ML19207B148: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19207B155
| number = ML19207B155
| issue date = 08/20/1979
| issue date = 08/20/1979
| title = Forwards LER 79-064/03L-0
| title = LER 79-064/03L-0 on 790731:GE Notified Util That Error Existed in Tech Specs for Max Critical Power Ratio.Caused by Use of Incorrect Void Coefficient Data.Revision to Tech Specs Currently Underway
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 09:07, 24 January 2020

Forwards LER 79-064/03L-0
Date released: 08/09/2019 Download: ML19207B148


LER 79-064/03L-0 on 790731:GE Notified Util That Error Existed in Tech Specs for Max Critical Power Ratio.Caused by Use of Incorrect Void Coefficient Data.Revision to Tech Specs Currently Underway
ML19207B155
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/20/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207B155 (1)
Forwards LER 79-064/03L-0
ML19207B147
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/20/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207B147 (1)