ML19207B863: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 23: | Line 23: | ||
This is our final report on this subject, If further information is desired, please advise. | This is our final report on this subject, If further information is desired, please advise. | ||
,%f | ,%f | ||
/' G | /' G Ve rulvdour. / . | ||
Ve rulvdour. / . | |||
l' '' Y ' | l' '' Y ' | ||
! ,4l/ (/ / | ! ,4l/ (/ / | ||
// /% ' | // /% ' | ||
s f | s f | ||
~ss c. (rmnWr! " ~/ ~ c .[/ | ~ss c. (rmnWr! " ~/ ~ c .[/ | ||
Senior Vice President Pow?e Statien/ | Senior Vice President Pow?e Statien/ | ||
Revision as of 06:18, 2 February 2020
| ML19207B863 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 08/31/1979 |
| From: | Brown S VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| G37A, NUDOCS 7909050440 | |
| Download: ML19207B863 (1) | |
Text
. . . - . .u...-..~- .. ~ . -. . - - -. .. .-. . .. 4 Vepco _ _ _ . _ _ . . _ . _ _
August 31. 1979 Mr. Ja:nes P. O'Reilly, Director Serial No. 637A Office of Inspection & Enforcement PSE&C/JMD:mac:weng U. S. Nuclear Regulatory Commission Region II Docket No. 50-339 101 Marietta Street Suite 3100 Atlanta, Georgis 30303 Daar Mr. O'Reilly:
On August 1, 1979, a report was made under the provisions of 10CFR50.5S(e) concerning component failures in the Westinghouse 7300 Series Process Control Systs.
It was discovered that a f ailure of a component on the 7300 Serias signal comparito 'iAL carl 9sult") in a short.?i condition that ciasad tM 3:seciited 5istable to fail in an unLufe m de. This failure would, ho o//er, he detected by normal M 11t oeriadic tastin1.
The vendor, Westinghouse, has sucolded revisti components (T?xas Instra.vnt 75460 DIM output driver chip with oull-uo resistorsi to correct all NAL cards. The replacements will be completed on North Anna Unit ? orior to fuel loading.
This is our final report on this subject, If further information is desired, please advise.
,%f
/' G Ve rulvdour. / .
l' Y '
! ,4l/ (/ /
// /% '
s f
~ss c. (rmnWr! " ~/ ~ c .[/
Senior Vice President Pow?e Statien/
Engineeying trd Construction ,.
cc: M*. Victor Stello. Director Office of Inspection & Enforcement Harold R. Centon, Director Office of Nuclear Reactor Regulation s.m m o\
s 49 s i ,,
m oee % f