(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 07/27/2016 | | | issue date = 07/27/2016 |
| | title = Withdrawal of License Amendment Requests (LAR) 15-03, Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements | | | title = Withdrawal of License Amendment Requests (LAR) 15-03, Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements |
| | author name = Marik S M | | | author name = Marik S |
| | author affiliation = Omaha Public Power District | | | author affiliation = Omaha Public Power District |
| | addressee name = | | | addressee name = |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:LIC-16-0051 July 27, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | | {{#Wiki_filter:10 CFR 50.90 LIC-16-0051 July 27, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285 |
|
| |
|
| ==References:== | | ==References:== |
| | : 1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "License Amendment Request 15-03; Revise Current Licensing Basis to Use ACI Ultimate Strength Requirements," dated August 31, 2015 (LIC-15-0077) (ML15243A167) |
| | : 2. Letter from NRC (C. F. Lyon) to OPPD (L. P. Cortopassi) , "Fort Calhoun Station, Unit No. 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action RE: Revise Current Licensing Basis to use American Concrete Institute Ultimate Strength Requirements (CAC NO . MF6676)," dated December 15, 2015 (NRC-15-104) (ML15341A224) |
| | : 3. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Supplement of License Amendment Request 15-03; Revise Current Licensing Basis to Use ACI Ultimate Strength Requirements," dated December 23, 2015 (LIC-15-0142) (CAC NO. MF6676)(ML15363A042) |
| | : 4. Letter from OPPD (T. Burke) to USNRC (Document Control Desk), "Certification of Permanent Cessation of Power Operations," dated June 24, 2016 (LIC-16-0043) |
|
| |
|
| Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285 10 CFR 50.90 1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "License Amendment Request 15-03; Revise Current Licensing Basis to Use ACI Ultimate Strength Requirements," dated August 31, 2015 (LIC-15-0077) (ML 15243A167)
| | ==Subject:== |
| : 2. Letter from NRC (C. F. Lyon) to OPPD (L. P. Cortopassi), "Fort Calhoun Station , Unit No. 1 -Supplemental Information Needed for Acceptance of Requested Licensing Action RE: Revise Current Licensing Basis to use American Concrete Institute Ultimate Strength Requirements (CAC NO. MF6676)," dated December 15 , 2015 (NRC-15-104) (ML 15341A224)
| | Withdrawal of License Amendment Requests (LAR) 15-03, Revise Current Licensing Basis to Use ACI Ultimate Strength Requirements The purpose of this letter is to withdraw LAR 15-03 (Reference 1), which the Omaha Public Power District (OPPD) had requested to revise the current licensing basis to allow the use of ACI Ultimate Strength Requirements at Fort Calhoun Station, Unit No. 1 (FCS). References 2 and 3 updated the initial LAR. |
| : 3. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Supplement of License Amendment Request 15-03; Revise Current Licensing Basis to Use ACI Ultimate Strength Requirements," dated December 23, 2015 (LIC-15-0142) (CAC NO. MF6676)(ML 15363A042)
| | Reference 4 documents OPPD's decision to cease power operations at FCS. Following this decision, OPPD has determined that this LAR is no longer needed and is withdrawing LAR 15-03. |
| : 4. Letter from OPPD (T. Burke) to USNRC (Document Control Desk), "Certification of Permanent Cessation of Power Operations," dated June 24, 2016 (LIC-16-0043)
| | - = - - |
| | -~-;1*. |
| | ~-____,. |
| | - - -- ' (AIPlOl'Mrttr,Wf1JltQIJAL*Of.POtnllNfn' |
| | - I * ' |
|
| |
|
| ==Subject:==
| |
| Withdrawal of License Amendment Requests (LAR) 15-03, Revise Current Licensing Basis to Use ACI Ultimate Strength Requirements The purpose of this letter is to withdraw LAR 15-03 (Reference 1 ), which the Omaha Public Power District (OPPD) had requested to revise the current licensing basis to allow the use of ACI Ultimate Strength Requirements at Fort Calhoun Station, Unit No. 1 (FCS). References 2 and 3 updated the initial LAR. Reference 4 documents OPPD's decision to cease power operations at FCS. Following this decision, OPPD has determined that this LAR is no longer needed and is withdrawing LAR 15-03. . *.*-
| |
| -----'(AIPlOl'Mrttr,Wf1JltQIJAL
| |
| *Of.POtnllNfn'
| |
| -. -= --
| |
| --I * '
| |
| LIC-16-0051 Page 2 No regulatory commitments are contained in this submittal. | | LIC-16-0051 Page 2 No regulatory commitments are contained in this submittal. |
| If you should have any questions regarding this submittal or requ i re additional information , please contact Mr. Bradley H. Blome at 402-533-7270. Shane M. Marik Site Vice President and CNO SMM/epm c: K. M. Kennedy, NRC Regional Administrator, Region IV C. F. Lyon, NRC Senior Project Manager S. M. Schneider, NRC Senior Resident Inspector Director of Consumer Health Services, Department of Regulation and Licensure, Nebraska Health and Human Services , State of Nebraska}} | | If you should have any questions regarding this submittal or require additional information, please contact Mr. Bradley H. Blome at 402-533-7270. |
| | Shane M. Marik Site Vice President and CNO SMM/epm c: K. M. Kennedy, NRC Regional Administrator, Region IV C. F. Lyon, NRC Senior Project Manager S. M. Schneider, NRC Senior Resident Inspector Director of Consumer Health Services, Department of Regulation and Licensure, Nebraska Health and Human Services, State of Nebraska}} |
Letter Sequence Withdrawal |
---|
|
|
MONTHYEARLIC-15-0077, License Amendment Request 15-03; Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements2015-08-31031 August 2015 License Amendment Request 15-03; Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements Project stage: Request ML15344A3492015-12-0404 December 2015 NRR E-mail Capture - Non-Acceptance with Opportunity to Supplement Project stage: Acceptance Review ML15341A2242015-12-15015 December 2015 Supplemental Information Needed for Acceptance of Requested Licensing Action Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements Project stage: Acceptance Review LIC-15-0142, Supplement of License Amendment Request 15-03; Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements2015-12-23023 December 2015 Supplement of License Amendment Request 15-03; Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements Project stage: Supplement ML16007A3852016-01-15015 January 2016 Acceptance of Requested Licensing Action Following Supplement, Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements Project stage: Acceptance Review ML16104A2872016-04-25025 April 2016 Request for Additional Information, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements Project stage: RAI ML16165A0282016-06-0909 June 2016 Response to NRC Request for Additional Information Revise Current Licensing Basis to Use American Concrete Institute Ultimate Strength Requirements Project stage: Response to RAI LIC-16-0051, Withdrawal of License Amendment Requests (LAR) 15-03, Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements2016-07-27027 July 2016 Withdrawal of License Amendment Requests (LAR) 15-03, Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements Project stage: Withdrawal ML16209A3692016-08-0202 August 2016 Letter, Withdrawal of Requested Licensing Action, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements Project stage: Withdrawal ML16209A3702016-08-0202 August 2016 FRN, Withdrawal of Requested Licensing Action, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements Project stage: Withdrawal NRC-2016-0040, FRN, Withdrawal of Requested Licensing Action, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements2016-08-0202 August 2016 FRN, Withdrawal of Requested Licensing Action, License Amendment Request to Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements Project stage: Withdrawal 2016-01-15
[Table View] |
|
---|
Category:Letter type:LIC
MONTHYEARLIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 LIC-18-0028, Letter of Intent to Submit Request for Additional Partial Site Release2018-10-18018 October 2018 Letter of Intent to Submit Request for Additional Partial Site Release 2024-06-18
[Table view] |
Text
10 CFR 50.90 LIC-16-0051 July 27, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285
References:
- 1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "License Amendment Request 15-03; Revise Current Licensing Basis to Use ACI Ultimate Strength Requirements," dated August 31, 2015 (LIC-15-0077) (ML15243A167)
- 2. Letter from NRC (C. F. Lyon) to OPPD (L. P. Cortopassi) , "Fort Calhoun Station, Unit No. 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action RE: Revise Current Licensing Basis to use American Concrete Institute Ultimate Strength Requirements (CAC NO . MF6676)," dated December 15, 2015 (NRC-15-104) (ML15341A224)
- 3. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "Supplement of License Amendment Request 15-03; Revise Current Licensing Basis to Use ACI Ultimate Strength Requirements," dated December 23, 2015 (LIC-15-0142) (CAC NO. MF6676)(ML15363A042)
- 4. Letter from OPPD (T. Burke) to USNRC (Document Control Desk), "Certification of Permanent Cessation of Power Operations," dated June 24, 2016 (LIC-16-0043)
Subject:
Withdrawal of License Amendment Requests (LAR) 15-03, Revise Current Licensing Basis to Use ACI Ultimate Strength Requirements The purpose of this letter is to withdraw LAR 15-03 (Reference 1), which the Omaha Public Power District (OPPD) had requested to revise the current licensing basis to allow the use of ACI Ultimate Strength Requirements at Fort Calhoun Station, Unit No. 1 (FCS). References 2 and 3 updated the initial LAR.
Reference 4 documents OPPD's decision to cease power operations at FCS. Following this decision, OPPD has determined that this LAR is no longer needed and is withdrawing LAR 15-03.
- = - -
-~-;1*.
~-____,.
- - -- ' (AIPlOl'Mrttr,Wf1JltQIJAL*Of.POtnllNfn'
- I * '
LIC-16-0051 Page 2 No regulatory commitments are contained in this submittal.
If you should have any questions regarding this submittal or require additional information, please contact Mr. Bradley H. Blome at 402-533-7270.
Shane M. Marik Site Vice President and CNO SMM/epm c: K. M. Kennedy, NRC Regional Administrator, Region IV C. F. Lyon, NRC Senior Project Manager S. M. Schneider, NRC Senior Resident Inspector Director of Consumer Health Services, Department of Regulation and Licensure, Nebraska Health and Human Services, State of Nebraska