VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 5, 1998 United States Nuclear Regulatory Commission                          Serial No. 98-073 Attention: Document Control Desk                                      NL&OS/GDM RO Washington, D.C. 20555                                                Docket No. 50-280 50-281 License No. DPR-32 DPR-37 Gentlemen:
* VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 5, 1998 United States Nuclear Regulatory Commission                          Serial No. 98-073 Attention: Document Control Desk                                      NL&OS/GDM RO Washington, D.C. 20555                                                Docket No. 50-280 50-281 License No. DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 ANNUAL STEAM GENERATOR INSERVICE INSPECTION  
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 ANNUAL STEAM GENERATOR INSERVICE INSPECTION  


Line 31: Line 30:


cc:
cc:
* U. ~- Nuclear Regulatory Commission
U. ~- Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station
* Region II Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station
* ATTACHMENT 1 SURRY UNIT 1, MARCH 1997 REFUELING OUTAGE STEAM GENERATOR "A", EDDY CURRENT EXAMINATION  
* ATTACHMENT 1
* SURRY UNIT 1, MARCH 1997 REFUELING OUTAGE STEAM GENERATOR "A", EDDY CURRENT EXAMINATION  


==SUMMARY==
==SUMMARY==
Line 42: Line 39:
Row                        Column 1                            35 1                            36 1                            37 32                          68 14                          85 This Steam Generator contains a total of eleven plugged tubes. See the attached list for details.
Row                        Column 1                            35 1                            36 1                            37 32                          68 14                          85 This Steam Generator contains a total of eleven plugged tubes. See the attached list for details.
1
1
* SURRY 1, STEAM GENERATOR 11 A 11 , MARCH 1997
 
* ROW          COLUMN                INDICATION            LOCATION          REMARKS 33                16                      10                  AV2 37                22                      10                  AV1 1                35                      RST                  TEC            plugged*
SURRY 1, STEAM GENERATOR 11 A 11 , MARCH 1997 ROW          COLUMN                INDICATION            LOCATION          REMARKS 33                16                      10                  AV2 37                22                      10                  AV1 1                35                      RST                  TEC            plugged*
1                36                      RST                  TEC            plugged*
1                36                      RST                  TEC            plugged*
1                37                      RST                  TEC            plugged*
1                37                      RST                  TEC            plugged*
Line 52: Line 49:
***Preventively plugged; due to permeability variations, this tube is considered uninspectable.
***Preventively plugged; due to permeability variations, this tube is considered uninspectable.
2
2
* ATTACHMENT 2
* ATTACHMENT 2 SURRY UNIT 2. OCTOBER 1997 REFUELING OUTAGE STEAM GENERATOR "B". EDDY CURRENT EXAMINATION  
* SURRY UNIT 2. OCTOBER 1997 REFUELING OUTAGE STEAM GENERATOR "B". EDDY CURRENT EXAMINATION  


==SUMMARY==
==SUMMARY==
Line 62: Line 58:


                 ~ - - - - - - -
                 ~ - - - - - - -
l
l SURRY 2, STEAM GENERATOR 11 8 11 , OCTOBER 1997 ROW  COLUMN        INDICATION          LOCATION      REMARKS 1      34              RST                          plugged 1      35              RST                          plugged 37      59              21                AV3        plugged 32      69              12                AV2 36      69              20                AV2        plugged 40      70              25                AV3        plugged 4
:
          *
* SURRY 2, STEAM GENERATOR 11 8 11 , OCTOBER 1997 ROW  COLUMN        INDICATION          LOCATION      REMARKS 1      34              RST                          plugged 1      35              RST                          plugged 37      59              21                AV3        plugged 32      69              12                AV2 36      69              20                AV2        plugged 40      70              25                AV3        plugged 4


. ,;
. ,;
      ...
* ATTACHMENT 3 GLOSSARY OF TERMS
        "
* ATTACHMENT 3
* GLOSSARY OF TERMS
: 1. ROW, COL - COLUMN - Tube identifier numbers - an X-Y coordinate system.
: 1. ROW, COL - COLUMN - Tube identifier numbers - an X-Y coordinate system.
: 2. IND - INDICATION - Character codes and numerics that represent the analysis results of the data for that tube, e.g., RST, 25%, etc.
: 2. IND - INDICATION - Character codes and numerics that represent the analysis results of the data for that tube, e.g., RST, 25%, etc.

Revision as of 22:19, 2 February 2020

Submits SG ISI Summary Rept for Surry Power Station,Units 1 & 2 During 1997 Per TS 4.19.F.b.Summary of Results of Exams & Glossary of Terms Used in Rept,Encl
ML18153A362
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/05/1998
From: Mccarthy J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
98-073, 98-73, NUDOCS 9802180075
Download: ML18153A362 (7)


Text

  • '

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 5, 1998 United States Nuclear Regulatory Commission Serial No.98-073 Attention: Document Control Desk NL&OS/GDM RO Washington, D.C. 20555 Docket No. 50-280 50-281 License No. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 ANNUAL STEAM GENERATOR INSERVICE INSPECTION

SUMMARY

REPORT Pursuant to Technical Specification 4.19.F.b, Virginia Electric and Power Company is submitting the 1997 Steam Generator lnservice Inspection Summary Report for Surry Power Station Units 1 and 2.

During the March 1997 refueling outage for Surry Unit 1, the tubes in the "A" steam generator were examined, and during the October 1997 refueling outage for Surry Unit 2, the tubes in the "B" steam generator were examined. Attachments 1 and 2 provide the summaries of the results of those examinations, respectively. The summaries include the number and extent of the tubes examined, location and characterization of each indication of an imperfection, and identification of tubes that were plugged. Attachment 3 provides a glossary of terms used in the report.

This letter does not establish any new commitments. Should you have any questions or require additional information, please contact us.

Very truly yours, Support Attachments

-)g]2180075 9802()5- ----------------

G ADOCK 05000280 PDR

.i . ;~~; 7~~***-..;.., -

cc:

U. ~- Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station

  • ATTACHMENT 1 SURRY UNIT 1, MARCH 1997 REFUELING OUTAGE STEAM GENERATOR "A", EDDY CURRENT EXAMINATION

SUMMARY

In Steam Generator "A", all but three available tubes were inspected full length with bobbin probes. Three row one tubes (R1-C35, R1-C36, R1-C37) were plugged due to restrictions that would not allow the bobbin probe to pass *through. A 739 tube sample was tested with Rotating Pancake Coil (RPC) probes in the hot leg transition (TSH +/- 3")

region. Supplemental examinations were also performed using RPC probes where additional confirmatory or other data was desired. The following tubes were plugged:

Row Column 1 35 1 36 1 37 32 68 14 85 This Steam Generator contains a total of eleven plugged tubes. See the attached list for details.

1

SURRY 1, STEAM GENERATOR 11 A 11 , MARCH 1997 ROW COLUMN INDICATION LOCATION REMARKS 33 16 10 AV2 37 22 10 AV1 1 35 RST TEC plugged*

1 36 RST TEC plugged*

1 37 RST TEC plugged*

46 43 13 AV1 46 45 13 AV1 32 68 16 AV1 plugged 32 68 25 AV2 plugged**

32 68 17 AV3 plugged 32 69 17 AV2 32 69 12 AV4 37 72 14 AV4 37 75 18 AV2 14 85 PVN plugged***

  • Preventively plugged dLie to restriction of tube.
    • Preventively plugged due to indication of recent growth rate calculated at approximately 3.7% per fuel cycle since the last inspection of this tube based on a maximum indication of 25% through wall.
      • Preventively plugged; due to permeability variations, this tube is considered uninspectable.

2

  • ATTACHMENT 2 SURRY UNIT 2. OCTOBER 1997 REFUELING OUTAGE STEAM GENERATOR "B". EDDY CURRENT EXAMINATION

SUMMARY

In Steam Generator "B", all but two available tubes were inspected full length with bobbin probes. Two row one tubes (R1-C34, R1-C35) were plugged due to restrictions that would not allow the 0.720" bobbin probe to pass through. These two tubes did allow passage of a 0.680 probe. A 683 tube sample was tested with Rotating Pancake Coil (RPC) probes in the hot leg transition (TSH +/- 3") region. A twenty tube sample of the row 1 U-bends was examined with an RPC probe. Supplemental examinations were also performed using bobbin and RPC probes where additional confirmatory or other data was desired. The following tubes were preventively plugged:

Row Column 1 34 1 35 37 59 36 69 40 70 This Steam Generator contains a total of seven plugged tubes. See the attached list for details.

3

~ - - - - - - -

l SURRY 2, STEAM GENERATOR 11 8 11 , OCTOBER 1997 ROW COLUMN INDICATION LOCATION REMARKS 1 34 RST plugged 1 35 RST plugged 37 59 21 AV3 plugged 32 69 12 AV2 36 69 20 AV2 plugged 40 70 25 AV3 plugged 4

. ,;

  • ATTACHMENT 3 GLOSSARY OF TERMS
1. ROW, COL - COLUMN - Tube identifier numbers - an X-Y coordinate system.
2. IND - INDICATION - Character codes and numerics that represent the analysis results of the data for that tube, e.g., RST, 25%, etc.
3. LOCN - LOCATION - The location in the tube of the INDICATION identified.
4. PVN - PERMEABILITY VARIATION - If extreme, may mask actual anomalies or indications.
5. RST - RESTRICTED - Indicates that the probe listed in the record would not physically pass the location specified.
6. 55 - A number in the indication column shows the % through wall depth of the indication.
7. AV1, AV2, AV3, AV4 -Anti-Vibration Bars 1 through 4.

Note: Where no comment appears in the remarks column the tube is still in service.

5