SIMULATOR SETUP:

CV4651, value = 0 CV4652, value =0 Steam dump emergency off actuated.

ANO-2-JPM-NRC-AOP05 S2 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINER NOTE: Maintain the simulator in Freeze until the applicant is ready to start.

1. Check the following criteria: Determined that the PZR spray N/A SAT UNSAT valve is failed closed and (Step 1) A. IF any PZR spray valve transitioned to step 4.

failed open, THEN GO TO Step 2.

B. IF any PZR spray valve failed closed, THEN GO TO Step 4.

2. IF ANY PZR Spray valve failed On panel 2C04, rotated N/A SAT UNSAT closed, THEN perform the handswitch (2HS-4652B) for (Step following as needed: 2CV-4652 to manual.

4.A)

Place affected PZR Spray valves in MANUAL:

  • 2CV-4652 (Step Throttle PZR Spray valves as On panel 2C04, placed N/A SAT UNSAT 4.B) necessary to maintain RCS handswitch for 2CV-4652 to pressure 2025 psia to 2275 open.

psia.

Recognized that 2CV-4652 did not open and pressure is continuing to rise.

3. IF PZR Spray valves will NOT Transitioned to 2202.010, N/A SAT UNSAT open, THEN maintain RCS Attachment 48, RCS pressure (Step pressure 2025 psia to 2275 control.

4.B. psia with Aux Spray using continge ncy) 2202.010, Attachment 48, RCS Pressure Control.

Procedure Note:

Once method of pressure control is established, this attachment is not required in hand or continuous use.

A change to the method of pressure control will require in hand or continuous use until the new pressure control method is established.

ANO-2-JPM-NRC-AOP05 S2 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

4. *Maintain RCS pressure with Determined that the PZR N/A SAT UNSAT heaters and spray using one or pressure controller will not (Step more of the following: control pressure.

1.A)

IF desired to use PZR Pressure controller (2PIC-4626A/B), THEN perform the following:

5. IF desired to use PZR Heaters, Determined that the PZR N/A SAT UNSAT THEN perform the following: heaters will not lower pressure.

(Step 1.B) Examiner note: applicant may elect to secure heaters but this will not maintain pressure in the required band.

6. IF desired to use NORMAL Determined that normal spray N/A SAT UNSAT Spray, THEN perform the will not control pressure.

(Step following:

1.C)

7. IF desired to use AUXILIARY Check SPDS or chart recorder N/A SAT UNSAT Spray, THEN perform the and determined that MTS is (Step following: greater than 30 degrees.

1.D.1)

  • Verify RCS MTS greater than 30 degrees.
8. Verify at least ONE Charging Checked at least one charging N/A SAT UNSAT pump running. pump running by red light on (Step 1.D.2) 2P-36A, B, or C Also verified flow on 2FI-4863 or computer (not critical)

(C) 9. Close Regen HX to RCP B/C On panel 2C09, placed N/A SAT UNSAT valves: handswitch for 2CV-4827-2 to (Step 2CV-4827-2 1.D.3) close.

2CV-4831-2 On panel 2C09, placed handswitch for 2CV-4831-2 to close.

Procedure Note:

PZR Spray Block valves 2CV-4653 and 2CV-4655 are de-energized due to degraded power supply cables

10. Verify PZR Spray On panel 2C04, verified 2CV- N/A SAT UNSAT (2CV-4651/2CV-4652) or PZR 4651 and 2CV-4652 closed by (Step Spray Isolation valves green light on and red light off.

1.D.4) (2HS-4655/2HS-4653) closed.

ANO-2-JPM-NRC-AOP05 S2 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 11. Throttle Aux Spray valve On panel 2C09, Throttled 2CV- N/A SAT UNSAT (2CV-4824-2) as necessary. 4824-2 open to restore and (Step 1.D.5) control RCS pressure 2025 to Examiner Cue: 2275 psia.

If asked CRS will direct a band of 2175 to 2225 psia.

END STOP TIME:

ANO-2-JPM-NRC-AOP05 S2 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL CONDITIONS:

Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressure and RCS pressure to rise 2CV-4652 B RCP spray valve did not open automatically INITIATING CUE:

The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.

ANO-2-JPM-NRC-AOP05 S2 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL CONDITIONS:

Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressure and RCS pressure to rise 2CV-4652 B RCP spray valve did not open automatically INITIATING CUE:

The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.

ANO-2-JPM-NRC-RCP02 S3 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 007 DATE:

SYSTEM/DUTY AREA: Reactor Coolant Pumps TASK: Restore component cooling water to reactor coolant pumps JTA#: ANO2-RO-EOPAOP-EMERG-32 Alternate Path Yes: X No: Time Critical: Yes: No: X KA VALUE RO: 3.2 SRO: 2.9 KA

REFERENCE:

003 A4.08 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform CLASSROOM:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT CLASSROOM:

SITE:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): 2202.010 Attachment 21 EXAMINEE'S NAME: BADGE# :

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Stop Total Time Time Time

ANO-2-JPM-NRC-RCP02 S3 PAGE 2 OF 7 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pump has been restored Service water has been aligned to CCW TASK STANDARD:

Controlled bleed off isolated to VCT and CBO relief valve isolated by closing the following valves:

2CV-4846-1 or 2CV-4847-2 and 2CV-4856 TASK PERFORMANCE AIDS:

2202.010 Attachment 21 SIMULATOR SETUP:

Set up CCW valves per EOP 2202.010 Attachment 29 "STARTUP XFM# 2 USAGE" perform actions through step 1.M.6. Close RCP CCW RETURN valve, 2CV-5255-1, 2CV-5254-2 and 2CV-5236-1. NO SIAS actuation and RCP seal temperatures >180.

Set T4 = 2CV 5255 red light. When 2CV 5255-1 is taken to open position, it will trip the breaker T4=DO_HS_5255_R off (override)

T4=DO_HS_5255_G off (override)

T4=CV52551 = 0.0% (component malfunction)

ANO-2-JPM-NRC-RCP02 S3 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21 starting with step 2.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Align Controlled Bleedoff as On panel 2C16 verified N/A SAT UNSAT follows: 2CV-4847-2 red light on; control (Step switch in OPEN.

2 A) IF SIAS OR CIAS NOT actuated, THEN verify RCP Bleedoff to On panel 2C17, verified VCT valves open: 2CV-4846-1 red light on.

2. Verify RCP Bleed-off Relief On panel 2C09, verified N/A SAT UNSAT Isolation to Quench Tank open. 2CV-4856 red light on; key-(Step switch in LOCKED OPEN.

2 B)

3. IF RCP seal temperatures less On panel 2C14 or on PMS N/A SAT UNSAT than 180°F, computer determined RCP seal (Step THEN restore CCW to RCPs temperatures greater than 1800F
3) by performing the following:
4. IF RCP seal temperatures On panel 2C17, verified N/A SAT UNSAT 180°F or greater, 2CV-5255-1 closed.

(Step 4 A) THEN restore CCW to RCPs as follows: Observed green light ON; red light OFF above handswitch.

Verify RCP CCW Return valve (2CV-5255-1) CLOSED.

(C) 5. Verify RCP CCW Supply valve On panel 2C17, placed N/A SAT UNSAT (2CV-5236-1) open. handswitch for 2CV-5236-1 in (Step OPEN.

4 B)

Observed green light OFF; red light ON.

ANO-2-JPM-NRC-RCP02 S3 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 6. Verify RCP CCW Return valve On panel 2C16, Verified N/A SAT UNSAT (2CV-5254-2) open. handswitch for 2CV-5254-2 (Step "OPEN".

4 C)

Observed green light OFF; red light ON.

EXAMINERS NOTE:

When 2CV-5255-1 is taken to OPEN, the breaker will trip and cannot be reset. The valve will be bound closed.

(C) 7. Throttle open RCP CCW On panel 2C17, took handswitch N/A SAT UNSAT Return valve (2CV-5255-1) for 2CV-5255-1 to "OPEN" for (Step with a single 1 second one (1) second then released.

4 D) modulation.

Observed red and green lights Examiner Cue: OFF.

If WCO sent to the valve report that 2CV-5255-1 EXAMINEE may ask to dispatch indicates closed. a NLO to the valve and or If asked 2CV-5255-1 cannot breaker.

be opened.

If AO sent to the breaker, 2B53-G4 report that it is open. If asked the breaker for 2CV-5255-1 cannot be reset.

EXAMINERS NOTE:

The examinee may elect to monitor RCP seal cooldown before making the decision that CCW cannot be restored. This monitoring of RCP seal cooldown may take 10 minutes to validate that 2CV-5255-1 did not open.

The examinee should go to step 5 of Attachment 21.

8. IF EITHER of the following On panel 2C04, observed N/A SAT UNSAT occur, 2P32A, B, C, and D RCP (Step handswitches in STOP or PTL.
5) CCW to RCPs can NOT be restored Observed handswitch is green CCW Surge Tank levels flagged; green light ON and red lower to 13% following light OFF.

restoration THEN verify ALL RCPs stopped.

ANO-2-JPM-NRC-RCP02 S3 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

9. Isolate CCW to RCPs by On panel 2C16, placed N/A SAT UNSAT closing the following valves: handswitch for 2CV-5254-2 to (Step CLOSE 5 A) Close 2CV-5254-2.

Close 2CV-5236-1. Observed green light ON; red light OFF.

On panel 2C17, placed handswitch for 2CV-5236-1 to CLOSE Observed green light ON; red light OFF.

(C) 10. Isolate Controlled Bleedoff as On panel 2C17, placed N/A SAT UNSAT follows: handswitch for 2CV-4846-1 to (Step Verify RCP Bleedoff to VCT CLOSE.

5 B.1) valves closed:

On panel 2C16, placed handswitch for 2CV-4847-2 to 2CV-4846-1 CLOSE.

2CV-4847-2 For each valve, observed green Examiner Note: It is critical light ON; red light OFF.

to close only one valve.

(C) 11. Close RCP bleedoff relief On panel 2C09, placed N/A SAT UNSAT isolation to quench tank valve handswitch for 2CV-4856 to (Step (2CV-4856). CLOSE 5

B.2)

Observed green light ON; red light OFF.

END STOP TIME:

ANO-2-JPM-NRC-RCP02 S3 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:

2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pumps have been restored Service water has been aligned to CCW INITIATING CUE:

The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21 starting with step 2.

ANO-2-JPM-NRC-RCP02 S3 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL CONDITIONS:

2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pumps have been restored Service water has been aligned to CCW INITIATING CUE:

The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21 starting with step 2.

ANO-2-JPM-NRC-AACFO P1 PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:

SYSTEM/DUTY AREA: Emergency Diesel Generator System TASK: Control AAC diesel engine fuel oil day tank level manually JTA#: ANO2-AO-AACDG-OFFNORM-24 Alternate Path Yes: X No: Time Critical: Yes: No: X KA VALUE RO: 3.1 SRO: 3.5 KA

REFERENCE:

064 K1.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: CLASSROOM:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE(S): 2203.012Z Annunciator 2C435 Corrective Action EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Stop Total Time Time Time

ANO-2-JPM-NRC-AACFO P1 PAGE 2 OF 8 JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:

The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarm TASK STANDARD:

Performed either of the following to restore day tank level:

Opened/throttled 2AAC-17 to restore day tank level 40 to 84%, and then closed 2AAC-17.

Or, started 2P-235 to restore day tank level to 40% to 84%, and the secured 2P-235.

TASK PERFORMANCE AIDS:

2203.012Z Annunciator 2C435 Corrective Action SIMULATOR SETUP:

N/A

ANO-2-JPM-NRC-AACFO P1 PAGE 3 OF 8 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs you to locally identify the cause of the AAC SYSTEM TROUBLE alarm and take corrective actions.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Locally identify the cause of At Panel 2C435, locally checked N/A SAT UNSAT the AAC System Trouble annunciator panel to determine alarm. cause of alarm to be 2K432-E2, Fuel Oil Day Tank Level Low.

Examiner Cue:

Demonstrate to the applicant that 2K432-E2 is in alarm.

2. Check PLC touchpad and/or On 2LI-7201A at panel 2C442, N/A SAT UNSAT (Step Fuel Day Tank level examinee observed the fuel oil 2.1) indications: day tank level shows < 20%.

Fuel Oil Day Tank OR level (2LI-7201A) On 2LI-7201B in the engine Fuel Oil Day Tank room, examinee observed the level (2LI-7201B) fuel oil day tank level shows

< 20%.

Day Tank Level (L7201) OR On the Local Computer for L7201, examinee observed the Examiner Cue: fuel oil day tank level shows The local tank level indicator < 20%.

(2LI-7201B) shows 15%.

OR On panel 2C442, 2LI-7201A shows 15%.

OR On the PLC for L7201, observed the fuel oil day tank level shows 15%.

3. Verify T-25 outlet (FO-37) Located deck plate for FO-37. N/A SAT UNSAT (Step OPEN.

2.2.1)

Examiner Cue:

FO-37, T-25 outlet, is OPEN.

EXAMINERS NOTE:

The first path chosen to restore day take level will fail the applicant should then chose the other path to restore day tank level. If it the first path chosen provide the negative cue, and if it is the second path chosen provide the positive cue.

ANO-2-JPM-NRC-AACFO P1 PAGE 4 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4. If using Fuel Transfer pump On 2C-440 rotated 2HS-7106A N/A SAT UNSAT (Step (2P-235), then start from either to MANUAL.

2.2.2) of the following:

OR 2HS-7106A on 2C440 On 2B116 rotated 2HS-7106B to 2HS-7106B on 2B161-D5 MANUAL.

Examiner Cue: This step is critical if it is the second path attempted to If asked 2B161-D5 is closed raise level.

with green light on, and there are no problems noted locally with 2P-235.

Negative Examiner Cue:

When 2HS-7106A on 2C-440 is taken to MANUAL, THEN indicate that tank level does not increase and 2P-235 fuel transfer pump is not rotating.

or When 2HS-7106B on 2B116 is taken to MANUAL, THEN indicate that tank level does not increase and 2P-235 fuel transfer pump is not rotating.

Positive Examiner Cue:

When 2HS-7106A on 2C-440 is taken to MANUAL, THEN indicate that tank level is rising and indicates 70%

or When 2HS-7106B on 2B116 is taken to MANUAL, THEN indicate that tank level is rising and indicates 70%.

TRANSITION NOTE:

Go to the AAC diesel generator engine room.

ANO-2-JPM-NRC-AACFO P1 PAGE 5 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 5. If using Fuel Oil Header 2T-11 Turned 2AAC-17 operating N/A SAT UNSAT (Step Bypass, then open Fuel Oil handle CCW to the full open 2.2.3) Header 2T-11 Bypass position.

(2AAC-17).

OR Throttled 2AAC-17 to increase Positive Examiner Cue: day tank level.

When 2AAC-17 is simulated opening, Then indicate Checked Fuel Oil Day Tank 2AAC-17 turns in the CCW (2T-11) level rising.

direction and tank level is rising and indicates 70%.

Negative Examiner Cue: This step is critical if it is the second path attempted to When 2AAC-17 is simulated raise level.

opening, Then indicate that 2AAC-17 handwheel is spinning freely and tank level does not increase.

(C) 6. When Fuel Day Tank level WHEN 2T-11 level is > 40%, N/A SAT UNSAT (Step (2LT-7201) 40 to 84%, THEN examinee rotated 2AAC-17 CW 2.2.4) perform EITHER of the to close.

following:

Stop Fuel Transfer pump (2P-235) from either of the following:

o 2HS-7106A on 2C440 o 2HS-7106B on 2B161-D5 Close Fuel Oil Header 2T-11 Bypass (2AAC-17).

Examiner Cue:

Give either of the following cues based on method used to raise tank level.

If 2AAC-17 is taken to close, then 2AAC-17 shut seat is felt and the valve operating handle will NOT turn further and tank level is stable.

Or If 2P-235 HS is taken to stop, then 2P-235 stops running when the HS is taken to stop.

ANO-2-JPM-NRC-AACFO P1 PAGE 6 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

7. Depress Reset PLC touchpad. At the local computer touched N/A SAT UNSAT (Step screen, depressed the PLC 3.2) touchpad or used Examiner Cue: acknowledge/reset switch to reset PLC.

PLC touchpad depressed.

Alarm for Low Day Tank Level is clear.

END STOP TIME:

ANO-2-JPM-NRC-AACFO P1 PAGE 7 OF 8 JOB PERFORMANCE MEASURE Examiners Copy INITIAL CONDITIONS:

The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarm INITIATING CUE:

The SM/CRS directs you to locally identify the cause of the AAC SYSTEM TROUBLE alarm and take corrective actions.

ANO-2-JPM-NRC-AACFO P1 PAGE 8 OF 8 JOB PERFORMANCE MEASURE Examinees Copy INITIAL CONDITIONS:

The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarm INITIATING CUE:

The SM/CRS directs you to locally identify the cause of the AAC SYSTEM TROUBLE alarm and take corrective actions.

ANO-2-JPM-NRC-FPEM1 P2 PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 013 DATE:

SYSTEM/DUTY AREA: Spent Fuel Pool Cooling System TASK: Perform service water emergency makeup to the SFP (with Loop 1 service water)

JTA#: ANO2-WCO-SFP-EMER1 Alternate Path Yes: No: X Time Critical: Yes: No: X KA VALUE RO: 3.1 SRO: 3.5 KA

REFERENCE:

033 A2.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: CLASSROOM:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE(S): 2104.006 Fuel Pool Systems EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Stop Total Time Time Time

ANO-2-JPM-NRC-FPEM1 P2 PAGE 2 OF 8 JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:

(2K11-K5) FUEL POOL TEMP HI is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool level Fuel pool level is low 2P66 is aligned to the RWT and running You are the on watch WCO operator Examiner Note: Approved protected train paperwork will be provided to the examiner to allow entry past protected equipment postings for completion of this JPM.

TASK STANDARD:

Aligned Emergency SFP makeup from Loop 1 service water has been commenced by verifying RWT recirc valves are closed, Fuel Pool makeup valves open (2FP-31, 2FP-46, 2SW-57), Service water drain valve closed 2SW-8401, and 2SW-138 throttled open to raise SFP level.

TASK PERFORMANCE AIDS:

2104.006 Fuel Pool Systems Section 14.3.

Do not use a cloth lanyard in a Radiologically controlled area.

SIMULATOR SETUP:

N/A

ANO-2-JPM-NRC-FPEM1 P2 PAGE 3 OF 8 JOB PERFORMANCE MEASURE The CRS directs you to Align Loop 1 service water to provide emergency makeup to the spent fuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

Examiner Note:

Ladders in the aux building are controlled by both Operations and RP. Operations dept. has keys to the ladders but if access is needed greater than 8 RP must be contacted.

1. IF SFP or RWT aligned for Locally rotated 2P66 handswitch N/A SAT UNSAT (Step Purification, THEN secure Fuel (2HS-5411) to STOP and 14.3.1) Pool Purification pump 2P-66 released.

(2HS-5411) to prevent rapid depletion of Fuel Pool DI (2T-5) or addition of Service Water to Observed green light ON, red light the RWT. OFF.

Examiner Cue:

After the pump is simulated to be stopped Report Green light ON, red light OFF.

TRANSITION NOTE:

Go to elevation 354 RAB, just north of the elevator, to the SFP valve gallery.

2. Verify the following valves Closed 2FP-32 by turning N/A SAT UNSAT (Step closed: handwheel clockwise and 14.3.2) observing valve stem insertion Borated MU or RWT to 2P-66 until resistance felt.

(2FP-32)

Examiner Cue:

2FP-32 stem is fully inserted and resistance is felt.

TRANSITION NOTE:

Go to elevation 335' RAB just off elevator

3. Verify the following valves Contacted Control Room to close N/A SAT UNSAT (Step closed: 2CV-5637-1.

14.3.2) RWT Recirculation Isolation (2CV-5637-1).

Examiner Cue:

Control room reports 2CV-5637-1 indicates closed.

Or locally at the valve, the stem fully down/inserted.

ANO-2-JPM-NRC-FPEM1 P2 PAGE 4 OF 8 JOB PERFORMANCE MEASURE

4. Verify the following valves Contacted Control Room to close N/A SAT UNSAT (Step closed: 2CV-5638-2.

14.3.2) RWT Recirculation Isolation (2CV-5638-2) closed.

Examiner Cue:

Control room reports 2CV-5638-2 indicates closed.

Or locally at the valve, the stem fully down/inserted.

TRANSITION NOTE:

Go to elevation 354 RAB, just north of the elevator, to the SFP valve gallery.

(C) 5. Open Borated MU, RWT, SW to Opened 2FP-31 by turning N/A SAT UNSAT (Step Fuel Pool (2FP-31). handwheel CCW.

14.3.3)

Examiner Cue: Observed valve stem fully withdrawn out of the valve.

2FP-31 stem is fully extended.

(C) 6. Open RWT to Fuel Pool Isolation Opened 2FP-46 by turning N/A SAT UNSAT (Step (2FP-46). handwheel CCW.

14.3.4)

Examiner Cue: Observed valve stem fully withdrawn out of the valve.

2FP-46 stem is fully extended.

TRANSITION NOTE:

Go to elevation 335' RAB just off elevator.

(C) 7. Close SW Header 1 Telltale Closed 2SW-8401 by turning N/A SAT UNSAT (Step Drain (2SW-8401). handwheel CW.

14.3.5)

Examiner Cue: Observed valve stem fully inserted into the valve.

2SW-8401 has stem inserted into handwheel and resistance is felt.

8. Record unlocking of SW Hdr 1 Contacted the Control Room to N/A SAT UNSAT (Step Emerg Feed Isol (2SW-57) record 2SW-57 in the Cat E log.

14.3.6. in Cat E log.

A)

Examiner Cue:

2SW-57 has been recorded in the Cat E log.

ANO-2-JPM-NRC-FPEM1 P2 PAGE 5 OF 8 JOB PERFORMANCE MEASURE (C) 9. Unlock and open SW Header 1 Unlocked locking device on N/A SAT UNSAT (Step Emergency Feed Isolation (2SW- 2SW-57 using category "E" valve 14.3.6. 57). key.

B)

Opened 2SW-57 by turning handwheel CCW.

Examiner Cue:

Observed valve stem fully 2SW-57 is unlocked and valve withdrawn out of the valve.

stem is fully extended.

ANO-2-JPM-NRC-FPEM1 P2 PAGE 6 OF 8 JOB PERFORMANCE MEASURE Procedure Caution:

If SFP overfilled, water can spill through SFP Cooling/SFP Purification pipe chase (SFP, ~ 402', SW corner) and contaminate SFP valve gallery (AB 354') and hall near 2F-3A/B (AB 335')

If flow introduced with level > 401' 7", some overflow can occur due to wave motion of water.

Procedure Note:

If CLP (2LI-5400) used as SFP level indication during SFP drain and fill evolutions, SFP and CLP levels will differ slightly until water levels equalize through seal area.

10. IF two Operators available, Verified that an Operator was N/A SAT UNSAT (Step THEN establish and maintain the stationed to monitor SFP level 14.3.7. following:

A)

Operator stationed at SFP to continuously monitor level:

SFP (2LI-5401)

CLP (2LI-5400) if gate removed or deflated Examiner Cue:

Operator is stationed at SFP to monitor level responds to radio communications.

11. Operator stationed at SFP SW Examinee positions self at 2SW- N/A SAT UNSAT (Step Hdr 1 Emerg Feed Isol to 138.

14.3.7. SF Pool (2SW-138) for valve B) adjustment.

12. Communications between Examinee establishes N/A SAT UNSAT (Step stationed Operators. communication with Operator 14.3.7. stationed at the Spent Fuel Pool Examiner Cue:

C)

Operator that stationed at SFP to monitor level responds to radio communications.

13. *IF level being maintained Examinee assesses level being N/A SAT UNSAT (Step without frequent valve maintained.

14.3.7. adjustment, D) THEN the following may be performed:

Secure Operator at 2SW-138.

Reassign remaining Operator to continuously monitor SFP level EXCEPT when 2SW-138 adjustment needed.

Examiner Cue:

Operator at SFP will monitor if level can be maintained without frequent adjustments EXAMINERS NOTE:

- Final valve position is at discretion of examinee to ensure level is raised/maintained.

ANO-2-JPM-NRC-FPEM1 P2 PAGE 7 OF 8 JOB PERFORMANCE MEASURE

14. IF two Operators NOT available, Determined that two operators are N/A SAT UNSAT (Step THEN perform the following: available from initial conditions.

14.3.8) Obtain SM/CRS concurrence.

Station one Operator to align for fill and continuously monitor level EXCEPT when adjusting valve.

(C) 15. Throttle open SW Header 1 Throttled open 2SW-138 by N/A SAT UNSAT (Step Emergency Feed Isolation to SF turning handwheel CCW.

14.3.9) Pool (2SW-138) between 401'4" and 401'7".

Observed valve stem withdrawn out of the valve commensurate Examiner Cue: with valves throttling.

Operator stationed at SFP reports level rising slowly.

END STOP TIME:

ANO-2-JPM-NRC-FPEM1 P2 PAGE 8 OF 8 JOB PERFORMANCE MEASURE Examiners Copy Examiner Note: Approved protected train paperwork will be provided to the examiner to allow entry past protected equipment postings for completion of this JPM.

INITIAL CONDITIONS:

(2K11-K5) FUEL POOL TEMP HI is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool level Fuel pool level is low 2P66 is aligned to the RWT and running You are the on watch WCO operator INITIATING CUE:

The CRS directs you to align Loop 1 service water to provide emergency makeup to the spent fuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.

ANO-2-JPM-NRC-FPEM1 P2 PAGE 9 OF 8 JOB PERFORMANCE MEASURE Examinees Copy INITIAL CONDITIONS:

(2K11-K5) FUEL POOL TEMP HI is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool level Fuel pool level is low 2P66 is aligned to the RWT and running You are the on watch WCO operator INITIATING CUE:

The CRS directs you to align Loop 1 service water to provide emergency makeup to the spent fuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.