Tv (412) 471 4300 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 March 1, 1979 United States Nuclear Regulatory Commission Attention: Mr. George H. Smith, Chief Fuel Facility and Materials Safety Branch Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Tv (412) 471 4300 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 March 1, 1979 United States Nuclear Regulatory Commission Attention: Mr. George H. Smith, Chief Fuel Facility and Materials Safety Branch Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Line 31:
Line 30:
C. N. Dunn Vice President, Operations Attachment 700330036f
C. N. Dunn Vice President, Operations Attachment 700330036f
*
.
* ~
* ~
. .
DUQUESNE LIGHT COMPANY Beaver Valley Power Station Unit No. 1 REPLY TO NOTICE OF VIOLATION Inspection No. 79-01 Letter Dated February 8,1979 INFRACTION A Description Of Infraction (79-01-01) 10 CFR 71.3, " Requirement for License", requires that no licensee subject to the regulations in this part shall (a) deliver any licensed materiala to a carrier for transport or (b) transport licensed material except as authorized in a general license or specific license issued by the Commission, or as exempted in this part.
DUQUESNE LIGHT COMPANY Beaver Valley Power Station Unit No. 1 REPLY TO NOTICE OF VIOLATION Inspection No. 79-01 Letter Dated February 8,1979 INFRACTION A Description Of Infraction (79-01-01) 10 CFR 71.3, " Requirement for License", requires that no licensee subject to the regulations in this part shall (a) deliver any licensed materiala to a carrier for transport or (b) transport licensed material except as authorized in a general license or specific license issued by the Commission, or as exempted in this part.
Contrary to the above, on October 27, 1978,'188 Ci of licensed materials were delivered to a carrier for transport without a general or specific license and no exemption in 10 CFR 71 was applicable.
Contrary to the above, on October 27, 1978,'188 Ci of licensed materials were delivered to a carrier for transport without a general or specific license and no exemption in 10 CFR 71 was applicable.
Revision as of 16:22, 1 February 2020
Responds to NRC 790208 Ltr Re Violations Noted in IE Insp Rept 50-334/79-01.Corrective Actions:Log Is Now Being Used to Ensure Sample Records Are Filed on Time
L-99-071, Notifies of License Withdrawal for J Scott,License SOP-11481,due to Resignation from Employment at BVPS
ML20206P124
ML20195C446
IR 05000412/1998009
L-99-084, Forwards Revised marked-up TS & UFSAR Pages to 990303 LARs 259 & 131 Which Revised Qualifications for Operations Mgt & Incorporated Generic Position Titles in Ts.Encl Pages Incorporate NRC Requested Changes,Per Recent Telcon
L-99-086, Forwards Bvps,Unit 2 SG Exam Rept for Aug 1998.Rept Provided to Document Results of SG Eddy Current Exams Performed in Aug 1998.Summary of Insps Provided in Encl 1
L-99-089, Forwards Annual Financial Repts,Including Certified Financial Statements,Of Dqe,Firstenergy Corp,Ohio Edison Co,Pennsylvania Power Co,Cleveland Electric Illuminating Co & Toledo Edison Co,Iaw 10CFR50.71(b)
L-99-090, Forwards Summary Review Completed to Verify Adequacy of Design Basis Accident Thermal Overpressure Protection for BVPS Unit 2 Containment Penetrations,Per Request
ML20195H373
ML20207G261
ML20207G872
L-99-095, Provides Addl Info to Support LARs 262 & 135,in Response to NRC 990527 Verbal Request.Info Describes Performance of Unit 1 Rod Position Indication Sys & Provides Some Background Info Re Normal Operation of Sys
L-99-100, Forwards Typed,Final TS Pages for LAR 109 Re Rcs.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages Is Provided in Attachment B-109
PY-CEI-NRR-2377, Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1
ML20195J522
ML20195H465
L-99-101, Submits Response to NRC Oral RAI Concerning Qualifications for Senior Nuclear Executive Ref in 10CFR50.80 Submittal
L-99-102, Forwards Typed,Final TS Pages for LARs 259 & 131.Summary of Description of Plant Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages,Encl
L-99-093, Provides Response to RAI on Proposed Change to Operations QA Program Description.Attachment 2 Provides Revised Markup for Proposed Changes to Affected UFSAR Section 17.2.5
L-99-108, Requests Withdrawal of Change Proposed for TS Bases Page B 3/4 2-2 from LARs 1A-262 & 2A-135,originally Submitted by Licensee to NRC
L-99-105, Forwards Response to NRC 990420 RAI Re Previous Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves
ML20207H662
ML20209G570
L-99-111, Forwards Revised Final Typed Pages for LARs 109 & 115, Previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115.With Summary of Editorial Changes
L-99-119, Forwards Rev 17 to UFSAR for Beaver Power Station,Unit 1. Submittal Reflects Changes to Facility & Procedures as Described in UFSAR That Were Completed During Annual Reporting Period Endinig 990122
L-99-120, Forwards Annual Rept of Facility Changes,Tests & Experiments for BVPS Unit 1,IAW 10CFR50.59.Rept Provides Brief Description of Each Facility & Procedure Change & Summary of Safety Evaluations
L-99-121, Submits Data Point Library (Dpl) Changes,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,rev 1,Section 3.6, Administrative Implementation Reqiurements
L-99-124, Requests Withdrawal of Editorial Changes That Do Not Pertain to Transfer of Operating Authority or Plant Ownership That Are Proposed in LARs 269 & 144.Revised mark-up License Pages Reflecting Changes,Attached
L-99-127, Provides Response to NRC Ltr Requesting Review & Comment of NRC Reactor Vessel Structural Integrity Database by 990901.Inconsistencies Noted in Way Data Characterizes Condition of Reactor Vessel
ML20211A511
05000412/LER-1999-007, Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info
ML16342A881
L-99-132, Forwards fitness-for-duty Program Six Month Rept for 990101-990630 for Bvps,Units 1 & 2
L-99-098, Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods
ML20211Q560
ML20211Q343
ML20212B329
L-99-144, Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-03
ML20212C552
ML20212G060
L-99-148, Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 990817
L-99-149, Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion
L-99-013, Forwards Rev 11 to Chapter 57 of BVPS Emergency Preparedness Plan, Vol 1,per 10CFR50.4.Submittal Includes Info Re Implmentation of Severe Accident Management Guidelines.Changes Do Not Decrease Effectiveness of Plan
L-99-032, Requests to Withdraw Part of LARs 246 & 116,modifying Various Reporting Requirements Contained in TS Design Feature Section 5.1.Affidavit,encl
L-99-034, Forwards Typed,Final TS Pages for LAR 111,as Requested by NRC Project Manager.Summary Description of Changes, Provided as Attachment B
ML20207E653
L-99-030, Forwards Response to Violations Noted in Insp Repts 50-334/98-09 & 50-412/98-09.Corrective Actions:Engineering Administrative Procedures Were Reviewed to Ensure That Design Analysis Process Contains Adequate Controls
L-99-042, Submits Info Concerning Property Damage Insurance Coverages for Site of BVPS Located in Borough of Shippingport,County of Beaver & Commonwealth of PA
PY-CEI-NRR-2264, Forwards Firstenergy Corp Annual Rept for 1998 & 1999 Internal Cash Flow Projection as Evidence of Util Guarantee of Retrospective Premiums Which May Be Served Against Facilities
ML20205F681
ML20205H617
L-99-051, Provides Response to NRC Request to Maintain Change That Was Proposed to Be Deleted in LAR 214 & 81,submitted 980709.New Marked Up TS Pages Are Encl
ML20206N336
05000334/LER-1998-015-01, Forwards LER 98-015-01, Inadequate Performance of Channel Functional Tests, Per 10CFR50.73(a)(2)(i).Restatement of Corrective Action Provided with Underlined Words to Clarify Intent
L-99-055, Forwards Disk Containing Annual Exposure Rept for 1998. Attachment 1 Is Description of File Structure of Transmitted Data.Without Disk
ML20196F671
L-99-070, Requests Enforcement Discretion Re Compliance with TS 3.7.13.1 Action Statement,To Allow for Continued Plant Operation Beyond 7 Day Action Time for Sufficient Time to Complete Required Repairs & Perform Post Maint Testing
L-99-067, Forwards Rev 11 to UFSAR for Bvps,Unit 2, Replacement Pages.Submittal Reflects Changes to Facility & Procedures as Described in Ufsar,Completed During Annual Reporting Period Ending 981031
L-99-072, Informs of Resignation of J Witter,License SOP-11376,from Employment at Bvps,Unit 2,per 10CFR50.74(b).Util Requests Withdrawal of Subject License
L-98-077, Informs of Change in Scheduled Completion Date for Commitments Made in LERs 98-020-00 & 98-020-01.Util Believes That Listed Change Does Not Represent Challenge to Plant Safety
L-99-071, Notifies of License Withdrawal for J Scott,License SOP-11481,due to Resignation from Employment at BVPS
L-99-084, Forwards Revised marked-up TS & UFSAR Pages to 990303 LARs 259 & 131 Which Revised Qualifications for Operations Mgt & Incorporated Generic Position Titles in Ts.Encl Pages Incorporate NRC Requested Changes,Per Recent Telcon
L-99-089, Forwards Annual Financial Repts,Including Certified Financial Statements,Of Dqe,Firstenergy Corp,Ohio Edison Co,Pennsylvania Power Co,Cleveland Electric Illuminating Co & Toledo Edison Co,Iaw 10CFR50.71(b)
L-99-086, Forwards Bvps,Unit 2 SG Exam Rept for Aug 1998.Rept Provided to Document Results of SG Eddy Current Exams Performed in Aug 1998.Summary of Insps Provided in Encl 1
L-99-090, Forwards Summary Review Completed to Verify Adequacy of Design Basis Accident Thermal Overpressure Protection for BVPS Unit 2 Containment Penetrations,Per Request
ML20195H373
L-99-100, Forwards Typed,Final TS Pages for LAR 109 Re Rcs.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages Is Provided in Attachment B-109
L-99-095, Provides Addl Info to Support LARs 262 & 135,in Response to NRC 990527 Verbal Request.Info Describes Performance of Unit 1 Rod Position Indication Sys & Provides Some Background Info Re Normal Operation of Sys
ML20195H465
PY-CEI-NRR-2377, Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1
ML20195J522
L-99-101, Submits Response to NRC Oral RAI Concerning Qualifications for Senior Nuclear Executive Ref in 10CFR50.80 Submittal
L-99-102, Forwards Typed,Final TS Pages for LARs 259 & 131.Summary of Description of Plant Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages,Encl
L-99-093, Provides Response to RAI on Proposed Change to Operations QA Program Description.Attachment 2 Provides Revised Markup for Proposed Changes to Affected UFSAR Section 17.2.5
L-99-108, Requests Withdrawal of Change Proposed for TS Bases Page B 3/4 2-2 from LARs 1A-262 & 2A-135,originally Submitted by Licensee to NRC
L-99-105, Forwards Response to NRC 990420 RAI Re Previous Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves
L-99-111, Forwards Revised Final Typed Pages for LARs 109 & 115, Previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115.With Summary of Editorial Changes
L-99-119, Forwards Rev 17 to UFSAR for Beaver Power Station,Unit 1. Submittal Reflects Changes to Facility & Procedures as Described in UFSAR That Were Completed During Annual Reporting Period Endinig 990122
L-99-120, Forwards Annual Rept of Facility Changes,Tests & Experiments for BVPS Unit 1,IAW 10CFR50.59.Rept Provides Brief Description of Each Facility & Procedure Change & Summary of Safety Evaluations
L-99-121, Submits Data Point Library (Dpl) Changes,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,rev 1,Section 3.6, Administrative Implementation Reqiurements
L-99-124, Requests Withdrawal of Editorial Changes That Do Not Pertain to Transfer of Operating Authority or Plant Ownership That Are Proposed in LARs 269 & 144.Revised mark-up License Pages Reflecting Changes,Attached
L-99-127, Provides Response to NRC Ltr Requesting Review & Comment of NRC Reactor Vessel Structural Integrity Database by 990901.Inconsistencies Noted in Way Data Characterizes Condition of Reactor Vessel
05000412/LER-1999-007, Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info
L-99-132, Forwards fitness-for-duty Program Six Month Rept for 990101-990630 for Bvps,Units 1 & 2
L-99-098, Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods
ML20212B329
L-99-144, Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-03
ML20212C552
ML20212G060
L-99-148, Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 990817
L-99-149, Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion
Tv (412) 471 4300 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 March 1, 1979 United States Nuclear Regulatory Commission Attention: Mr. George H. Smith, Chief Fuel Facility and Materials Safety Branch Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 License No. DPR-66IE Inspection Report No. 79-01
Dear Mr. Smith:
In response to your letter of February 8, 1979 and in accordance with 10 CFR 2.201, the attached reply addresses the Notice of Violation which was included as Appendix A of the referenced Inspection Report. The noted violations involved: (a) shipping radioactive materials without authorization in a general or specific licensa and (b) the failure to maintain records of radioactive material released to the environs.
If you have any questions concerning this response, please contact my office.
Very truly yours, er ~
C. N. Dunn Vice President, Operations Attachment 700330036f
~
DUQUESNE LIGHT COMPANY Beaver Valley Power Station Unit No. 1 REPLY TO NOTICE OF VIOLATION Inspection No. 79-01 Letter Dated February 8,1979 INFRACTION A Description Of Infraction (79-01-01) 10 CFR 71.3, " Requirement for License", requires that no licensee subject to the regulations in this part shall (a) deliver any licensed materiala to a carrier for transport or (b) transport licensed material except as authorized in a general license or specific license issued by the Commission, or as exempted in this part.
Contrary to the above, on October 27, 1978,'188 Ci of licensed materials were delivered to a carrier for transport without a general or specific license and no exemption in 10 CFR 71 was applicable.
Discussion Of Infraction Because this was the station's first type B shipment, chere was an uncertainty as to whether the vendor or Duquesne Light Company was responsible for the notification prior to the first use. Now that this requirement is understood, corrective steps have been made and a letter has been sent to the Director, Office of Nuclear Material Safety and Safeguards, registering a cask daat will be used in a subsequent shipment.
Compliance has been achieved at this time and no further action is plcnned.
DEFICIENCY B Description Of Deficiency (79-01-02)
Technical Specification (TS) 6.10.2.e requires that the licensee maintain records of gaseous and liquid radioactive material released to the environs for the duration of the facility.
Contrary to the above, no record was maintained of particulates released via elevated release point VS-107 for the time period March 22-30, 1978.
Discussion Of Deficiency Results of the filter paper analysis are recorded on the applicable Radeon form and stored in the ND 4420 memory. However, in this instance, the computer memory was out of service due to a malfunction and the form used to record the results could not be found. A review of the records indicated that this was the only sample of this type that could not be substantiated. A log is now being used to ensure that the sample records are filed on a timely basis for improved reliability.
Compliance has been achieved at this time and further action is not planned.