L-2017-080, NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 27: Line 27:
                     ,,;P-"""""'4,.0                                          Information collection is used to plan budgets and resources for operator examinations. Send ti
                     ,,;P-"""""'4,.0                                          Information collection is used to plan budgets and resources for operator examinations. Send ti
                 ~                ?,.
                 ~                ?,.
OPERATOR LICENSING                  commenls regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5
OPERATOR LICENSING                  commenls regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 0
                                    .
0
              .
              <
               ~
               ~
                 ~                ,f c0 EXAMINATION DATA
                 ~                ,f c0 EXAMINATION DATA
Line 37: Line 33:
                 ~+.,,        +.~                                          NEOB-10202, (315!1-0131), Office of Management and Budget Washington, DC 20503. ff a means
                 ~+.,,        +.~                                          NEOB-10202, (315!1-0131), Office of Management and Budget Washington, DC 20503. ff a means
                       ***'*"'                                              used to impose an information collection does not display a currentiy valid OMB control number, the NRG may not conduct or sponsor, and a perscn Is not required to respond to, the in1ormation collection.
                       ***'*"'                                              used to impose an information collection does not display a currentiy valid OMB control number, the NRG may not conduct or sponsor, and a perscn Is not required to respond to, the in1ormation collection.
FACILITY                                                                                                            NRC REGION St Lucie Plant                                                                                                      II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                        CY2019
FACILITY                                                                                                            NRC REGION St Lucie Plant                                                                                                      II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                        CY2019 CY2020
                                                    --
                                                                           --                                  CY2021 CY2022 ESTIMATED NUMBER OF LICENSEE-PREPARED                          1                    1                                          0                                          1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                          0                    0                                          0                                          0 EXAMINATIONS
CY2020
: 8. INITIAL OPERATOR LICENSE EXAMINATIONS CY2019              CY2020                              CY2021                                    CY2022 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 3                    9                                                                                      6 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT                          9                    7                                                                                      8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                            2                    2                                                                                      2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                          0                    0                                                                                    0 PROPOSED DATES PRIMARY DATE                      03/18/2019            05/04/2020                                                                      03/07/2022 ALTERNATE DATE                      04/01/2019            05/18/2020                                                                      03/21/2022
                                                                           --                                  CY2021
                                                                                                                    --                                        -
CY2022 ESTIMATED NUMBER OF LICENSEE-PREPARED                          1                    1                                          0                                          1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                          0                    0                                          0                                          0 EXAMINATIONS
: 8. INITIAL OPERATOR LICENSE EXAMINATIONS CY2019              CY2020                              CY2021                                    CY2022 PROPOSED NUMBER
                                                    --                  --                                    --                                        ---
NUMBER OF REACTOR OPERATORS 3                    9                                                                                      6 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT                          9                    7                                                                                      8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                            2                    2                                                                                      2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                          0                    0                                                                                    0 PROPOSED DATES PRIMARY DATE                      03/18/2019            05/04/2020                                                                      03/07/2022 ALTERNATE DATE                      04/01/2019            05/18/2020                                                                      03/21/2022
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2020                                                                    2021 PROPOSED NUMBER MARCH CY
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2020                                                                    2021 PROPOSED NUMBER MARCH CY
                                                     --    SEPTEMBER                          MARCH CY
                                                     --    SEPTEMBER                          MARCH CY
                                                                                                                             ---              SEPTEMBER ESTIMATED NUMBER OF                                                14                                                                                      10 CANDIDATES NRG FORM 536 (05-2016)
                                                                                                                             ---              SEPTEMBER ESTIMATED NUMBER OF                                                14                                                                                      10 CANDIDATES NRG FORM 536 (05-2016)
J}}
J}}

Latest revision as of 18:20, 4 February 2020

NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations
ML17129A598
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/04/2017
From: Deboer D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2017-080, RIS-17-003
Download: ML17129A598 (2)


Text

MAY 0 4 2017 L-2017-080 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 NRC Regulatory Issue Summary 2017-03 Preparation And Scheduling of Operator Licensing Examinations On April 5, 2017, NRC issued Regulatory Issue Summary (RIS) 2017-03, Preparation and Scheduling of Operator Licensing Examinations. RIS 2017-03 requests licensees to submit, on a voluntary basis, information pertaining to their proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take operator licensing examinations and the NRC generic fundamentals examinations (GFEs).

The NRC stated that this information would help the NRC to more effectively utilize its resources. A response was requested within 30 days of receipt of RIS 2017-03.

Attached please'fihdthe completed NRC Form 536, OperatorUcensing Examination Data, for St. Lucie Units 1 and 2.

Please contact Mr. Richard Baird at 772-467-7435 or Mr. Erik Feightner at 772-467-7350 if there are questions regarding this submittal.

Very truly yours, Daniel DeBoer Site Director St. Lucie Plant DD/tit Attachment cc: Gerald J. McCoy, DRS, 081, Rll Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

~)

NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150--0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information coDection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~~

,,;P-"""""'4,.0 Information collection is used to plan budgets and resources for operator examinations. Send ti

~  ?,.

OPERATOR LICENSING commenls regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 0

~

~ ,f c0 EXAMINATION DATA

  • F53), U.S.. Nuclear Regulatory Commission, Washington, DC2055&-0001, or by e-mail to lnfocollecls.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affalrs,

~+.,, +.~ NEOB-10202, (315!1-0131), Office of Management and Budget Washington, DC 20503. ff a means

      • '*"' used to impose an information collection does not display a currentiy valid OMB control number, the NRG may not conduct or sponsor, and a perscn Is not required to respond to, the in1ormation collection.

FACILITY NRC REGION St Lucie Plant II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2019 CY2020

-- CY2021 CY2022 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS CY2019 CY2020 CY2021 CY2022 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 3 9 6 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 9 7 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE 03/18/2019 05/04/2020 03/07/2022 ALTERNATE DATE 04/01/2019 05/18/2020 03/21/2022
c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2020 2021 PROPOSED NUMBER MARCH CY

-- SEPTEMBER MARCH CY

--- SEPTEMBER ESTIMATED NUMBER OF 14 10 CANDIDATES NRG FORM 536 (05-2016)

J